ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SWAMIPUSHPA

Registered No litigation declared Residential / Group Housing project

SWAMIPUSHPA

By NUTAN DEVELOPPERS

RG-MH-27592 · RERA P52100034641 · Last updated on MahaRERA portal: 6 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 21 months
  • 2 extensions taken
  • Rs 20.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 21 months from the original
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
61 of 86Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 159 documents Report an error

SWAMIPUSHPA is a Residential / Group Housing project by NUTAN DEVELOPPERS in Pune, Maharashtra, registered with MahaRERA as P52100034641 on 20 Apr 2022. Possession is promised by 30 Jun 2027. The completion date has moved by 21 months from the original filing. 25 of the 86 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSWAMIPUSHPA
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 32 AND 33 CTS NO 213 LOKMANYANAGAR
    • SADASHIV PETH
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411030
  • Pincode411030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034641
  • ReraGenie IDRG-MH-27592

Builder

  • NameNUTAN DEVELOPPERS
  • Entity typePartnership
  • PartnerNIHAL SHRIKANT UNECHA

Key dates

this monthRegisteredApr 2022First promiseSep 2025Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Apr 2022
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Sep 2025)
  • Buildings1 building record
  • Documents filed159 files

Current status

29%25 of 86 units booked
104.7%Work done, per cost certificate

Figures as on 6 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SWAMIPUSHPANA151485186

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

SWAMIPUSHPA: 96% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes90%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed286

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots286
Closed/Covered286

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,733 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on22 May 2026
LandownerVillageDistrict
PUSHPAKSHRI SAHAKARI GRUHRACHNA SANTHAPune (M Corp.)Pune
SWAMI SAHAKARI GRUHRACHNA SANSTHAPune (M Corp.)Pune

Approvals and building plan

Permissible FSI9593.03
Proposed, not sanctioned9,323 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVITTHALWADI PUNE 411030
Estimated costRs 29.63 cr
Cost incurredRs 31.00 cr
Work done104.65%
BuildingWingEstimatedIncurred
SWAMIPUSHPANARs 28.98 crRs 30.31 cr
-NARs 65.00 lakhRs 69.46 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMILIND YADAV YADAV
EngineerMILIND YADAV YADAV
Chartered AccountantPriyesh Prakash Jain
Chartered AccountantOMKAR U KHUDE & COMPANY
PartnerRole in project
NUTAN DEVELOPPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA19112518375Sep 2025 → Jun 2026

Reason as filed by the promoterWe had received a sanction of the project for first 11 Floors and now we had received a sanction for 2 more floors. Thus, now total number of floors are 13. We have received a revised commencement on 11/04/2025. Thus, we are applying an extension for 6 Months More. We have already started a construction work of upper 2 floors and we have also completed a 50% of the same. Also, we are very much sure that we will complete a work till March 2026 and we will get a completion certificate till May 2026. But we are demanding an extension till June2026 for safer side. Also our project Lapsed on 30/09/

EA06082622034Sep 2025 → Jun 2027

Reason as filed by the promoterWe are applying for Extension of our Project Completion Date with MahaRERA Authority under Section - 7(3) of the Act. We would like to inform the Authority that the development on site is under process and is expected to be completed in next 10 to 11 months and then will require another 1 month to fulfil Sanction Authorities formalities and receive the completion certificate for the project. After conveying the same to the allottees, it was mutually decided to apply for an extension with the Authority. Hence, we request you to extend the proposed date of completion for the Project from 30/06/2

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed159

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 159 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form-2A 31032026.pdf6 Aug 2026
Withdrawal Update Form 1File: Form-1 Archictect Certificate 30062026.pdf5 Aug 2026
Withdrawal Update Form 2File: Form-2 Engineering Certificate 30062026 New.pdf5 Aug 2026
Withdrawal Update Form 3File: Form3 - CA Certificate.pdf5 Aug 2026
Withdrawal Update Form 1File: Form-1 31032026.pdf6 Apr 2026
Withdrawal Update Form 2File: Form-2 31032026.pdf6 Apr 2026
Withdrawal Update Form 3File: Form-3 31032026.pdf6 Apr 2026
Withdrawal Update Form 1File: Form-1 Architects Certificate 32122025.pdf26 Mar 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 31122025.pdf26 Mar 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 31122025.pdf26 Mar 2026
Layout approvalFile: Revised Santion Plan 1-6 11042025.pdf13 Feb 2026
Building plan approvalFile: Revised Sanction Plan 2-6 11042025.pdf13 Feb 2026
Building plan approvalFile: Revised Sanction Plan 3-6 11042025.pdf13 Feb 2026
Building plan approvalFile: Revised Sanction Plan 4-6 11042025.pdf13 Feb 2026
Building plan approvalFile: Revised Sanction Plan 5-6 11042025.pdf13 Feb 2026
Building plan approvalFile: Revised Sanction Plan 6-6 11042025.pdf13 Feb 2026
Form 1File: Form-1 Architect Certificate 24042025.pdf30 Dec 2025
Form 2File: Form 2 Engineer Certificate 24042025.pdf30 Dec 2025
Form 3File: Form 3 CA Certificate 24072024.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31032025.pdf30 Dec 2025
Form 1File: Form-1 Architect Certificate 15072024.pdf30 Dec 2025
Form 2File: Form 2 Engineer Certificate 11072024.pdf30 Dec 2025
Form 3File: Form 3 CA Certificate 24072024.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31122024.pdf30 Dec 2025
Form 1File: Form-1 Architect Certificate 25102024.pdf30 Dec 2025
Form 2File: Form 2 Engineer Certificate 25102024.pdf30 Dec 2025
Form 3File: Form 3 CA Certificate 24072024.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30092024.pdf30 Dec 2025
Form 1File: Form-1 Architect Certificate 02052023.pdf30 Dec 2025
Form 2File: Form 2 Engineer Certificate 02052023.pdf30 Dec 2025
Form 3File: Form 3 CA Certificate 06052023.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31122023.pdf30 Dec 2025
Form 1File: Form-1 Architect Certificate 02052023.pdf30 Dec 2025
Form 2File: Form 2 Engineer Certificate 02052023.pdf30 Dec 2025
Form 3File: Form 3 CA Certificate 06052023.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30092023.pdf30 Dec 2025
Form 1File: Form-1 Architect Certificate 02052023.pdf30 Dec 2025
Form 2File: Form 2 Engineer Certificate 02052023.pdf30 Dec 2025
Form 3File: Form 3 CA Certificate 06052023.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30062023.pdf30 Dec 2025
Form 1File: Form-1 Architect Certificate 02052023.pdf30 Dec 2025
Form 2File: Form 2 Engineer Certificate 01022023.pdf30 Dec 2025
Form 3File: Form 3 CA Certificate 15022023.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30062023.pdf30 Dec 2025
Form 1File: Form-1 Architect Certificate 02082022.pdf30 Dec 2025
Form 2File: Form 2 Engineer Certificate 02082022.pdf30 Dec 2025
Form 3File: Form 3 CA Certificate 09082022.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30092022.pdf30 Dec 2025
Form 1File: Form-1 Architect Certificate 27022022.pdf30 Dec 2025
Form 2File: Form 2 Engineer Certificate 02032022.pdf30 Dec 2025
Form 3File: Form 3 CA Certificate 05032022.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30062022.pdf30 Dec 2025
Form 1File: Form-1 Architect Certificate 07022024.pdf29 Dec 2025
Form 2File: Form 2 Engineer Certificate 09012024.pdf29 Dec 2025
Form 3File: Form 3 CA Certificate 11042024.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 08042024.pdf29 Dec 2025
Form 1File: Form-1 Architect Certificate 15072024.pdf29 Dec 2025
Form 2File: Form 2 Engineer Certificate 11072024.pdf29 Dec 2025
Form 3File: Form 3 CA Certificate 24072024.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 08042024.pdf29 Dec 2025
Form 1File: Form-1 Architect Certificate 01112022.pdf29 Dec 2025
Form 2File: Form 2 Engineer Certificate 01112022.pdf29 Dec 2025
Form 3File: Form 3 CA Certificate 18112022.pdf29 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31122022.pdf29 Dec 2025
Form 2A (FY 2023-2024)File: Form-2A FY 2023-24 25102024.pdf29 Dec 2025
Form 2A (FY 2022-2023)File: Form-2A FY 2022-23 10042024.pdf29 Dec 2025
Form 5 (FY 2023-2024)File: Form 5 CA Certificate FY 22-23 30092023.pdf29 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 CA Certificate FY 22-23 30092023.pdf29 Dec 2025
Withdrawal Update Form 1File: Architects Certificate- Form 1.pdf1 Dec 2025
Withdrawal Update Form 2File: Engineers certiticate- Form-2.pdf1 Dec 2025
Withdrawal Update Form 3File: Form3 - CA Certificate.pdf1 Dec 2025
Form 2A (FY 2024-2025)File: Form-2A - 2024-2025.pdf1 Dec 2025
Form 5 (FY 2024-2025)File: FORM 5 - Swami Pushpa - 2024-2025.pdf1 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf19 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf19 Nov 2025
Withdrawal Update Form 2File: Form 2 - Engineers Certificate.pdf19 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf19 Nov 2025
Withdrawal Update Form 3File: Form 3 - Sep 2025.pdf19 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - March 2025.pdf24 Apr 2025

How this compares with Pune

29%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 21 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SWAMIPUSHPA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SADASHIV PETH13,700+ in Pune

2 kmSWAMIPUSHPACompleted 191Lapsed / revoked 124Other 213Dot size: filed unitsN

Filed coordinates, straight-line distance. 528 registered projects within 2 km.

Builder: NUTAN DEVELOPPERS

NUTAN DEVELOPPERS has 1 registration on MahaRERA, including SWAMIPUSHPA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SWAMIPUSHPA is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWAMIPUSHPA?

The registered promoter entity is NUTAN DEVELOPPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWAMIPUSHPA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SWAMIPUSHPA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWAMIPUSHPA?

The professionals named in the filing: Architect: MILIND YADAV YADAV; Engineer: MILIND YADAV YADAV; Chartered Accountant: Priyesh Prakash Jain; Chartered Accountant: OMKAR U KHUDE & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWAMIPUSHPA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWAMIPUSHPA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWAMIPUSHPA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.