Home / Browse projects / Satara, Maharashtra / Swapnapurti Sankul
Swapnapurti Sankul
RG-MH-11169 · RERA P52700002291 · Last updated on MahaRERA portal: 28 Dec 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Swapnapurti Sankul is a Residential / Group Housing project by Girijatmaj Developers in Satara, Maharashtra, registered with MahaRERA as P52700002291 on 31 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2024.
At a glance
Project
- NameSwapnapurti Sankul
- TypeResidential / Group Housing
- Location
- Khandala
- Satara
- 412802
- Pincode412802
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52700002291
- ReraGenie IDRG-MH-11169
Builder
- NameGirijatmaj Developers
- Entity typePartnership
- PartnersMahendra krushnarao Ghadge, Sandip Dasharath Kadam
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on31 Jul 2017
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings23 building records
- Documents filed143 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A Wing A | NA | 5 | 0 | 0 | 0 | 0 |
| Building A Wing B | NA | 5 | 0 | 0 | 0 | 0 |
| BUILDING A WING C | NA | 5 | 0 | 0 | 0 | 0 |
| BUILDING A WING D | NA | 5 | 0 | 0 | 0 | 0 |
| BUILDING A WING E | NA | 5 | 0 | 0 | 0 | 0 |
| BUILDING B WING A | NA | 6 | 0 | 0 | 0 | 0 |
| BUILDING B WING B | NA | 6 | 0 | 0 | 0 | 0 |
| ROWHOUSE 1 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 2 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 3 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 4 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 5 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 6 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 7 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 8 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 9 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 10 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 11 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 12 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 13 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 14 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 15 | NA | 3 | 0 | 0 | 0 | 0 |
| ROWHOUSE 16 | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 28 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 23 buildings; the table lists the first 20.
217 of 253 construction stages are filed complete across 23 buildings. The stage furthest along is Staircases, at 75%.
Building A Wing A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building A Wing B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING A WING C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING A WING D59%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING A WING E91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING B WING A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING B WING B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 591%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 691%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 791%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 891%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 982%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 1082%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 1182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 1282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ROWHOUSE 1382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 30% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | No | Not applicable |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING B WING A | 1 | 0 | 1 |
| BUILDING B WING B | 1 | 0 | 1 |
| ROWHOUSE 1 | 0 | 1 | 1 |
| ROWHOUSE 2 | 0 | 1 | 1 |
| ROWHOUSE 3 | 0 | 1 | 1 |
| ROWHOUSE 4 | 0 | 1 | 1 |
| ROWHOUSE 5 | 0 | 1 | 1 |
| ROWHOUSE 6 | 0 | 1 | 1 |
| ROWHOUSE 7 | 0 | 1 | 1 |
| ROWHOUSE 8 | 0 | 1 | 1 |
| ROWHOUSE 9 | 0 | 1 | 1 |
| ROWHOUSE 10 | 0 | 1 | 1 |
| ROWHOUSE 11 | 0 | 1 | 1 |
| ROWHOUSE 12 | 0 | 1 | 1 |
| ROWHOUSE 13 | 0 | 1 | 1 |
| ROWHOUSE 14 | 0 | 1 | 1 |
| ROWHOUSE 15 | 0 | 1 | 1 |
| ROWHOUSE 16 | 0 | 1 | 1 |
Land and ownership11
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Girijatmaj Developers | Khandala | Satara |
| Hanumant Gadhave | Khandala | Satara |
| Vishnu Dinkar gadhave | Khandala | Satara |
| Girijatmajdevelopers | Khandala | Satara |
| Shailaja Narayan Bhosale | Khandala | Satara |
| Mangal Dnyanshwar Bhosale | Shirwal | Satara |
| Ashiwini Bhagwan Gadhave | Khandala | Satara |
| Badam Uttam Gadhave | Khandala | Satara |
| Dattatrya Dinkar Gadhave | Khandala | Satara |
| Laxmi Bhagwan Gadhave | Khandala | Satara |
| Asmita Bhagwan Gadhave | Khandala | Satara |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rajendra Shivaling Jangam |
| Engineer | Ramdas Ravasaheb Jagtap |
| Partner | Role in project |
|---|---|
| Girijatmaj Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Dec 2024
Documents filed143
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: FORM 3.pdf | 28 Dec 2024 |
| Certificates of CA (Form 5)File: FORM 5.pdf | 28 Dec 2024 |
| OtherFile: form 4.pdf | 28 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion certificate.pdf | 28 Dec 2024 |
| Declaration about Commencement CertificateFile: Complition Certificate.PDF | 21 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance 2022-2023.pdf | 21 Mar 2024 |
| Certificates of CA (Form 3)File: Form No 5.pdf | 21 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No 5 2022 2023.pdf | 21 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate Building B Wing B .pdf | 6 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Building B Wing A.pdf | 6 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Building B Wing A.pdf | 6 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Building B Wing B.pdf | 6 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 1.pdf | 6 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate 1.pdf | 6 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Girjatmaj_develpors_form_-5_-_21-22.pdf | 6 May 2023 |
| Certificates of CA (Form 3)File: certificate_of_fianancial_progress_-_20-21.pdf | 14 Mar 2023 |
| Certificates of CA (Form 3)File: Girjatmmaj_developers_form-3_-_21-22.pdf | 14 Mar 2023 |
| Certificates of CA (Form 5)File: Girjatmaj_develpors_form_-5_-_21-22.pdf | 14 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual_report_form-5_-_20-21.pdf | 14 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Girjatmaj_develpors_form_-5_-_21-22.pdf | 14 Mar 2023 |
| OtherFile: Row House Complition Certificate.pdf | 14 Mar 2023 |
| Certificates of CA (Form 3)File: CA Certificate 2021.pdf | 16 Mar 2022 |
| Certificates of CA (Form 5)File: CA Form No 5 19-20.pdf | 15 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Form No 5 19-20.pdf | 15 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Building A Wing D_pdf-106.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Building A Wing E_pdf-591.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Building B Wing A_pdf-716.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Building B Wing B_pdf-37.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 1_pdf-633.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 2_pdf-733.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 3_pdf-693.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 4_pdf-277.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 5_pdf-812.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 6_pdf-787.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 7_pdf-695.pdf | 23 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch RH 8_pdf-192.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Building A Wing D_pdf-108.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Building A Wing E_pdf-693.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH1_pdf-508.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 2_pdf-756.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 3_pdf-774.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 4_pdf-660.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 5_pdf-138.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 6_pdf-616.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 7_pdf-347.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg RH 8_pdf-85.pdf | 23 Nov 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: For 2 A Engg.pdf | 10 Mar 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 a.pdf | 10 Mar 2020 |
| Certificates of CA (Form 3)File: Form no 3 March 2019.pdf | 9 Dec 2019 |
| Certificates of CA (Form 5)File: Annual Report 1st Page 2019.pdf | 11 Nov 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Annual Report 1st Page 2019.pdf | 11 Nov 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate.PDF | 11 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate Building A Wing E.pdf | 4 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate Building B Wing A.pdf | 4 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate Building B Wing B.pdf | 4 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 1.pdf | 4 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 2.pdf | 4 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 3.pdf | 4 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 4.pdf | 4 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 5.pdf | 4 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 6.pdf | 4 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 7.pdf | 4 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Artch Certificate RH 8.pdf | 4 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Building A Wing D.pdf | 4 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Building A Wing E.pdf | 4 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 1.pdf | 4 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 2.pdf | 4 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 3.pdf | 4 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 4.pdf | 4 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 5.pdf | 4 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 6.pdf | 4 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 7.pdf | 4 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate RH 8.pdf | 4 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Artch Certificate Building A Wing D.pdf | 4 Sep 2019 |
| Certificates of CA (Form 3)File: CA_certificate.pdf | 7 Mar 2019 |
| Certificates of Architect (Form 4)File: Building A Wing A.pdf | 26 Feb 2019 |
| Certificates of Architect (Form 4)File: Building A Wing B.pdf | 26 Feb 2019 |
| Certificates of Architect (Form 4)File: Building A Wing C.pdf | 26 Feb 2019 |
| Certificates of Architect (Form 4)File: RH 09.pdf | 26 Feb 2019 |
| Certificates of Architect (Form 4)File: RH 10.pdf | 26 Feb 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 143 filed documents as one ZIP, foldered, with a manifest
Keep Swapnapurti Sankul on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Khandala1,100+ in Satara
Filed coordinates, straight-line distance. 10 registered projects within 2 km.
GOLDFIELDS
UNIVERSAL DEVELOPERS
Snehbhoomi
Pushkar Realty
HILL CREST PARK
LIMRA DEVELOPERS
Terra Nova
BHIMASHANKAR DEVELOPERS
Woodwinds Phase I
Alliance Vanashree Ventures
Vaarsahighland1
BHIMASHANKAR DEVELOPERS
See every Satara project, with the district possession charts
Builder: Girijatmaj Developers
Girijatmaj Developers has 1 registration on MahaRERA, including Swapnapurti Sankul. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if Swapnapurti Sankul is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Swapnapurti Sankul?
The registered promoter entity is Girijatmaj Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Swapnapurti Sankul?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Swapnapurti Sankul?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Swapnapurti Sankul?
The professionals named in the filing: Architect: Rajendra Shivaling Jangam; Engineer: Ramdas Ravasaheb Jagtap. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Swapnapurti Sankul?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback