Home / Browse projects / Palghar, Maharashtra / Swastik Epitome Building 2 Phase I Ground to 7 floors

Registered Litigation declared Residential / Group Housing project

Swastik Epitome Building 2 Phase I Ground to 7 floors

By Hemant Ramesh Mhatre

RG-MH-27055 · RERA P99000006718 · Last updated on MahaRERA portal: 2 Sep 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 2 complaints at MahaRERA
  • Completion date moved by 88 months
  • 7 extensions taken
  • Rs 26.00 crore secured on the land, in favour of Hinduja Leyland Finance Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 88 months from the original
25 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 95%
60 of 182Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 249 documents Report an error

Swastik Epitome Building 2 Phase I Ground to 7 floors is a Residential / Group Housing project by Hemant Ramesh Mhatre in Palghar, Maharashtra, registered with MahaRERA as P99000006718 on 16 Aug 2017. Possession is promised by 30 Apr 2027. The completion date has moved by 88 months from the original filing. 122 of the 182 units on this registration are recorded sold or booked, and 25 of 55 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSwastik Epitome Building 2 Phase I Ground to 7 floors
  • TypeResidential / Group Housing
  • Location
    • 90 FEET VIRAR NALLASOPARA EAST LINK ROAD
    • BEHIND D MART
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401305
  • Pincode401305
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000006718
  • ReraGenie IDRG-MH-27055

Builder

  • NameHemant Ramesh Mhatre
  • Entity typeIndividual
  • PartnersSWASTIK SPACES LIMITED, HEMANT RAMESH MHATRE
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Aug 2017
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 31 Dec 2019)
  • Buildings5 building records
  • Documents filed249 files

Current status

67%122 of 182 units booked
64.7%Work done, per cost certificate

Figures as on 2 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C WINGNA10728028
D WINGNA10742042
E WINGNA10728028
F WINGNA10742042
G WINGNA10742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 2 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 95%.

C WING84%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
D WING84%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
E WING84%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
F WING84%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
G WING84%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 2 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes50%
Street LightingYes90%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes90%

Parking filed106

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots106
Closed/Covered70
Open Space36
BuildingClosed/CoveredOpen SpaceTotal
C WING9716
D WING20727
E WING17724
F WING20727
G WING4812

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,421 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofHinduja Leyland Finance Limited
Secured amountRs 26.00 crore
CERSAI search filedYes
Declared on21 Jan 2026

Approvals and building plan

Sanctioning authorityVasai Virar City Muncipal Corporation
Permissible FSI7957.31
Proposed, not sanctioned7,957 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop 1 by 15 Ground Floor Makwana Complex Veer Savarkar Road Chandansar Road Virar East 401 305
Estimated costRs 28.12 cr
Cost incurredRs 18.21 cr
Work done64.74%
BuildingWingEstimatedIncurred
-NARs 6.00 cr-
D WINGNARs 5.11 crRs 4.21 cr
F WINGNARs 5.11 crRs 4.21 cr
G WINGNARs 4.66 crRs 3.83 cr
E WINGNARs 3.65 crRs 3.01 cr
C WINGNARs 3.58 crRs 2.95 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEN CON
EngineerJW CONSULTANTS LLP
Chartered AccountantASHUTOSH VIDWANS
Chartered AccountantASHUTOSH
PartnerRole in project
Hemant Ramesh Mhatre-

Extensions applied for7

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P99000006718/WarDec 2019 → Apr 2027

Reason as filed by the promoterNA

EXT99000003834Dec 2019 → Dec 2020

Reason as filed by the promoterDelay in receiving CC/RDP for above floors (phase - 2). Work could not be completed due to the delay of higher floors

EXT99000011209Dec 2019 → Mar 2022

Reason as filed by the promoterDue to delay in receiving permission and approvals to the said project from the respective competent authority.

EXT99000011676Dec 2019 → Sep 2022

Reason as filed by the promoterThe project is delayed due to worldwide Pandemic situation and unforeseen circumstances i.e. non-availability of labour, materials and lack of customer demand occurred

EXT99000017823Dec 2019 → Aug 2024

Reason as filed by the promoterWe hereby notify that there has been a delay in completion of the project due to non-availability of labour, materials and lack of customer demand during Covid 19 which has also led to financial crisis hindering the completion of the project.

EXT99000024904Dec 2019 → Oct 2025

Reason as filed by the promoterWe hereby notify that there has been a delay in completion of the project due to non-availability of labour, materials and lack of customer demand during Covid 19 which has also led to hindering the completion of the project.

EA08042620578Dec 2019 → Dec 2026

Reason as filed by the promoterWe hereby notify that the project is duly completed except the external amenities which are already in process. Also, we are awaiting for the occupation certificate to be issued from the competent authority. Hence we request you to kindly provide extension for the project as we expecting the certificate at the earliest.

Litigation declared1

CaseCourtStatus
220/2023/2023Civil CourtOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000210372NEVILLE K IRANIM/S SWASTIK EPITOME DEVELOPERS17/03/2022
CC12400797ANIRUDHA ARVIND MHATREHemant Ramesh Mhatre16/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Oct 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed249

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 249 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM1 PHI 30 06 2026.pdf2 Sep 2026
Withdrawal Update Form 1File: FORM1 PHI 30 06 2026.pdf2 Sep 2026
Withdrawal Update Form 2File: FORM2-ENGINEER CERTIFICATE-PH I-June26.pdf2 Sep 2026
Withdrawal Update Form 2File: FORM2-ENGINEER CERTIFICATE-PH I-June26.pdf2 Sep 2026
Withdrawal Update Form 3File: FORM3-PHI-June 26.pdf2 Sep 2026
Withdrawal Update Form 3File: FORM3-PHI-June 26.pdf2 Sep 2026
Form 2A (FY 2022-2023)File: Form-2A Quality Assurance22-23.pdf17 Aug 2026
Form 2A (FY 2025-2026)File: FORM-2A-QUALITY ASSURANCE-PH-I-25-26.pdf16 Aug 2026
Form 2A (FY 2024-2025)File: FORM-2A-QUALITY ASSURANCE-PH-I-24-25.pdf16 Aug 2026
Form 2A (FY 2023-2024)File: FORM 2A- QUALITY ASSURANCECERTIFICATE-23-24.pdf16 Aug 2026
Form 2A (FY 2019-2020)File: FORM 2A- QUALITY ASSURANCE CERTIFICATE-19-20.pdf16 Aug 2026
Form 2A (FY 2021-2022)File: Form 2A Quality Assurance-21-22.pdf16 Aug 2026
Form 2A (FY 2020-2021)File: FORM-2A-2021.pdf16 Aug 2026
Form 5 (FY 2024-2025)File: PHI-FORM5-24-25.pdf11 Aug 2026
Form 5 (FY 2020-2021)File: FORM5-PH1 20-21.pdf11 Aug 2026
Form 5 (FY 2019-2020)File: PHI-Form 5 FY 19-20.pdf11 Aug 2026
Withdrawal Update Form 1File: PHI-FORM1-ARCHITECT CERTIFICATE-Mar 26.pdf4 Aug 2026
Withdrawal Update Form 2File: FORM2-PH I-MARCH 2026.pdf4 Aug 2026
Withdrawal Update Form 3File: FORM3-PH I-MARCH 2026.pdf4 Aug 2026
Withdrawal Update Form 1File: PHI-FORM1-ARCHITECT CERTIFICATE-Mar 26.pdf25 Jul 2026
Withdrawal Update Form 2File: FORM2-PH I-MARCH 2026.pdf25 Jul 2026
Withdrawal Update Form 3File: FORM3-PH I-MARCH 2026.pdf25 Jul 2026
Form 5 (FY 2021-2022)File: PH-I-Form5 -21-22.pdf27 Apr 2026
Form 5 (FY 2022-2023)File: PHI-FORM5-CA Certificate-22-23.pdf27 Apr 2026
Form 5 (FY 2025-2026)File: PHI-FORM5-25-26.pdf23 Apr 2026
Form 5 (FY 2023-2024)File: FORM5-CA CERTIFICATE-23-24-PH-I.pdf13 Apr 2026
Withdrawal Update Form 1File: PH-I-FORM1- ARCHITECT CERTIFICATE-30 DEC 2025.pdf27 Mar 2026
Withdrawal Update Form 1File: PH-I-FORM1- ARCHITECT CERTIFICATE-30 DEC 2025.pdf27 Mar 2026
Withdrawal Update Form 1File: PH-I-FORM1- ARCHITECT CERTIFICATE-30 DEC 2025.pdf27 Mar 2026
Withdrawal Update Form 1File: PH-I-FORM1- ARCHITECT CERTIFICATE-30 DEC 2025.pdf27 Mar 2026
Withdrawal Update Form 2File: PH-I-FORM-2- OCT TO DEC 25.pdf27 Mar 2026
Withdrawal Update Form 2File: PH-I-FORM-2- OCT TO DEC 25.pdf27 Mar 2026
Withdrawal Update Form 2File: PH-I-FORM-2- OCT TO DEC 25.pdf27 Mar 2026
Withdrawal Update Form 2File: PH-I-FORM-2- OCT TO DEC 25.pdf27 Mar 2026
Withdrawal Update Form 3File: PH-I-FORM-3-OCT TO DEC 25.pdf27 Mar 2026
Withdrawal Update Form 3File: PH-I-FORM-3-OCT TO DEC 25.pdf27 Mar 2026
Withdrawal Update Form 3File: PH-I-FORM-3- APR TO JUNE 25.pdf27 Mar 2026
Withdrawal Update Form 3File: PH-I-FORM-3- JUL TO SEPT 25.pdf27 Mar 2026
Form 1File: PH-I-FORM1- ARCHITECT CERTIFICATE.pdf4 Mar 2026
Form 2File: PH-I-FORM 2-ENGINEER CERTIFICATE.pdf4 Mar 2026
Form 3File: PH-I-FORM-3-CA.pdf4 Mar 2026
Disclosure of Sold and Booked InventoryFile: PH-I-Disclosure of sold and booked inventory.pdf4 Mar 2026
OthersFile: PH-I-Form5 -21-22.pdf14 Feb 2026
Form 1File: form1 Rera- C-- G wing.pdf14 Feb 2026
Form 2File: FORM-2A-2021.pdf14 Feb 2026
Form 3File: Form5 -21-22.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold.pdf14 Feb 2026
Form 1File: FORM 1 RERA- C-G wing.pdf14 Feb 2026
Form 2File: Form -2C.pdf14 Feb 2026
Form 3File: FORM5-PH1 20-21.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold.pdf14 Feb 2026
Form 1File: FORM 1 RERA- C-G wing.pdf14 Feb 2026
Form 2File: Form -2C.pdf14 Feb 2026
Form 3File: FORM5-PH1 20-21.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold.pdf14 Feb 2026
Form 1File: form1 Rera- C-- G wing.pdf14 Feb 2026
Form 2File: Form -2C.pdf14 Feb 2026
Form 3File: FORM5-PH1 20-21.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold.pdf14 Feb 2026
Form 1File: FORM 1 RERA- C-G wing.pdf14 Feb 2026
Form 2File: Form -2C.pdf14 Feb 2026
Form 3File: FORM5-PH1 20-21.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold.pdf14 Feb 2026
Form 1File: form1 Rera- C-- G wing.pdf14 Feb 2026
Form 2File: Form -2C.pdf14 Feb 2026
Form 3File: FORM5-PH1 20-21.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold.pdf14 Feb 2026
Form 1File: FORM - 1 C - G 1.pdf14 Feb 2026
Form 2File: FORM-2-Engineer Certificate.pdf14 Feb 2026
Form 3File: Certifcate CA Form 3.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold list-PH1.pdf14 Feb 2026
Form 2File: FORM-2-Engineer Certificate.pdf14 Feb 2026
Form 3File: Certifcate CA Form 3.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold list-PH1.pdf14 Feb 2026
Form 1File: FORM 1 RERA- C-G wing.pdf14 Feb 2026
Form 1File: form1 Rera- C-- G wing.pdf14 Feb 2026
Form 2File: Form -2C.pdf14 Feb 2026
Form 3File: Form 5 FY 19-20.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold list-PH1.pdf14 Feb 2026
Form 1File: form1 Rera- C-- G wing.pdf14 Feb 2026

How this compares with Palghar

67%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 88 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Swastik Epitome Building 2 Phase I Ground to on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BEHIND D MART3,200+ in Palghar

2 kmSwastik Epitome BuildingCompleted 79Lapsed / revoked 50Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 229 registered projects within 2 km.

Builder: Hemant Ramesh Mhatre

Hemant Ramesh Mhatre has 3 registrations on MahaRERA, including Swastik Epitome Building 2 Phase I Ground to 7 floors and Swastik Epitome Building 2 Phase II 8 to 14 floors. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Swastik Epitome Building 2 Phase I Ground to 7 floors is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swastik Epitome Building 2 Phase I Ground to 7 floors?

The registered promoter entity is Hemant Ramesh Mhatre, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swastik Epitome Building 2 Phase I Ground to 7 floors?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Swastik Epitome Building 2 Phase I Ground to 7 floors?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Swastik Epitome Building 2 Phase I Ground to 7 floors?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swastik Epitome Building 2 Phase I Ground to 7 floors?

The professionals named in the filing: Architect: EN CON; Engineer: JW CONSULTANTS LLP; Chartered Accountant: ASHUTOSH VIDWANS; Chartered Accountant: ASHUTOSH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swastik Epitome Building 2 Phase I Ground to 7 floors?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swastik Epitome Building 2 Phase I Ground to 7 floors. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swastik Epitome Building 2 Phase I Ground to to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.