Home / Browse projects / Satara, Maharashtra / Swapnapurti Sankul

Completed No litigation declared Residential / Group Housing project

Swapnapurti Sankul

By Girijatmaj Developers

RG-MH-11169 · RERA P52700002291 · Last updated on MahaRERA portal: 28 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
217 of 253Construction stages doneacross 23 buildings; furthest along: Staircases, 75%
0Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

Swapnapurti Sankul is a Residential / Group Housing project by Girijatmaj Developers in Satara, Maharashtra, registered with MahaRERA as P52700002291 on 31 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameSwapnapurti Sankul
  • TypeResidential / Group Housing
  • Location
    • Khandala
    • Satara
    • 412802
  • Pincode412802
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700002291
  • ReraGenie IDRG-MH-11169

Builder

  • NameGirijatmaj Developers
  • Entity typePartnership
  • PartnersMahendra krushnarao Ghadge, Sandip Dasharath Kadam

Key dates

this monthRegisteredJul 2017PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings23 building records
  • Documents filed143 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A Wing ANA50000
Building A Wing BNA50000
BUILDING A WING CNA50000
BUILDING A WING DNA50000
BUILDING A WING ENA50000
BUILDING B WING ANA60000
BUILDING B WING BNA60000
ROWHOUSE 1NA30000
ROWHOUSE 2NA30000
ROWHOUSE 3NA30000
ROWHOUSE 4NA30000
ROWHOUSE 5NA30000
ROWHOUSE 6NA30000
ROWHOUSE 7NA30000
ROWHOUSE 8NA30000
ROWHOUSE 9NA30000
ROWHOUSE 10NA30000
ROWHOUSE 11NA30000
ROWHOUSE 12NA30000
ROWHOUSE 13NA30000
ROWHOUSE 14NA30000
ROWHOUSE 15NA30000
ROWHOUSE 16NA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 28 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 23 buildings; the table lists the first 20.

217 of 253 construction stages are filed complete across 23 buildings. The stage furthest along is Staircases, at 75%.

Building A Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building A Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A WING D59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING A WING E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B WING B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 791%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 891%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 982%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 1082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 1182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 1282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROWHOUSE 1382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes10%
Open ParkingNoNot applicable

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered2
Open Space16
BuildingClosed/CoveredOpen SpaceTotal
BUILDING B WING A101
BUILDING B WING B101
ROWHOUSE 1011
ROWHOUSE 2011
ROWHOUSE 3011
ROWHOUSE 4011
ROWHOUSE 5011
ROWHOUSE 6011
ROWHOUSE 7011
ROWHOUSE 8011
ROWHOUSE 9011
ROWHOUSE 10011
ROWHOUSE 11011
ROWHOUSE 12011
ROWHOUSE 13011
ROWHOUSE 14011
ROWHOUSE 15011
ROWHOUSE 16011

Land and ownership11

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,970 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
LandownerVillageDistrict
Girijatmaj DevelopersKhandalaSatara
Hanumant GadhaveKhandalaSatara
Vishnu Dinkar gadhaveKhandalaSatara
GirijatmajdevelopersKhandalaSatara
Shailaja Narayan BhosaleKhandalaSatara
Mangal Dnyanshwar BhosaleShirwalSatara
Ashiwini Bhagwan GadhaveKhandalaSatara
Badam Uttam GadhaveKhandalaSatara
Dattatrya Dinkar GadhaveKhandalaSatara
Laxmi Bhagwan GadhaveKhandalaSatara
Asmita Bhagwan GadhaveKhandalaSatara

Approvals and building plan

Permissible FSI5389.39
Proposed, not sanctioned5,389 sq m
Buildings approved23
Buildings sanctioned23

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNear Tahasil Office, Khandala, Tal Khandala Dist Satara

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajendra Shivaling Jangam
EngineerRamdas Ravasaheb Jagtap
PartnerRole in project
Girijatmaj Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Dec 2024

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: FORM 3.pdf28 Dec 2024
Certificates of CA (Form 5)File: FORM 5.pdf28 Dec 2024
OtherFile: form 4.pdf28 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion certificate.pdf28 Dec 2024
Declaration about Commencement CertificateFile: Complition Certificate.PDF21 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance 2022-2023.pdf21 Mar 2024
Certificates of CA (Form 3)File: Form No 5.pdf21 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No 5 2022 2023.pdf21 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate Building B Wing B .pdf6 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Building B Wing A.pdf6 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Building B Wing A.pdf6 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Building B Wing B.pdf6 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 1.pdf6 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate 1.pdf6 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Girjatmaj_develpors_form_-5_-_21-22.pdf6 May 2023
Certificates of CA (Form 3)File: certificate_of_fianancial_progress_-_20-21.pdf14 Mar 2023
Certificates of CA (Form 3)File: Girjatmmaj_developers_form-3_-_21-22.pdf14 Mar 2023
Certificates of CA (Form 5)File: Girjatmaj_develpors_form_-5_-_21-22.pdf14 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual_report_form-5_-_20-21.pdf14 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Girjatmaj_develpors_form_-5_-_21-22.pdf14 Mar 2023
OtherFile: Row House Complition Certificate.pdf14 Mar 2023
Certificates of CA (Form 3)File: CA Certificate 2021.pdf16 Mar 2022
Certificates of CA (Form 5)File: CA Form No 5 19-20.pdf15 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Form No 5 19-20.pdf15 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Building A Wing D_pdf-106.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Building A Wing E_pdf-591.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Building B Wing A_pdf-716.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Building B Wing B_pdf-37.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 1_pdf-633.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 2_pdf-733.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 3_pdf-693.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 4_pdf-277.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 5_pdf-812.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 6_pdf-787.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 7_pdf-695.pdf23 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 8_pdf-192.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Building A Wing D_pdf-108.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Building A Wing E_pdf-693.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH1_pdf-508.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 2_pdf-756.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 3_pdf-774.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 4_pdf-660.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 5_pdf-138.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 6_pdf-616.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 7_pdf-347.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 8_pdf-85.pdf23 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: For 2 A Engg.pdf10 Mar 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 a.pdf10 Mar 2020
Certificates of CA (Form 3)File: Form no 3 March 2019.pdf9 Dec 2019
Certificates of CA (Form 5)File: Annual Report 1st Page 2019.pdf11 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Annual Report 1st Page 2019.pdf11 Nov 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate.PDF11 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate Building A Wing E.pdf4 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate Building B Wing A.pdf4 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate Building B Wing B.pdf4 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 1.pdf4 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 2.pdf4 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 3.pdf4 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 4.pdf4 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 5.pdf4 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 6.pdf4 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 7.pdf4 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 8.pdf4 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Building A Wing D.pdf4 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Building A Wing E.pdf4 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 1.pdf4 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 2.pdf4 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 3.pdf4 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 4.pdf4 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 5.pdf4 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 6.pdf4 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 7.pdf4 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 8.pdf4 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Artch Certificate Building A Wing D.pdf4 Sep 2019
Certificates of CA (Form 3)File: CA_certificate.pdf7 Mar 2019
Certificates of Architect (Form 4)File: Building A Wing A.pdf26 Feb 2019
Certificates of Architect (Form 4)File: Building A Wing B.pdf26 Feb 2019
Certificates of Architect (Form 4)File: Building A Wing C.pdf26 Feb 2019
Certificates of Architect (Form 4)File: RH 09.pdf26 Feb 2019
Certificates of Architect (Form 4)File: RH 10.pdf26 Feb 2019

How this compares with Satara

16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep Swapnapurti Sankul on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khandala1,100+ in Satara

2 kmSwapnapurti SankulLapsed / revoked 5Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: Girijatmaj Developers

Girijatmaj Developers has 1 registration on MahaRERA, including Swapnapurti Sankul. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if Swapnapurti Sankul is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swapnapurti Sankul?

The registered promoter entity is Girijatmaj Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swapnapurti Sankul?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Swapnapurti Sankul?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swapnapurti Sankul?

The professionals named in the filing: Architect: Rajendra Shivaling Jangam; Engineer: Ramdas Ravasaheb Jagtap. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swapnapurti Sankul?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swapnapurti Sankul. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swapnapurti Sankul to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.