ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / SUVIK ASPIRE

Registered No litigation declared Residential / Group Housing project

SUVIK ASPIRE

By SUVIK BUILDCON LLP

RG-MH-88460 · RERA P51600053648 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 90%
29 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

SUVIK ASPIRE is a Residential / Group Housing project by SUVIK BUILDCON LLP in Nashik, Maharashtra, registered with MahaRERA as P51600053648 on 21 Nov 2023. Possession is promised by 31 Dec 2026. 55 of the 84 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSUVIK ASPIRE
  • TypeResidential / Group Housing
  • Location
    • DEEPALI NAGAR
    • NEAR INDIRA NAGAR JOGGING TRACK
    • Nashik (M Corp.)
    • Nashik
    • 422009
  • Pincode422009
  • RERA no.P51600053648
  • ReraGenie IDRG-MH-88460

Builder

  • NameSUVIK BUILDCON LLP
  • Entity typePartnership
  • PartnersGangadhar Karbhari Jadhav, Sumit Ishwar Chaudhari
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Nov 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

65%55 of 84 units booked
65.8%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUVIK ASPIRENA161484084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

SUVIK ASPIRE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed85

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots85
Closed/Covered1
Open Space84

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,470 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jun 2026

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI9436.5
Proposed, not sanctioned9,436 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHARANPUR ROAD, NASHIK
Estimated costRs 22.66 cr
Cost incurredRs 14.92 cr
Work done65.83%
BuildingWingEstimatedIncurred
SUVIK ASPIRENARs 21.66 crRs 14.92 cr
-NARs 1.00 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMIT KUMATH
EngineerABHISHEK JAIN
Chartered AccountantCA KRISHNA JAJOO
Chartered AccountantCA Jiwan B Bedmutha
PartnerRole in project
SUVIK BUILDCON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architech Certificate 30_6_2025.pdf9 Jun 2026
Withdrawal Update Form 1File: Architech certificate - sep 25.pdf9 Jun 2026
Withdrawal Update Form 1File: Architech certificate - Dec 25.pdf9 Jun 2026
Withdrawal Update Form 1File: Architech certificate - Mar 26.pdf9 Jun 2026
Withdrawal Update Form 2File: Engineer certificate 30_6_2025.pdf9 Jun 2026
Withdrawal Update Form 2File: Enginner certificate - Sept 25.pdf9 Jun 2026
Withdrawal Update Form 2File: Enginner certificate Dec 2025.pdf9 Jun 2026
Withdrawal Update Form 2File: Enginner certificate Mar 26.pdf9 Jun 2026
Withdrawal Update Form 3File: Form 3 Certificate 30_6_2025.pdf9 Jun 2026
Withdrawal Update Form 3File: CA Form 3 certificate Sep 25.pdf9 Jun 2026
Withdrawal Update Form 3File: CA Form 3 certificate Dec 25.pdf9 Jun 2026
Withdrawal Update Form 3File: CA Form 3 certificate Dec 25.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 Architect certificate.pdf1 Jun 2026
Withdrawal Update Form 2File: Enginner certificate Mar 26.pdf1 Jun 2026
Withdrawal Update Form 3File: Form 3 - Q4_31_03_FY 2025-2026 CA Certificate.pdf1 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf10 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form--3.pdf10 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf10 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure of inventory.pdf10 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A.pdf1 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold inverntory.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect certificate.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engg certificate .pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Summary.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Summary.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No-3.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate.pdf2 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2Engg.pdf2 Jul 2024
Disclosure of sold/ booked inventoryFile: Soldunsold Inventory details.pdf2 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf18 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-2.pdf13 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - 2.pdf13 Mar 2024
Disclosure of sold/ booked inventoryFile: Flat Booking - 2.pdf13 Mar 2024
Details of encumbrances concerned to FinanceFile: Details of Legal Encumbrances.pdf11 Nov 2023
Details of encumbrances concerned to LegalFile: Details of Legal Encumbrances.pdf11 Nov 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf2 Nov 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf2 Nov 2023
Deviation Report with respect to Allotment letterFile: 19_Deviation Report Allotment letter.pdf2 Nov 2023
Deviation Report with respect to model copy of AgreementFile: 20_Deviation Report model copy of Agreement.pdf2 Nov 2023
Other - TechnicalFile: Disclosure of Interest in Other Real Estate_Sumit Chaudhari.pdf2 Nov 2023
Other - TechnicalFile: Gmail - Applicant _application no REA51600148455.pdf2 Nov 2023
Details of encumbrances concerned to FinanceFile: 4_Self declaration - Encumbrances Certificate.pdf26 Oct 2023
Details of encumbrances concerned to LegalFile: 4_Self declaration - Encumbrances Certificate.pdf26 Oct 2023
Declaration in FORM BFile: 8_Declaration in Form B.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form-3_Suvik.pdf23 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate-GKJ.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12_Engineer Certificate.pdf21 Oct 2023
Layout approvalFile: 6_Building Plan_uploaded.pdf17 Oct 2023
Building plan approvalFile: 6_Building Plan_uploaded.pdf17 Oct 2023
Building plan approvalFile: 6_Building Plan (2)_uploaded.pdf17 Oct 2023
PAN CardFile: 1_Suvik_PAN CARD.pdf17 Oct 2023
Copy of the legal title reportFile: 2_Title Certificate - 807_uploaded.pdf17 Oct 2023
Copy of Layout Approval (in case of layout)File: 6_Building Plan_uploaded.pdf17 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 6_Building Plan_uploaded.pdf17 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 6_Building Plan (2)_uploaded.pdf17 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: 7_COMMENCEMENT CERTIFICATE.pdf17 Oct 2023
Declaration about Commencement CertificateFile: 13_Declaration about Commencement Certificate.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11_Architect Certificate.pdf17 Oct 2023
CERSAI detailsFile: 16_CERSAI Report.pdf17 Oct 2023
Proforma of Agreement for saleFile: 10_Draft Agreement for Sale.pdf17 Oct 2023
Proforma of Allotment letterFile: 9_Proforma of Allotment letter_uploaded.pdf17 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 17_Declaration about Seperate Bank Account.pdf17 Oct 2023
Deviation Report with respect to Allotment letterFile: 19_Deviation Report Allotment letter.pdf17 Oct 2023
Deviation Report with respect to model copy of AgreementFile: 20_Deviation Report model copy of Agreement.pdf17 Oct 2023

How this compares with Nashik

65%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUVIK ASPIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR INDIRA NAGAR JOGGING TRACK4,100+ in Nashik

Builder: SUVIK BUILDCON LLP

SUVIK BUILDCON LLP has 1 registration on MahaRERA, including SUVIK ASPIRE. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SUVIK ASPIRE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUVIK ASPIRE?

The registered promoter entity is SUVIK BUILDCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUVIK ASPIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUVIK ASPIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUVIK ASPIRE?

The professionals named in the filing: Architect: SUMIT KUMATH; Engineer: ABHISHEK JAIN; Chartered Accountant: CA KRISHNA JAJOO; Chartered Accountant: CA Jiwan B Bedmutha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUVIK ASPIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUVIK ASPIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUVIK ASPIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.