ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Swaroop Aditya Avenue

Registration lapsed No litigation declared Commercial project

Swaroop Aditya Avenue

By Swaroop Aditya Developer

RG-MH-86845 · RERA P51800017168 · Last updated on MahaRERA portal: 25 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 23 months
  • 2 extensions taken
  • Rs 65.25 crore secured on the land, in favour of Aditya Birla Finance Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 10%
83 of 179Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Swaroop Aditya Avenue is a Commercial project by Swaroop Aditya Developer in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800017168 on 17 Jul 2018. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 23 months from the original filing. 96 of the 179 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSwaroop Aditya Avenue
  • TypeCommercial
  • Location
    • Marol J B Nagar Pipe line road
    • Pipe Line Road
    • Andheri
    • Mumbai Suburban
    • 400059
  • Pincode400059
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800017168
  • ReraGenie IDRG-MH-86845

Builder

  • NameSwaroop Aditya Developer
  • Entity typePartnership
  • PartnerRoshanlal C Agarwal

Key dates

16 months past promisethis monthRegisteredJul 2018First promiseJul 2023Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Jul 2018
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 1 Jul 2023)
  • Buildings1 building record
  • Documents filed67 files

Current status

54%96 of 179 units booked

Figures as on 25 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Swaroop Aditya AvenueNA15130179179

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 10%.

Swaroop Aditya Avenue: 28% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes20%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed132

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots132
Closed/Covered132

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,084 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Ltd
Secured amountRs 65.25 crore
CERSAI search filedYes
Declared on18 Jul 2025

Approvals and building plan

Sanctioning authorityBMC
Permissible FSI2084.0
Proposed, not sanctioned2,084 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA K Plaza, Goregaon West, Mumbai

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHORIZON ARCHITECTS
EngineerSHUBHANGI CONSTRUCTIONS
Chartered AccountantR D SATRA & ASSOCIATES
Chartered AccountantRANK & Associates
PartnerRole in project
Swaroop Aditya Developer-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800016704Jul 2023 → Jun 2024

Reason as filed by the promoter1. Project got extended for completion due to delay of permissions and approvals required from the concerned departments. 2. Also due to Covid-19 there was unavailability of labours and construction materials on site.

EXT51800024243Jul 2023 → Jun 2025

Reason as filed by the promoterDelay in endorsement of Commencement Certificate up till 13th Floor by the concerned authority.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 march 25.pdf25 Jul 2025
Form 2File: FORM 2.pdf25 Jul 2025
Form 3File: FORM 3.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: SAA Inventory list (1).pdf25 Jul 2025
Details of encumbrancesFile: ABFL_Encumbrance_updated_061002 (1).pdf11 Apr 2025
Details of encumbrancesFile: Finance Encrumbance.PDF31 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_FY 23-24_Signed.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT LETTER FORM 1.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-compressed.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A-compressed.pdf6 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: 2418301_FurtherCC_signed_240320_141127.pdf1 Jul 2024
Declaration about Commencement CertificateFile: Declarartion about CC_Aditya Avenue (1).pdf1 Jul 2024
Declaration in FORM BFile: Swaroop Aditya Form B.pdf1 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT LETTER FORM 1.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-compressed.pdf1 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A-compressed.pdf1 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY-compressed.pdf1 Jul 2024
Certificates of CA (Form 3)File: FORM 3-compressed.pdf1 Jul 2024
CERSAI detailsFile: CERSAI_Search_Report_200288716316_For_Asset_Based_Search_01_12_2023_13_12_21_166.pdf1 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf9 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineer's Certificate.pdf7 Nov 2023
Certificates of CA (Form 3)File: Form 3- CA Cerificate.pdf7 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-2023.PDF29 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22 SAA.pdf29 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21SAA.pdf2 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 21-22 SAA.pdf2 Jun 2023
Proforma of Agreement for saleFile: Agreement For Sale- Swaroop Aditya Avenue.pdf2 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (revised).pdf24 May 2023
Declaration about Commencement CertificateFile: Declarartion about CC.pdf13 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect certificate.PDF13 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineer's Certificate-compressed.pdf13 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-2022.PDF13 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2022-2023.PDF13 May 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory-compressed.pdf13 May 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 914.PDF13 May 2023
Certificates of CA (Form 3)File: Form 3 CA-compressed.pdf13 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Disclouser of interest in other real estate project.PDF13 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Declaration about separate bank account.PDF13 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A-compressed.pdf13 May 2023
Layout approvalFile: plan.pdf11 May 2023
PAN CardFile: DOC-20230428-WA0002.pdf11 May 2023
Copy of Layout Approval (in case of layout)File: plan.pdf11 May 2023
Commencement Certificates / NA Order for plotted developmentFile: 2375289_FurtherCC_signed.pdf11 May 2023
Layout approvalFile: approved iod 13 floors_compressed (1)_compressed 359 kb_compressed[3082].pdf2 Dec 2022
Copy of Layout Approval (in case of layout)File: approved iod 13 floors_compressed (1)_compressed 359 kb_compressed[3082].pdf2 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: 2354425_FurtherCC_signed (1).pdf1 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE 2021.PDF17 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ASSURANCE 2020.PDF16 Jul 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold flat Details.pdf16 Jul 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold flat Details.pdf16 Jul 2021
Declaration about Commencement CertificateFile: CC Declaration.PDF15 Jul 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold flat details.PDF15 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - FY 2019-2020 (1).pdf15 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Swaroop Avenue_18-19_signed.pdf7 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC.pdf21 May 2019
Details of encumbrancesFile: Declaration for encumbrances.PDF21 Jan 2019
Building plan approvalFile: IOD 179.pdf9 Jul 2018
Layout approvalFile: Approved plan 1 mb.pdf9 Jul 2018
Copy of the legal title reportFile: Titel Certificate swaroop aditya developer (1)-ilovepdf-compressed.pdf9 Jul 2018
Details of encumbrancesFile: Declaration Swaroop Aditya.pdf9 Jul 2018
Copy of Layout Approval (in case of layout)File: Approved plan 1 mb.pdf9 Jul 2018
Building Plan Approval (IOD)File: IOD 179.pdf9 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: furthercc_signed.pdf9 Jul 2018
Declaration in FORM BFile: Form B.pdf9 Jul 2018
Certificates of CA (Form 3)File: CA certificate.PDF9 Jul 2018
Proforma of Allotment letterFile: Swaroop Aditya Avenue Allotment Letter RERA format _final.pdf9 Jul 2018

How this compares with Mumbai Suburban

54%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 23 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Swaroop Aditya Avenue on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pipe Line Road6,700+ in Mumbai Suburban

2 kmSwaroop Aditya AvenueCompleted 3Lapsed / revoked 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: Swaroop Aditya Developer

Swaroop Aditya Developer has 1 registration on MahaRERA, including Swaroop Aditya Avenue. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Swaroop Aditya Avenue shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Swaroop Aditya Avenue is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swaroop Aditya Avenue?

The registered promoter entity is Swaroop Aditya Developer, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swaroop Aditya Avenue?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Swaroop Aditya Avenue?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swaroop Aditya Avenue?

The professionals named in the filing: Architect: HORIZON ARCHITECTS; Engineer: SHUBHANGI CONSTRUCTIONS; Chartered Accountant: R D SATRA & ASSOCIATES; Chartered Accountant: RANK & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swaroop Aditya Avenue?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swaroop Aditya Avenue. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swaroop Aditya Avenue to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.