Home / Browse projects / Ratnagiri, Maharashtra / ARIHANT THE PARK PHASE - I

Registered No litigation declared Residential / Group Housing project

ARIHANT THE PARK PHASE - I

By RATNAGIRI DREAM HOMES PVT. LTD.

RG-MH-30449 · RERA P52800030601 · Last updated on MahaRERA portal: 27 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
13 of 66Construction stages doneacross 6 buildings; furthest along: Slabs of Super Structure, 90%
122 of 309Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

ARIHANT THE PARK PHASE - I is a Residential / Group Housing project by RATNAGIRI DREAM HOMES PVT. LTD. in Ratnagiri, Maharashtra, registered with MahaRERA as P52800030601 on 1 Sep 2021. Possession is promised by 31 Dec 2027. 187 of the 309 units on this registration are recorded sold or booked, and 13 of 66 construction stages are filed complete.

At a glance

Project

  • NameARIHANT THE PARK PHASE - I
  • TypeResidential / Group Housing
  • Location
    • -
    • NEAR MIDC
    • Tiwandewadi
    • Ratnagiri
    • 415639
  • Pincode415639
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800030601
  • ReraGenie IDRG-MH-30449

Builder

  • NameRATNAGIRI DREAM HOMES PVT. LTD.
  • Entity typeCompany
  • DirectorsMANOJ SURESH GUNDECHA, MAHESH SURESH GUNDECHA, INDIRA SURESH GUNDECHA, MEENA MUKESH GUNDECHA

Key dates

this monthRegisteredSep 2021PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2021
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings6 building records
  • Documents filed71 files

Current status

61%187 of 309 units booked
70.2%Work done, per cost certificate

Figures as on 27 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
R-III BUNGALOWNA2237037
R-I BUNGALOWNA2242042
R-II BUNGALOWNA2247047
R-IV BUNGALOWNA22202
TYPE A BUILDINGNA551800180
AMENITY BUILDINGNA33101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

R-III BUNGALOW0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R-I BUNGALOW54%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor78%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises73%
Sanitary Fittings within the flats / premises38%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks44%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R-II BUNGALOW57%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor84%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises78%
Sanitary Fittings within the flats / premises46%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks57%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.68%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
R-IV BUNGALOW73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE A BUILDING47%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth75%
Stilt Floor60%
Slabs of Super Structure73%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AMENITY BUILDING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes45%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes45%
Storm Water DrainsYes25%
Landscaping & Tree PlantingYes45%
Street LightingYes25%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Open Space90
BuildingOpen SpaceTotal
R-I BUNGALOW4040
R-II BUNGALOW4848
R-IV BUNGALOW22

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area38,400 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityRatnagiri Municipal Corporation
Permissible FSI32832.0
Proposed, not sanctioned22,325 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDYS PLAZA RATNAGIRI KOLHAPUR ROAD MARUTI MANDIR RATNAGIRI
Estimated costRs 54.30 cr
Cost incurredRs 38.14 cr
Work done70.25%
BuildingWingEstimatedIncurred
TYPE A BUILDINGNARs 18.51 crRs 14.81 cr
R-I BUNGALOWNARs 11.52 crRs 11.17 cr
R-II BUNGALOWNARs 11.04 crRs 9.93 cr
R-III BUNGALOWNARs 6.87 cr-
AMENITY BUILDINGNARs 2.96 cr-
-NARs 2.94 crRs 1.76 cr
R-IV BUNGALOWNARs 46.56 lakhRs 46.56 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectABHINAY JOGI
EngineerMANOJ JOSHI
Chartered AccountantKEDAR KARAMBELKAR
Chartered AccountantDhanashree Karmarkar
Chartered AccountantAditi Ganu
PartnerRole in project
RATNAGIRI DREAM HOMES PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf27 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf27 Jun 2026
Withdrawal Update Form 3File: FORM-3 Jan-March 24 Scan Copy_compressed.pdf27 Jun 2026
Form 1File: Signed Form 1 Arihant Park - Dec 25_.pdf3 Feb 2026
Form 2File: Signed Form -2 A Park Dec 25.pdf3 Feb 2026
Form 3File: Signed Form 3-Arihant Park PH I-Dec 25.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Arihant Park Sold Inventory as on Dec 25.pdf3 Feb 2026
Form 5 (FY 2024-2025)File: Signed Scanned copy Form 5-A Park Phase I-FY 24-25.pdf27 Jan 2026
Form 1File: Form 1-Arihant Park Phase I-Sep 25.pdf8 Jan 2026
Form 2File: Signed Form 2-A Park Sep 25.pdf8 Jan 2026
Form 3File: Signed Form 3-Arihant Park PH I-Sep 25.pdf8 Jan 2026
Disclosure of Sold and Booked InventoryFile: Arihant Park Sold Inventory as on Sep 25.pdf8 Jan 2026
Form 1File: Form 1-Arihant Park-Jun'25.pdf4 Sep 2025
Form 2File: Form 2-Arihant Park-Jun'25.pdf4 Sep 2025
Form 3File: Form 3-Arihant Park PH I-Jun'25.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Jun-25.pdf4 Sep 2025
Form 1File: Form1 -Mar'25.pdf23 Jun 2025
Form 2File: Form 2-Arihant Park-Mar'25.pdf23 Jun 2025
Form 3File: Form 3_Arihant Park_Mar'25.pdf23 Jun 2025
Disclosure of Sold and Booked InventoryFile: Arihant Park_Sold Inventory_Mar'25.pdf23 Jun 2025
Form 1File: Form 1 - Jun' 24.pdf2 Jun 2025
Form 2File: Form-2 Jun' 24.pdf2 Jun 2025
Form 3File: Signed Form 3 - June 2024.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: rdhpl jun-24_0001.pdf2 Jun 2025
Form 1File: Form 1 - Sept' 24.pdf2 Jun 2025
Form 2File: Form -2 Sept' 24.pdf2 Jun 2025
Form 3File: Signed Form 3 Sept-24.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: rdhpl sep-24_0001.pdf2 Jun 2025
Form 1File: Form 1 - Dec' 24.pdf2 Jun 2025
Form 2File: Form 2-Dec'24.pdf2 Jun 2025
Form 3File: Form 3_Dec'24.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: rdhpl dec24_0001.pdf2 Jun 2025
Form 5 (FY 2023-2024)File: Form-5 FY 2023-24 (Signed).pdf31 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec' 24.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 -Mar'25.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 as on Dec 2024 Signed.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jun' 24.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sept' 24.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 - June 2024.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Sept-24.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Jun' 24.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Sept' 24.pdf25 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 FY 2023-24 (Signed).pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 Jan-March 24 Scan Copy_compressed.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 DEC' 2023.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 DEC' 2023_compressed.pdf15 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 FY 2021-22.pdf15 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 FY 2022-23.pdf15 Mar 2024
Disclosure of sold/ booked inventoryFile: Park Sold Unsold 1_compressed.pdf6 Mar 2024
Layout approvalFile: 4 COPY OF LAYOUT APPROVAL.pdf18 Aug 2021
Building plan approvalFile: 5 1 BUILD PLAN APPROVAL.pdf18 Aug 2021
Building plan approvalFile: 5 2 BUILD PLAN APPROVAL.pdf18 Aug 2021
Building plan approvalFile: 5 3 BUILD PLAN APPROVAL.pdf18 Aug 2021
Building plan approvalFile: 5 4 BUILD PLAN APPROVAL.pdf18 Aug 2021
PAN CardFile: 1 PAN CARD.pdf18 Aug 2021
Copy of the legal title reportFile: 2 COPY OF THE LEGAL TITLE REPORT.pdf18 Aug 2021
Details of encumbrancesFile: 3 DETAILS OF ENCUMBRANCES.pdf18 Aug 2021
Copy of Layout Approval (in case of layout)File: 4 COPY OF LAYOUT APPROVAL.pdf18 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 5 1 BUILD PLAN APPROVAL.pdf18 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 5 2 BUILD PLAN APPROVAL.pdf18 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 5 3 BUILD PLAN APPROVAL.pdf18 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 5 4 BUILD PLAN APPROVAL.pdf18 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: 6 COMMENCEMENT CERTIFICATE.pdf18 Aug 2021
Declaration about Commencement CertificateFile: 7 DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf18 Aug 2021
Declaration in FORM BFile: 8 DECLARATION FORM B.pdf18 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 CERTIFICATE OF ARCHITECT.pdf18 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 CERTIFICATE OF ENGINEER.pdf18 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 CERTIFICATE OF CA.pdf18 Aug 2021
Proforma of Allotment letterFile: 19 1 ALLOTMENT LETTER.pdf18 Aug 2021
Proforma of Allotment letterFile: 19 2 AGG TO SALE 1.pdf18 Aug 2021
Proforma of Allotment letterFile: 19 3 AGG TO SALE 2.pdf18 Aug 2021

How this compares with Ratnagiri

61%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep ARIHANT THE PARK PHASE - I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR MIDC1,100+ in Ratnagiri

2 kmARIHANT THE PARK PHASE -Completed 54Lapsed / revoked 12Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 104 registered projects within 2 km.

Builder: RATNAGIRI DREAM HOMES PVT. LTD.

RATNAGIRI DREAM HOMES PVT. LTD. has 1 registration on MahaRERA, including ARIHANT THE PARK PHASE - I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if ARIHANT THE PARK PHASE - I is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT THE PARK PHASE - I?

The registered promoter entity is RATNAGIRI DREAM HOMES PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT THE PARK PHASE - I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARIHANT THE PARK PHASE - I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT THE PARK PHASE - I?

The professionals named in the filing: Architect: ABHINAY JOGI; Engineer: MANOJ JOSHI; Chartered Accountant: KEDAR KARAMBELKAR; Chartered Accountant: Dhanashree Karmarkar; Chartered Accountant: Aditi Ganu. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT THE PARK PHASE - I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT THE PARK PHASE - I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT THE PARK PHASE - I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.