Home / Browse projects / Thane, Maharashtra / SWANAND VEDIKA

Registered No litigation declared Residential / Group Housing project

SWANAND VEDIKA

By ATHARV INFRASTRUCTURES

RG-MH-17716 · RERA P51700077350 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
10 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 98%
298 of 305Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

SWANAND VEDIKA is a Residential / Group Housing project by ATHARV INFRASTRUCTURES in Thane, Maharashtra, registered with MahaRERA as P51700077350 on 9 Aug 2024. Possession is promised by 30 Jun 2029. 7 of the 305 units on this registration are recorded sold or booked, and 10 of 55 construction stages are filed complete.

At a glance

Project

  • NameSWANAND VEDIKA
  • TypeResidential / Group Housing
  • Location
    • SURVEY NO 206 HISSA NO 5 PLOT NO 2 AT VILLEGE BADLAPUR WEST
    • BADLAPUR WEST
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700077350
  • ReraGenie IDRG-MH-17716

Builder

  • NameATHARV INFRASTRUCTURES
  • Entity typePartnership
  • PartnersANITA PRIYESH CHOUDHARY, UJWALA JAYANT PATIL, VAIBHAV ASHOK GUNJAL, SWANAND INFRATECH LLP

Key dates

this monthRegisteredAug 2024PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2024
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings5 building records
  • Documents filed69 files

Current status

2%7 of 305 units booked
22.1%Work done, per cost certificate

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA8856864
BUILDING NO 2NA8042951
BUILDING NO 3NA8056965
BUILDING NO 4NA8056965
BUILDING NO 5NA7060060

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 98%.

BUILDING NO 181%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 49%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 529%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered5
Open Space41
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 1189
BUILDING NO 2189
BUILDING NO 3189
BUILDING NO 41910
BUILDING NO 5189

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,100 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jun 2025
LandownerVillageDistrict
SUBHASH BHAGAJI GHORPADEBadlapur (M Cl)Thane
ROHAN JANARDHAN PATILBadlapur (M Cl)Thane
PRATHAMESH ANANTH PATILBadlapur (M Cl)Thane
HARSHAL SUBHASH GHORPADEBadlapur (M Cl)Thane
RAKESH B PATILBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR MUNICIPAL CORPORATION
Permissible FSI13087.3
Proposed, not sanctioned13,087 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDCB BANK LIMITED , SHOP NO. 3,4,5 AND 6 ON GND FLR AND OFFICE 4 AND 5 ON 1ST FLR , PATEL ESTATE , NEAR GANDHI CHOWK , BAZAR PETH ROAD , KALYAN - 421301 , MAHARASHTRA.
Estimated costRs 42.00 cr
Cost incurredRs 9.29 cr
Work done22.11%
BuildingWingEstimatedIncurred
BUILDING NO 5NARs 8.46 crRs 1.27 cr
BUILDING NO 1NARs 8.18 crRs 8.02 cr
BUILDING NO 3NARs 7.94 cr-
BUILDING NO 4NARs 7.92 cr-
BUILDING NO 2NARs 6.00 cr-
-NARs 3.50 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL SHRIKHANDE
EngineerS V PATEL & ASSOCIATES
Chartered AccountantBMKD ASSOCIATES
Chartered AccountantWATWANI AND ASSOCIATES
Chartered AccountantVRP & Associates
PartnerRole in project
ATHARV INFRASTRUCTURES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf15 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf15 Apr 2026
Withdrawal Update Form 3File: Final form 3 sign.pdf15 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf4 Feb 2026
Withdrawal Update Form 3File: Final Form 3 dec 25.pdf4 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf29 Jan 2026
Withdrawal Update Form 3File: Final Form 3 dec 25.pdf29 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf5 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf5 Nov 2025
Withdrawal Update Form 3File: FORM 3 SEP-25.pdf5 Nov 2025
Form 5 (FY 2024-2025)File: Signed Form 5 Atharv Infra.pdf3 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 after sign.pdf7 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Atharva infrastructure , form 3 , Q3 (2)_compressed.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 eng certificate.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE 1-10-24.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_.pdf12 Dec 2024
Copy of the legal title reportFile: Legal title Report A.pdf6 Jul 2024
Proforma of Agreement for saleFile: AFS.pdf6 Jul 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING .pdf25 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf8 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Priyesh_merged (1).pdf8 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Plinth Letter.pdf7 May 2024
Deviation Report with respect to Allotment letterFile: DEVIATIONALLOTMENT.pdf20 Apr 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATIONAFS.pdf20 Apr 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER ON PLAIN PAPER.pdf27 Mar 2024
Other - LegalFile: DEVELOPMENT AGREEMENT OF ATHRV INFRASTURECTURES_compressed.pdf27 Mar 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBARANCE FINANCE1.pdf5 Mar 2024
Details of encumbrances concerned to FinanceFile: NO ENCOMBERANCE LEGAL1.pdf5 Mar 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBARANCE FINANCE1.pdf5 Mar 2024
Details of encumbrances concerned to LegalFile: NO ENCOMBERANCE LEGAL1.pdf5 Mar 2024
Declaration in FORM BFile: form B priyesh chaoudhari (1).pdf5 Mar 2024
CERSAI detailsFile: UNDER TAKING ABOUT NO SECURITY INTREST ON PROJECT.pdf5 Mar 2024
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY-1.pdf5 Mar 2024
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY-2.pdf5 Mar 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY- 3.pdf5 Mar 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - 4.pdf5 Mar 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - 5.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE1_compressed.pdf5 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACCOUNT DECLARATION.pdf5 Mar 2024
Other - LegalFile: DEVELOPMENT AGREEMENT OF ATHRV INFRASTURECTURES_compressed.pdf18 Feb 2024
Building plan approvalFile: MAP1_compressed1.pdf15 Feb 2024
Building plan approvalFile: MAP2_compressed.pdf15 Feb 2024
Building plan approvalFile: MAP3_compressed.pdf15 Feb 2024
Building plan approvalFile: MAP4_compressed (1).pdf15 Feb 2024
Building plan approvalFile: MAP5.pdf15 Feb 2024
Layout approvalFile: MAP1_compressed1.pdf15 Feb 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBARANCE CERTIFICATE ATHARV INFRA.pdf15 Feb 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBARANCE CERTIFICATE ATHARV INFRA.pdf15 Feb 2024
Copy of Layout Approval (in case of layout)File: MAP1_compressed1.pdf15 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: MAP1_compressed1.pdf15 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: MAP2_compressed.pdf15 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: MAP3_compressed.pdf15 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: MAP4_compressed (1).pdf15 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: MAP5.pdf15 Feb 2024
Other - LegalFile: PARTNERSHIP DEED NOTARY.pdf15 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: MAP3_compressed.pdf14 Feb 2024
PAN CardFile: PAN CARD ARTHAV INFRASTRUCTURES.pdf13 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf13 Feb 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCMENT CERTIFICATE ATHARV INFRA.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 engineer scertificate.pdf13 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report swanand vedika.pdf13 Feb 2024

How this compares with Thane

2%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SWANAND VEDIKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BADLAPUR WEST7,600+ in Thane

2 kmSWANAND VEDIKACompleted 30Lapsed / revoked 13Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: ATHARV INFRASTRUCTURES

ATHARV INFRASTRUCTURES has 1 registration on MahaRERA, including SWANAND VEDIKA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SWANAND VEDIKA is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWANAND VEDIKA?

The registered promoter entity is ATHARV INFRASTRUCTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWANAND VEDIKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SWANAND VEDIKA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWANAND VEDIKA?

The professionals named in the filing: Architect: RAHUL SHRIKHANDE; Engineer: S V PATEL & ASSOCIATES; Chartered Accountant: BMKD ASSOCIATES; Chartered Accountant: WATWANI AND ASSOCIATES; Chartered Accountant: VRP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWANAND VEDIKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWANAND VEDIKA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWANAND VEDIKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.