Home / Browse projects / Pune, Maharashtra / Suyog Sweet Home
Suyog Sweet Home
By Suyog Development Corporation Pune LLP
RG-MH-81689 · RERA P52100046502 · Last updated on MahaRERA portal: 20 Jul 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Suyog Sweet Home is a Residential / Group Housing project by Suyog Development Corporation Pune LLP in Pune, Maharashtra, registered with MahaRERA as P52100046502 on 10 Aug 2022. The registration is recorded completed; possession was promised by 31 Mar 2027. 12 of the 24 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameSuyog Sweet Home
- TypeResidential / Group Housing
- Location
- Kothrud
- Haveli
- Pune
- 411038
- Pincode411038
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100046502
- ReraGenie IDRG-MH-81689
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on10 Aug 2022
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed81 files
Current status
Figures as on 20 Jul 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sweet Home Heights Co Operative Housing Society Ltd | NA | 7 | 7 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.
Sweet Home Heights Co Operative Housing Society Ltd: 88% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 20 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Suyog Development Corporation Pune LLP | Pune (M Corp.) | Pune |
| Sweet Home Heights Co op. Housing Society Ltd | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sunil Shiram |
| Engineer | D B Associates |
| Chartered Accountant | A S Modak and Associates |
| Partner | Role in project |
|---|---|
| Suyog Development Corporation Pune LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jun 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2File: Form 2 Sweet Home 30062025.pdf | 20 Jul 2025 |
| Form 3File: Signed CA Certificate Suyog Sweet Home Upto June-25.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SWEETHOME INVENTORY.PDF | 20 Jul 2025 |
| Form 1File: OCC-0053-2025.pdf | 20 Jul 2025 |
| Occupational CertificateFile: Suyog Sweet Home OCC-0053-2025.pdf | 7 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SWEET HOME- FORM 1.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sweet Home.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Suyog SweetHome Inventory.pdf | 20 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Sweet Home.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Suyog Sweet Home.pdf | 22 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SUYOG SWEET HOME SOLD UNSOLD INVENTORY LIST 21012025.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- SWEET HOMES_070125.pdf | 20 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANK LETTER SDC PUNE LLP SWEET HOME.pdf | 14 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY SWEETHOME 300924 Copy.pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sweet home.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sweet Home.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form V suyog sweet home.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 Sweet Homes 30062024.pdf | 13 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SWEET HOME FORM 1 (1).pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 Sweet Homes.pdf | 20 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SUYOG SWEET HOMES FORM NO 2A YR 23 24.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sweet Home Architect Certificate Pune LLP Q4.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 Suyog Sweet Home 31032024.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Suyog Sweet Homes sold unsold.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1_Sweet Home_04032024.pdf | 7 Mar 2024 |
| Building plan approvalFile: PLAN 1635-23.pdf | 4 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 1635-23.pdf | 4 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC-1635-2023.pdf | 4 Mar 2024 |
| Declaration about Commencement CertificateFile: Declaration abot Commencement Certificate alongwith CC.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Suyog Sweet Home_31122023.pdf | 19 Jan 2024 |
| CERSAI detailsFile: Undertaking to CERSAI_Suyog Sweet Home_31122023.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Sweet Home_31122023.pdf | 11 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory_Suyog Sweet Home_31122023.pdf | 8 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Suyog Sweet Home_31032023.pdf | 12 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Suyog Sweet Home_31032023.pdf | 28 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Sweet Home_30092023.pdf | 23 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Sweet Home_30092023.pdf | 23 Oct 2023 |
| CERSAI detailsFile: Undertaking to CERSAI on no security interest_30092023.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory_30092023.pdf | 9 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Sweet Home_30092023.pdf | 5 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Suyog Sweet Home_30062023.pdf | 11 Sep 2023 |
| CERSAI detailsFile: CERSAI Report_Sweet Home_30062023.pdf | 21 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Suyog Sweet Home_30062023.pdf | 17 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Sweet Home_30062023.pdf | 5 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold or booked inventory_Suyog Sweet Home_30062023.pdf | 4 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Sweet Home_31032023.pdf | 12 May 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory_Sweet Home_31122022.pdf | 3 May 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory_31032023.pdf | 3 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sweet Home_31032023.pdf | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_31032023.pdf | 12 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Suyog Sweet Home_30092022.pdf | 6 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Suyog Sweet Home_31122022.pdf | 6 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sweet Home_30092022.pdf | 18 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sweet Home_31122022.pdf | 18 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_December 2022.pdf | 21 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold inventory_Sweet Home_30092022.pdf | 9 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sweet Home Heights_08102022.pdf | 3 Jan 2023 |
| Proforma of Allotment letterFile: Allotment of Flat 5.pdf | 9 Aug 2022 |
| Proforma of Allotment letterFile: Agreement for Sale.pdf | 9 Aug 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Sheet_allotment letter.pdf | 9 Aug 2022 |
| Details of encumbrances concerned to LegalFile: No Litigation Certificate_Legal 02082022.pdf | 8 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Sheet_Agreement final.pdf | 8 Aug 2022 |
| CERSAI detailsFile: CERSAI Search Report_02082022.pdf | 2 Aug 2022 |
| PAN CardFile: SDC pune LLP PAN Card.pdf | 20 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf | 20 Jul 2022 |
| Details of encumbrances concerned to LegalFile: No Encumbrance certificate.pdf | 15 Jul 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: No encumbrance on Bank Account or no escrow on the same.pdf | 15 Jul 2022 |
| Layout approvalFile: Building plan 1_11zon (1).pdf | 10 Jun 2022 |
| Building plan approvalFile: Building plan 1_11zon (1).pdf | 10 Jun 2022 |
| Building plan approvalFile: Building Plan 2_11zon.pdf | 10 Jun 2022 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 10 Jun 2022 |
| Details of encumbrancesFile: Legal Title Report.pdf | 10 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: Building plan 1_11zon (1).pdf | 10 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building plan 1_11zon (1).pdf | 10 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2_11zon.pdf | 10 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate (2).pdf | 10 Jun 2022 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 10 Jun 2022 |
| Declaration in FORM BFile: Form B_Affidavit cum declaration_Promoter.pdf | 10 Jun 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Form 1.pdf | 10 Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
Keep Suyog Sweet Home on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kothrud13,700+ in Pune
Filed coordinates, straight-line distance. 308 registered projects within 2 km.
Pratik Nagar Palladio Kothrud Central
Vilas Javdekar Infinitee Developers Pvt. L
NEW FRIENDS
MAJESTIQUE DUROPOLIS PRIVATE LIMITED
SARVATRA CO-OP HSG SOCIETY LTD
Suryakant Kakade
Kshitij Residency
Yash Buildcon
MAYUK
MAYUR CORPORATION
Pune Baner Project-Tower 4 and 5
Goel Ganga Ventures India Private Limited
Builder: Suyog Development Corporation Pune LLP
Suyog Development Corporation Pune LLP has 3 registrations on MahaRERA, including Suyog Sweet Home and SUYOG LAUKIK APARTMENT. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Suyog Sweet Home is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Suyog Sweet Home?
The registered promoter entity is Suyog Development Corporation Pune LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Suyog Sweet Home?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Suyog Sweet Home?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Suyog Sweet Home?
The professionals named in the filing: Architect: Sunil Shiram; Engineer: D B Associates; Chartered Accountant: A S Modak and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Suyog Sweet Home?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback