ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / Swapna Shrushti

De-registered No litigation declared Others project

Swapna Shrushti

By AUM PROPERTIES

RG-MH-06512 · RERA P52800053479 · Last updated on MahaRERA portal: 10 May 2025

Source: official MahaRERA filing

Red flags

  • De-registered

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedno revision filed
1 of 55Construction stages doneacross 5 buildings; furthest along: Excavation, 50%
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

Swapna Shrushti is a Others project by AUM PROPERTIES in Ratnagiri, Maharashtra, registered with MahaRERA as P52800053479 on 6 Nov 2023. Possession is promised by 31 Aug 2027.

At a glance

Project

  • NameSwapna Shrushti
  • TypeOthers
  • Location
    • Near Palkar Hospital
    • Zadgaon
    • Zadgaon CT
    • Ratnagiri
    • 415639
  • Pincode415639
  • RERA no.P52800053479
  • ReraGenie IDRG-MH-06512

Builder

  • NameAUM PROPERTIES
  • Entity typePartnership
  • PartnersAJIT ZUMBARLAL KARNAWAT, KETAN JAYANTILAL VEERA, MAHENDRA ANANTRAO SALVI, NILESH ISHWAR LADDAD, PRASHANT NARAYAN DESPANDE, SHARAD NARAYAN MOGALE

Key dates

this monthRegisteredNov 2023PromisedAug 2027

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on6 Nov 2023
  • Promised completion31 Aug 2027
  • Revised completionNone
  • Buildings5 building records
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA70000
BNA70000
CNA70000
DNA70000
ENA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 10 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 50%.

A9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B5%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C5%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered5
Open Space7
BuildingClosed/CoveredOpen SpaceTotal
A112
B145
C123
D101
E101

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,022 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5917.63
Proposed, not sanctioned4,739 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEAR JOSHI HOSPITAL,SINHAGAD ROAD,PUNE 411051

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArckitude Studio
EngineerNiraj Sanklecha
Chartered AccountantPriyanka Chordiya & Associates
Chartered AccountantSAC & CO LLP
PartnerRole in project
AUM PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2027

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032025 Swapna Shrushti.pdf10 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer AS ON 31032025.pdf10 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form-5 FY 2024-25 (1).pdf10 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032025 Swapna Shrushti.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer AS ON 31032025.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold 31032025.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_signed.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Swapna Shrushti 31122024 sign copy_compress.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer AS ON 31122024_signed.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold 31122024_signed.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Swapna Shrushti Form 2A Fy 23-24_signed.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Swapna Shrushti 31032024_compress.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30092024.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Swapna Shrushti 30092024_compressed.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer AS ON 30092024.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold 30092024.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer AS ON 30062024.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Aum propeties 30-06-2024_compressed.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form I 170524.pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 engineer AS ON 31032024.pdf18 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold 31032024.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30042024 Swapna Shrushti both sign compress.pdf18 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate001.pdf22 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate001 31122023.pdf22 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold001.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Swapna Shrushti 31122023 both sign_compressed.pdf22 Jan 2024
Other - TechnicalFile: aum properties mail from solapur townplanning authority.pdf25 Oct 2023
Declaration in FORM BFile: AUM properties Form B Notarized_compressed.pdf30 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31072023 final.pdf30 Aug 2023
Copy of the legal title reportFile: LEGAL TITLE REPORT FINAL.pdf28 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 7 disclosure of interest merged_compressed_compressed.pdf28 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate FINAL.pdf23 Aug 2023
Layout approvalFile: SANCTION PLAN- PARTVANE-1_compressed.pdf22 Aug 2023
Building plan approvalFile: SANCTION PLAN- PARTVANE-2_compressed.pdf22 Aug 2023
Building plan approvalFile: SANCTION PLAN- PARTVANE-3-5_compressed.pdf22 Aug 2023
PAN CardFile: Aum properties pan.pdf22 Aug 2023
Details of encumbrances concerned to FinanceFile: Encumbrance merged.pdf22 Aug 2023
Details of encumbrances concerned to LegalFile: Encumbrance merged.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: SANCTION PLAN- PARTVANE-1_compressed.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN- PARTVANE-2_compressed.pdf22 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN- PARTVANE-3-5_compressed.pdf22 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate_compressed.pdf22 Aug 2023
Declaration about Commencement CertificateFile: Format D Commencement certificate declaration final.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Aum Properties_31072023_final.pdf22 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory_final.pdf22 Aug 2023
CERSAI detailsFile: No cersai letter final.pdf22 Aug 2023
Proforma of Agreement for saleFile: MODEL FORM OF AGREEMNT NEW.pdf22 Aug 2023
Proforma of Allotment letterFile: Draft Allotment Letter_ final.pdf22 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A seperate Bank Account final.pdf22 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter final.pdf22 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement final.pdf22 Aug 2023

How this compares with Ratnagiri

15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Swapna Shrushti on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Zadgaon1,100+ in Ratnagiri

Builder: AUM PROPERTIES

AUM PROPERTIES has 1 registration on MahaRERA, including Swapna Shrushti. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What does it mean that Swapna Shrushti shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Swapna Shrushti is delayed beyond 31 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swapna Shrushti?

The registered promoter entity is AUM PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swapna Shrushti?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Swapna Shrushti?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swapna Shrushti?

The professionals named in the filing: Architect: Arckitude Studio; Engineer: Niraj Sanklecha; Chartered Accountant: Priyanka Chordiya & Associates; Chartered Accountant: SAC & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swapna Shrushti?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swapna Shrushti. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swapna Shrushti to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.