Home / Browse projects / Thane, Maharashtra / SWANAND VEDIKA
SWANAND VEDIKA
RG-MH-17716 · RERA P51700077350 · Last updated on MahaRERA portal: 15 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SWANAND VEDIKA is a Residential / Group Housing project by ATHARV INFRASTRUCTURES in Thane, Maharashtra, registered with MahaRERA as P51700077350 on 9 Aug 2024. Possession is promised by 30 Jun 2029. 7 of the 305 units on this registration are recorded sold or booked, and 10 of 55 construction stages are filed complete.
At a glance
Project
- NameSWANAND VEDIKA
- TypeResidential / Group Housing
- Location
- SURVEY NO 206 HISSA NO 5 PLOT NO 2 AT VILLEGE BADLAPUR WEST
- BADLAPUR WEST
- Badlapur (M Cl)
- Ambarnath
- Thane
- 421503
- Pincode421503
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700077350
- ReraGenie IDRG-MH-17716
Builder
- NameATHARV INFRASTRUCTURES
- Entity typePartnership
- PartnersANITA PRIYESH CHOUDHARY, UJWALA JAYANT PATIL, VAIBHAV ASHOK GUNJAL, SWANAND INFRATECH LLP
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Aug 2024
- Promised completion30 Jun 2029
- Revised completionNone
- Buildings5 building records
- Documents filed69 files
Current status
Figures as on 15 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 1 | NA | 8 | 8 | 56 | 8 | 64 |
| BUILDING NO 2 | NA | 8 | 0 | 42 | 9 | 51 |
| BUILDING NO 3 | NA | 8 | 0 | 56 | 9 | 65 |
| BUILDING NO 4 | NA | 8 | 0 | 56 | 9 | 65 |
| BUILDING NO 5 | NA | 7 | 0 | 60 | 0 | 60 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 98%.
BUILDING NO 181%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 98% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 29%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 49%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 529%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed46
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING NO 1 | 1 | 8 | 9 |
| BUILDING NO 2 | 1 | 8 | 9 |
| BUILDING NO 3 | 1 | 8 | 9 |
| BUILDING NO 4 | 1 | 9 | 10 |
| BUILDING NO 5 | 1 | 8 | 9 |
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SUBHASH BHAGAJI GHORPADE | Badlapur (M Cl) | Thane |
| ROHAN JANARDHAN PATIL | Badlapur (M Cl) | Thane |
| PRATHAMESH ANANTH PATIL | Badlapur (M Cl) | Thane |
| HARSHAL SUBHASH GHORPADE | Badlapur (M Cl) | Thane |
| RAKESH B PATIL | Badlapur (M Cl) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO 5 | NA | Rs 8.46 cr | Rs 1.27 cr |
| BUILDING NO 1 | NA | Rs 8.18 cr | Rs 8.02 cr |
| BUILDING NO 3 | NA | Rs 7.94 cr | - |
| BUILDING NO 4 | NA | Rs 7.92 cr | - |
| BUILDING NO 2 | NA | Rs 6.00 cr | - |
| - | NA | Rs 3.50 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAHUL SHRIKHANDE |
| Engineer | S V PATEL & ASSOCIATES |
| Chartered Accountant | BMKD ASSOCIATES |
| Chartered Accountant | WATWANI AND ASSOCIATES |
| Chartered Accountant | VRP & Associates |
| Partner | Role in project |
|---|---|
| ATHARV INFRASTRUCTURES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jul 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2029
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Final form 3 sign.pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: Final Form 3 dec 25.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 29 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 29 Jan 2026 |
| Withdrawal Update Form 3File: Final Form 3 dec 25.pdf | 29 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 5 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 5 Nov 2025 |
| Withdrawal Update Form 3File: FORM 3 SEP-25.pdf | 5 Nov 2025 |
| Form 5 (FY 2024-2025)File: Signed Form 5 Atharv Infra.pdf | 3 Nov 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 after sign.pdf | 7 May 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf | 7 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Atharva infrastructure , form 3 , Q3 (2)_compressed.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 eng certificate.pdf | 1 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE 1-10-24.pdf | 13 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 13 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_.pdf | 12 Dec 2024 |
| Copy of the legal title reportFile: Legal title Report A.pdf | 6 Jul 2024 |
| Proforma of Agreement for saleFile: AFS.pdf | 6 Jul 2024 |
| Other - TechnicalFile: DECLARATION CUM UNDERTAKING .pdf | 25 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 8 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 8 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Priyesh_merged (1).pdf | 8 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth Letter.pdf | 7 May 2024 |
| Deviation Report with respect to Allotment letterFile: DEVIATIONALLOTMENT.pdf | 20 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATIONAFS.pdf | 20 Apr 2024 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER ON PLAIN PAPER.pdf | 27 Mar 2024 |
| Other - LegalFile: DEVELOPMENT AGREEMENT OF ATHRV INFRASTURECTURES_compressed.pdf | 27 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBARANCE FINANCE1.pdf | 5 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: NO ENCOMBERANCE LEGAL1.pdf | 5 Mar 2024 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBARANCE FINANCE1.pdf | 5 Mar 2024 |
| Details of encumbrances concerned to LegalFile: NO ENCOMBERANCE LEGAL1.pdf | 5 Mar 2024 |
| Declaration in FORM BFile: form B priyesh chaoudhari (1).pdf | 5 Mar 2024 |
| CERSAI detailsFile: UNDER TAKING ABOUT NO SECURITY INTREST ON PROJECT.pdf | 5 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY-1.pdf | 5 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY-2.pdf | 5 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY- 3.pdf | 5 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - 4.pdf | 5 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - 5.pdf | 5 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE1_compressed.pdf | 5 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACCOUNT DECLARATION.pdf | 5 Mar 2024 |
| Other - LegalFile: DEVELOPMENT AGREEMENT OF ATHRV INFRASTURECTURES_compressed.pdf | 18 Feb 2024 |
| Building plan approvalFile: MAP1_compressed1.pdf | 15 Feb 2024 |
| Building plan approvalFile: MAP2_compressed.pdf | 15 Feb 2024 |
| Building plan approvalFile: MAP3_compressed.pdf | 15 Feb 2024 |
| Building plan approvalFile: MAP4_compressed (1).pdf | 15 Feb 2024 |
| Building plan approvalFile: MAP5.pdf | 15 Feb 2024 |
| Layout approvalFile: MAP1_compressed1.pdf | 15 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBARANCE CERTIFICATE ATHARV INFRA.pdf | 15 Feb 2024 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBARANCE CERTIFICATE ATHARV INFRA.pdf | 15 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: MAP1_compressed1.pdf | 15 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: MAP1_compressed1.pdf | 15 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: MAP2_compressed.pdf | 15 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: MAP3_compressed.pdf | 15 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: MAP4_compressed (1).pdf | 15 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: MAP5.pdf | 15 Feb 2024 |
| Other - LegalFile: PARTNERSHIP DEED NOTARY.pdf | 15 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: MAP3_compressed.pdf | 14 Feb 2024 |
| PAN CardFile: PAN CARD ARTHAV INFRASTRUCTURES.pdf | 13 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 13 Feb 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCMENT CERTIFICATE ATHARV INFRA.pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf | 13 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 engineer scertificate.pdf | 13 Feb 2024 |
| CERSAI detailsFile: CERSAI_Search_Report swanand vedika.pdf | 13 Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SWANAND VEDIKA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BADLAPUR WEST7,600+ in Thane
Filed coordinates, straight-line distance. 62 registered projects within 2 km.
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: ATHARV INFRASTRUCTURES
ATHARV INFRASTRUCTURES has 1 registration on MahaRERA, including SWANAND VEDIKA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SWANAND VEDIKA is delayed beyond 30 Jun 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SWANAND VEDIKA?
The registered promoter entity is ATHARV INFRASTRUCTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SWANAND VEDIKA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SWANAND VEDIKA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SWANAND VEDIKA?
The professionals named in the filing: Architect: RAHUL SHRIKHANDE; Engineer: S V PATEL & ASSOCIATES; Chartered Accountant: BMKD ASSOCIATES; Chartered Accountant: WATWANI AND ASSOCIATES; Chartered Accountant: VRP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SWANAND VEDIKA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback