Daksh Avlon

By DAKSH REALTY

RG-MH-07053 · RERA P51600076758 · Last updated on MahaRERA portal: 19 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 18%
115 of 124Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Daksh Avlon is a Others project by DAKSH REALTY in Nashik, Maharashtra, registered with MahaRERA as P51600076758 on 28 Jun 2024. Possession is promised by 8 Mar 2029. 9 of the 124 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameDaksh Avlon
  • TypeOthers
  • Location
    • Near Wisdom High School Rameshwar Nagatr
    • Balwant Nagar
    • Aanandwali
    • Nashik
    • 422007
  • Pincode422007
  • RERA no.P51600076758
  • ReraGenie IDRG-MH-07053

Builder

  • NameDAKSH REALTY
  • Entity typePartnership
  • GSTIN27AAUFD6820H1Z3
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersKETANKUMAR MAGANBHAI LADANI, DAKSH KETANKUMAR LADANI
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2024PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jun 2024
  • Promised completion8 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

7%9 of 124 units booked
21.4%Work done, per cost certificate

Figures as on 19 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Daksh AvlonNA13139628124

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 18%.

Daksh Avlon: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure18%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed316

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots316
Closed/Covered300
Open Space16

Land and ownership12

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,895 sq m
Land owned byThe promoter, with other names on the file
Named landowners12
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Dec 2025
LandownerVillageDistrict
Lata Prabhakar GangurdeAanandwaliNashik
Sharad Shankar GangurdeAanandwaliNashik
Manohar Shankar GangurdeAanandwaliNashik
Bharat Shankar GangurdeAanandwaliNashik
Ratna Sanjay GangurdeAanandwaliNashik
Dhiraj Sanjay GangurdeAanandwaliNashik
Prakash Shankar GangurdeAanandwaliNashik
Vikas Prabhakar GangurdeAanandwaliNashik
Ajay Prabhakar GangurdeAanandwaliNashik
Sandhya Prabhakar GangurdeAanandwaliNashik
Shilpa Sanjay GangurdeAanandwaliNashik
Kirti Sanjay GangurdeAanandwaliNashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI17368.57
Proposed, not sanctioned17,369 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No P/24 Near Sakal Circle MIDC Satpur Dist-Nashik-422007
Estimated costRs 37.00 cr
Cost incurredRs 7.93 cr
Work done21.45%
BuildingWingEstimatedIncurred
Daksh AvlonNARs 37.00 crRs 7.93 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSumit Kumath
EngineerNikunjkumar D Banugariya Dineshkumar Banugariya
EngineerPrasanna Manohar Bhore
Chartered AccountantRushikesh Nandapure Vijay Nandapure
Chartered AccountantAnil Khetamal Dahiya
Chartered AccountantSimran kaur Jeetchander Rait
PartnerRole in project
DAKSH REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 8 Mar 2029

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1-Q4-16-04-2026.pdf19 May 2026
Withdrawal Update Form 2File: Form 2-Q4-16-04-2026.pdf19 May 2026
Withdrawal Update Form 3File: Form 3-Q4-20-04-2026.pdf19 May 2026
Form 5 (FY 2024-2025)File: Form-5 Daksh Ralty-Avlone.pdf16 Mar 2026
Withdrawal Update Form 1File: Form 1-Q3-16-02-26-f.pdf18 Feb 2026
Withdrawal Update Form 2File: _Form 2-Q3-16-02-26-F.pdf18 Feb 2026
Withdrawal Update Form 3File: Form-3 CA Certificate_13-01-26.pdf18 Feb 2026
Withdrawal Update Form 1File: Form 1-Q2-05-10-25.pdf24 Dec 2025
Withdrawal Update Form 2File: Form 2-Q2-05-10-25.pdf24 Dec 2025
Withdrawal Update Form 3File: Form 3 - 13-10-2025 (1).pdf24 Dec 2025
Form 1File: Form 1-Q1-05-07-25.pdf24 Nov 2025
Form 2File: Form 2-Q1-05-07-25.pdf24 Nov 2025
Form 3File: Form 3 Daksh Avlon.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold units-Avilon.pdf24 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Q4-07-04-25-Avlon.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q4-07-04-25-Avlon.pdf9 May 2025
Proforma of Agreement for saleFile: Avlon New Agreement for sale.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Q3-06-01-25.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q3-06-01-25.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Daksh Avlon Form 1 - 30-06-2024.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Daksh Avlon Form 1 - 30-09-2024.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Daksh Avlon Form 2 - 30-06-2024.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Daksh Avlon Form 2 - 30-09-2024.pdf26 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK STATEMENT_merged_organized.pdf28 May 2024
Other - TechnicalFile: NEW FORM B AVLON PDF.pdf28 May 2024
Other - TechnicalFile: Annexure A-Declaration cum undertaking.pdf28 May 2024
Other - TechnicalFile: NMC- EMail-REA51600160351.pdf28 May 2024
Layout approvalFile: Layout Plan_compressed (1).pdf18 May 2024
Building plan approvalFile: Plan 1_compressed.pdf18 May 2024
Building plan approvalFile: Plan 2_compressed.pdf18 May 2024
Building plan approvalFile: Plan 3_compressed.pdf18 May 2024
Building plan approvalFile: Plan 4_compressed.pdf18 May 2024
Building plan approvalFile: Plan 5_compressed.pdf18 May 2024
Building plan approvalFile: Plan 6_compressed.pdf18 May 2024
Building plan approvalFile: Plan 7_compressed.pdf18 May 2024
Building plan approvalFile: Plan 8_compressed.pdf18 May 2024
PAN CardFile: PAN-Daksh Realty.pdf18 May 2024
Copy of the legal title reportFile: Title Report as per RERA_compressed.pdf18 May 2024
Details of encumbrances concerned to FinanceFile: self declaration regarding legal n financal encumbrances .pdf18 May 2024
Details of encumbrances concerned to LegalFile: self declaration regarding legal n financal encumbrances .pdf18 May 2024
Copy of Layout Approval (in case of layout)File: Layout Plan_compressed (1).pdf18 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 1_compressed.pdf18 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 2_compressed.pdf18 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 3_compressed.pdf18 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 4_compressed.pdf18 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 5_compressed.pdf18 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 6_compressed.pdf18 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 7_compressed.pdf18 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 8_compressed.pdf18 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement - avlon.pdf18 May 2024
Declaration about Commencement CertificateFile: declaration abt commencement certificate .pdf18 May 2024
Declaration in FORM BFile: Form B by Developer.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1(1).pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2- Engineer Certificate.pdf18 May 2024
CERSAI detailsFile: ilovepdf_merged (2).pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Daksh Avlon.pdf18 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (1).pdf18 May 2024
Proforma of Agreement for saleFile: Model Agreement For Sale- final-Rera PDF File.pdf18 May 2024
Proforma of Allotment letterFile: allotment letter - AVLON- final-PDF File.pdf18 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A OF BANK.pdf18 May 2024
Deviation Report with respect to Allotment letterFile: deviation report- allotment letter.pdf18 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report- agreement.pdf18 May 2024
Other - LegalFile: self declaration encumbrances all partner's.pdf18 May 2024
Other - FinanceFile: BANK DETAILS.pdf18 May 2024
Other - TechnicalFile: declreation cum undertaking.pdf18 May 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Daksh TriverraP51600056133Pramod Mahajan Udhyan, Nashik103May 2024OngoingMar 2030Not due yet

How this compares with Nashik

7%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Daksh Avlon on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Balwant Nagar4,100+ in Nashik

Builder: DAKSH REALTY

DAKSH REALTY has 3 registrations on MahaRERA, including DAKSH TRIVERRA and Daksh Avlon. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Daksh Avlon is delayed beyond 8 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Daksh Avlon?

The registered promoter entity is DAKSH REALTY, a partnership as per the filing. Its GSTIN 27AAUFD6820H1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Daksh Avlon?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Daksh Avlon?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Daksh Avlon?

The professionals named in the filing: Architect: Sumit Kumath; Engineer: Nikunjkumar D Banugariya Dineshkumar Banugariya; Engineer: Prasanna Manohar Bhore; Chartered Accountant: Rushikesh Nandapure Vijay Nandapure; Chartered Accountant: Anil Khetamal Dahiya; Chartered Accountant: Simran kaur Jeetchander Rait. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Daksh Avlon?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Daksh Avlon. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Daksh Avlon to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.