SUVIK ASPIRE
RG-MH-88460 · RERA P51600053648 · Last updated on MahaRERA portal: 9 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUVIK ASPIRE is a Residential / Group Housing project by SUVIK BUILDCON LLP in Nashik, Maharashtra, registered with MahaRERA as P51600053648 on 21 Nov 2023. Possession is promised by 31 Dec 2026. 55 of the 84 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameSUVIK ASPIRE
- TypeResidential / Group Housing
- Location
- DEEPALI NAGAR
- NEAR INDIRA NAGAR JOGGING TRACK
- Nashik (M Corp.)
- Nashik
- 422009
- Pincode422009
- RERA no.P51600053648
- ReraGenie IDRG-MH-88460
Builder
- NameSUVIK BUILDCON LLP
- Entity typePartnership
- PartnersGangadhar Karbhari Jadhav, Sumit Ishwar Chaudhari
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Nov 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed75 files
Current status
Figures as on 9 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SUVIK ASPIRE | NA | 16 | 14 | 84 | 0 | 84 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
SUVIK ASPIRE: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
Progress on shared amenities15
As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed85
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SUVIK ASPIRE | NA | Rs 21.66 cr | Rs 14.92 cr |
| - | NA | Rs 1.00 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUMIT KUMATH |
| Engineer | ABHISHEK JAIN |
| Chartered Accountant | CA KRISHNA JAJOO |
| Chartered Accountant | CA Jiwan B Bedmutha |
| Partner | Role in project |
|---|---|
| SUVIK BUILDCON LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architech Certificate 30_6_2025.pdf | 9 Jun 2026 |
| Withdrawal Update Form 1File: Architech certificate - sep 25.pdf | 9 Jun 2026 |
| Withdrawal Update Form 1File: Architech certificate - Dec 25.pdf | 9 Jun 2026 |
| Withdrawal Update Form 1File: Architech certificate - Mar 26.pdf | 9 Jun 2026 |
| Withdrawal Update Form 2File: Engineer certificate 30_6_2025.pdf | 9 Jun 2026 |
| Withdrawal Update Form 2File: Enginner certificate - Sept 25.pdf | 9 Jun 2026 |
| Withdrawal Update Form 2File: Enginner certificate Dec 2025.pdf | 9 Jun 2026 |
| Withdrawal Update Form 2File: Enginner certificate Mar 26.pdf | 9 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Certificate 30_6_2025.pdf | 9 Jun 2026 |
| Withdrawal Update Form 3File: CA Form 3 certificate Sep 25.pdf | 9 Jun 2026 |
| Withdrawal Update Form 3File: CA Form 3 certificate Dec 25.pdf | 9 Jun 2026 |
| Withdrawal Update Form 3File: CA Form 3 certificate Dec 25.pdf | 9 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Architect certificate.pdf | 1 Jun 2026 |
| Withdrawal Update Form 2File: Enginner certificate Mar 26.pdf | 1 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 - Q4_31_03_FY 2025-2026 CA Certificate.pdf | 1 Jun 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 10 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form--3.pdf | 10 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of inventory.pdf | 10 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 9 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 7 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 7 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf | 7 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A.pdf | 1 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf | 2 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inverntory.pdf | 19 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect certificate.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engg certificate .pdf | 18 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Summary.pdf | 7 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No-3.pdf | 4 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate.pdf | 2 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2Engg.pdf | 2 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Soldunsold Inventory details.pdf | 2 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf | 18 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-2.pdf | 13 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - 2.pdf | 13 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Flat Booking - 2.pdf | 13 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: Details of Legal Encumbrances.pdf | 11 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Details of Legal Encumbrances.pdf | 11 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf | 2 Nov 2023 |
| Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf | 2 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: 19_Deviation Report Allotment letter.pdf | 2 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: 20_Deviation Report model copy of Agreement.pdf | 2 Nov 2023 |
| Other - TechnicalFile: Disclosure of Interest in Other Real Estate_Sumit Chaudhari.pdf | 2 Nov 2023 |
| Other - TechnicalFile: Gmail - Applicant _application no REA51600148455.pdf | 2 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: 4_Self declaration - Encumbrances Certificate.pdf | 26 Oct 2023 |
| Details of encumbrances concerned to LegalFile: 4_Self declaration - Encumbrances Certificate.pdf | 26 Oct 2023 |
| Declaration in FORM BFile: 8_Declaration in Form B.pdf | 23 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form-3_Suvik.pdf | 23 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate-GKJ.pdf | 23 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12_Engineer Certificate.pdf | 21 Oct 2023 |
| Layout approvalFile: 6_Building Plan_uploaded.pdf | 17 Oct 2023 |
| Building plan approvalFile: 6_Building Plan_uploaded.pdf | 17 Oct 2023 |
| Building plan approvalFile: 6_Building Plan (2)_uploaded.pdf | 17 Oct 2023 |
| PAN CardFile: 1_Suvik_PAN CARD.pdf | 17 Oct 2023 |
| Copy of the legal title reportFile: 2_Title Certificate - 807_uploaded.pdf | 17 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: 6_Building Plan_uploaded.pdf | 17 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6_Building Plan_uploaded.pdf | 17 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6_Building Plan (2)_uploaded.pdf | 17 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 7_COMMENCEMENT CERTIFICATE.pdf | 17 Oct 2023 |
| Declaration about Commencement CertificateFile: 13_Declaration about Commencement Certificate.pdf | 17 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11_Architect Certificate.pdf | 17 Oct 2023 |
| CERSAI detailsFile: 16_CERSAI Report.pdf | 17 Oct 2023 |
| Proforma of Agreement for saleFile: 10_Draft Agreement for Sale.pdf | 17 Oct 2023 |
| Proforma of Allotment letterFile: 9_Proforma of Allotment letter_uploaded.pdf | 17 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 17_Declaration about Seperate Bank Account.pdf | 17 Oct 2023 |
| Deviation Report with respect to Allotment letterFile: 19_Deviation Report Allotment letter.pdf | 17 Oct 2023 |
| Deviation Report with respect to model copy of AgreementFile: 20_Deviation Report model copy of Agreement.pdf | 17 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SUVIK ASPIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR INDIRA NAGAR JOGGING TRACK4,100+ in Nashik
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: SUVIK BUILDCON LLP
SUVIK BUILDCON LLP has 1 registration on MahaRERA, including SUVIK ASPIRE. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SUVIK ASPIRE is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUVIK ASPIRE?
The registered promoter entity is SUVIK BUILDCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUVIK ASPIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SUVIK ASPIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUVIK ASPIRE?
The professionals named in the filing: Architect: SUMIT KUMATH; Engineer: ABHISHEK JAIN; Chartered Accountant: CA KRISHNA JAJOO; Chartered Accountant: CA Jiwan B Bedmutha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUVIK ASPIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback