Swarali Apartments Condominium

By Revive Homes LLP

RG-MH-19339 · RERA P52100078468 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 11 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 11 months from the original
2 of 11Construction stages donefurthest along: Internal walls, 80%
18 of 19Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Swarali Apartments Condominium is a Residential / Group Housing project by Revive Homes LLP in Pune, Maharashtra, registered with MahaRERA as P52100078468 on 12 Dec 2024. Possession is promised by 30 Apr 2027. The completion date has moved by 11 months from the original filing. 1 of the 19 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSwarali Apartments Condominium
  • TypeResidential / Group Housing
  • Location
    • -
    • Tejasnagar
    • Kothrud
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • RERA no.P52100078468
  • ReraGenie IDRG-MH-19339

Builder

  • NameRevive Homes LLP
  • Entity typePartnership
  • PartnersRahul Hemraj Mundada, Atul Hemraj Mundada
  • Partner cum Authorized SignatoryRahul Vinaykumar Abhyankar
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

this monthRegisteredDec 2024First promiseMay 2026Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Dec 2024
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 31 May 2026)
  • Buildings1 building record
  • Documents filed73 files

Current status

5%1 of 19 units booked
54.8%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Swarali Apartments CondominiumNA6619019

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

Swarali Apartments Condominium: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered17

Land and ownership23

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area900 sq m
Land owned byThe promoter, with other names on the file
Named landowners23
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Jun 2025
LandownerVillageDistrict
Mrs. Saroj M KulkarniKothrudPune
Mr. Mahadev Ankush DivekarKothrudPune
Mrs. Manisha Mahadev DivekarKothrudPune
Smt. Smita Vasant SohoniKothrudPune
Mr. Milind Vasant SohoniKothrudPune
Mrs Sudeshna Sanjay BhendeKothrudPune
Mrs Nisha Aniruddha ParanjapeKothrudPune
Mr. Aniruddha Kamalakar ParanjapeKothrudPune
Mrs. Bhamini Anil SuktankarKothrudPune
Mr. Anil Gopal SuktankarKothrudPune
Mr. Milind Pandharinath KulkarniKothrudPune
Mr. Ashutosh Nandkishor RanadeKothrudPune
Manda Karandikar Died Thr LRs Milind KarandikarKothrudPune
Manda Karandikar died thr LRS Madhav KarandikarKothrudPune
Smt Anushri Shriprakash SomanKothrudPune
Mr Aniruddh Mukund KendurkarKothrudPune
Mr. Ashutosh Mukund KendurkarKothrudPune
Mr Gajanan Dinkar JadhavKothrudPune
Mr Anup Sandeep ValunjkarKothrudPune
Smt Meena ValunjkarKothrudPune
Mr Vinayak Dattatray GupteKothrudPune
Mrs. Aparna Suhas ValunjkarKothrudPune
Mr. Suhas Laxman ValunjkarKothrudPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI2015.28
Proposed, not sanctioned2,015 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Plot No. 1, S. No. 15/1, Sarthak Terraces, Opp. Gandhi Lawns, Kothrud, Pune.411038
Estimated costRs 7.23 cr
Cost incurredRs 3.96 cr
Work done54.83%
BuildingWingEstimatedIncurred
Swarali Apartments CondominiumNARs 6.73 crRs 3.90 cr
-NARs 50.00 lakhRs 6.30 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Anup Deshpande
EngineerMangesh S Jagtap
EngineerPradip Biradar
Chartered AccountantGUNDETI NIRMAL & CO
PartnerRole in project
Revive Homes LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100078468/WarMay 2026 → Apr 2027

Reason as filed by the promoterNA

EA11072621725May 2026 → Dec 2026

Reason as filed by the promoterThe construction work for the project *"Swarali"* has progressed substantially, and approximately *80% of the overall work has already been completed*. The remaining works are primarily related to finishing activities and the completion of ancillary infrastructure. However, owing to the prevailing global circumstances arising from the ongoing world war, the construction industry has been significantly affected by disruptions in international supply chains, resulting in an acute shortage of essential building materials. In addition, delays in procurement, increased transportation timelines, flu

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jul 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jul 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Swarali Form 2A 25-26 SYSTEM GENERATED( NEW) .pdf10 Jul 2026
Layout approvalFile: 1-4 Layout SANCTIONED PLAN APR 25 Compress .pdf2 Jul 2026
Building plan approvalFile: 2-4 FULL POTENTIAL SANCTIONED PLAN APR 25.pdf2 Jul 2026
Building plan approvalFile: 3-4 FULL POTENTIAL SANCTIONED PLAN APR 25.pdf2 Jul 2026
Building plan approvalFile: 4-4 FULL POTENTIAL SANCTIONED PLAN APR 25.pdf2 Jul 2026
Withdrawal Update Form 1File: Form 1 Swarali .pdf2 Jul 2026
Withdrawal Update Form 1File: Form 1 Swarali .pdf2 Jul 2026
Withdrawal Update Form 2File: Form 2 swarali .pdf2 Jul 2026
Withdrawal Update Form 2File: Form 2 swarali .pdf2 Jul 2026
Withdrawal Update Form 3File: SWARALI FORM 3 new - 2026.pdf2 Jul 2026
Withdrawal Update Form 3File: SWARALI FORM 3 new - 2026.pdf2 Jul 2026
Form 5 (FY 2024-2025)File: FORM 5 SWARALI.pdf2 Jul 2026
Form 1File: Form 1 .pdf30 Jun 2026
Form 2File: Forn 2 .pdf30 Jun 2026
Form 3File: SWARALI FORM 3 new .pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: SWARALI SOLD UNSOLD INVENTOEY DISCLOSURE .pdf30 Jun 2026
Form 1File: Form 1 Swarali .pdf30 Jun 2026
Form 2File: Form 2 swarali .pdf30 Jun 2026
Form 3File: SWARALI FORM 3 new - 2026.pdf30 Jun 2026
Disclosure of Sold and Booked InventoryFile: SWARALI Disclosure of sold unsold inventory 26.pdf30 Jun 2026
Form 2A (FY 2024-2025)File: SWARALI FORM 2A 2025 (1).pdf30 Jun 2026
Form 1File: FORM 1 .pdf14 Mar 2026
Form 2File: FORM 2 .pdf14 Mar 2026
Form 3File: FORM 3.pdf14 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold Inventory .pdf14 Mar 2026
Form 1File: Q3 FORM 1 .pdf30 Dec 2025
Form 2File: Q3 FORM 2 .pdf30 Dec 2025
Form 3File: Q3 FORM 3 .pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Enventry Q3 .pdf30 Dec 2025
Form 1File: Q4 FORM 1.pdf30 Dec 2025
Form 2File: Q4 FORM 2 .pdf30 Dec 2025
Form 3File: Q4 FORM 3 .pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Inventry .pdf30 Dec 2025
Form 1File: Q1 FORM 1 .pdf30 Dec 2025
Form 2File: Q1 FORM 2 .pdf30 Dec 2025
Form 3File: Q1 FORM 3 .pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold Booked Inventry Q1 .pdf30 Dec 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SWARALI - 3 BANK OPENING DECLARATION.pdf2 Dec 2024
Other - FinanceFile: SWARALI - 3 BANK OPENING DECLARATION.pdf2 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: SWARALI - 3 BANK OPENING DECLARATION.pdf2 Dec 2024
Other - TechnicalFile: DECLARATON - ONE PLOT.pdf18 Oct 2024
Other - TechnicalFile: Email CC VERIFICATION PMC.pdf18 Oct 2024
Details of encumbrances concerned to FinanceFile: DECLARATION - FINANCE and LEGAL.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: DECLARATION - FINANCE and LEGAL.pdf8 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF SECURED - UNSECURED LOAN.pdf19 Jul 2024
Declaration in FORM BFile: FORM B Promoter Revised.pdf13 Jul 2024
Proforma of Agreement for saleFile: ARTICLES OF AGREEMENT of Swarali Apartment.pdf13 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORM B - SWARALI.pdf13 Jul 2024
Copy of the legal title reportFile: Title and Search Report RERA - Updated.pdf28 Jun 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf28 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Latest Form-3 _compressed.pdf28 Jun 2024
Declaration about Commencement CertificateFile: FORMAT D.pdf28 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORM A - SWARALI.pdf28 Jun 2024
Deviation Report with respect to Allotment letterFile: DEVIATION - ALLOTMENT LETTER .pdf28 Jun 2024
Building plan approvalFile: Swarali SANCTIONED PLAN PMC-4.pdf23 May 2024
Building plan approvalFile: Swarali SANCTIONED PLAN PMC-3.pdf23 May 2024
Building plan approvalFile: Swarali SANCTIONED PLAN PMC-2.pdf23 May 2024
Layout approvalFile: Swarali SANCTIONED PLAN PMC-1.pdf23 May 2024
PAN CardFile: 1 PAN Card.pdf23 May 2024
Details of encumbrances concerned to FinanceFile: DECLARATION - FINANCE and LEGAL.pdf23 May 2024
Copy of Layout Approval (in case of layout)File: Swarali SANCTIONED PLAN PMC-1.pdf23 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 -SWARALI .pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Latest FORM 2 - SWARALI 20-11-24.pdf23 May 2024
Commencement Certificates / NA Order for plotted developmentFile: SWARALI - COMMENCEMENT CERTIFICATE.pdf23 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Swarali SANCTIONED PLAN PMC-2.pdf23 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Swarali SANCTIONED PLAN PMC-3.pdf23 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Swarali SANCTIONED PLAN PMC-4.pdf23 May 2024
CERSAI detailsFile: CERSAI REPORT.pdf23 May 2024
Details of encumbrances concerned to LegalFile: DECLARATION - FINANCE and LEGAL.pdf23 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report- AGREEMENT TO SALE.pdf23 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A - ATUL MUNDADA.pdf23 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A - RVA.pdf23 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A- R MUNDADA.pdf23 May 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
RAHUL PARK CO OPERATIVE HOUSING SOCIETYRAMBAUGH COLONY KOTHRUD35CompletedSep 2023Apr 2023
SHREE APARTMENTMODEL COLONY10CompletedMar 2022Oct 2021

How this compares with Pune

5%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 11 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Swarali Apartments Condominium on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tejasnagar13,700+ in Pune

Builder: Revive Homes LLP

Revive Homes LLP has 6 registrations on MahaRERA, including Shree Apartment and Rahul Park. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Swarali Apartments Condominium is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swarali Apartments Condominium?

The registered promoter entity is Revive Homes LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swarali Apartments Condominium?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Swarali Apartments Condominium?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swarali Apartments Condominium?

The professionals named in the filing: Architect: Mr Anup Deshpande; Engineer: Mangesh S Jagtap; Engineer: Pradip Biradar; Chartered Accountant: GUNDETI NIRMAL & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swarali Apartments Condominium?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swarali Apartments Condominium. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swarali Apartments Condominium to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.