ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SUVIDHA

Registered No litigation declared Others project

SUVIDHA

By NEIRA PROPERTIES LLP

RG-MH-18753 · RERA P52100077563 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 0%
27 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

SUVIDHA is a Others project by NEIRA PROPERTIES LLP in Pune, Maharashtra, registered with MahaRERA as P52100077563 on 11 Oct 2024. Possession is promised by 31 Mar 2028. 0 of the 27 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameSUVIDHA
  • TypeOthers
  • Location
    • Survey No 83
    • Hissa No 17/10/2
    • CTS No 1986 (part) Plot No 2
    • Parvati North
    • Parvati
    • Haveli
    • Pune
    • 411009
  • Pincode411009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077563
  • ReraGenie IDRG-MH-18753

Builder

  • NameNEIRA PROPERTIES LLP
  • Entity typeLimited Liability Partnership
  • LLPINAAW-6913
  • PartnersAbhijeet Ratnakant Bhosale, Amit Vijay Bhatevara
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2024PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Oct 2024
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed140 files

Current status

0%0 of 27 units booked
3.5%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUVIDHANA6518927

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SUVIDHA: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed59

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots59
Closed/Covered59

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area942 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
Suvidha Towers CondominiumParvatiPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI2040.22
Proposed, not sanctioned2,040 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJANGLI MAHARAJ ROAD DISTT. PUNE, MAHARASHTRA 411004
Estimated costRs 4.35 cr
Cost incurredRs 15.30 lakh
Work done3.52%
BuildingWingEstimatedIncurred
SUVIDHANARs 4.35 crRs 15.30 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAPG Arch Studio
EngineerAmit Vijay Bhatevara
Chartered AccountantS.N. Khandelwal & Co
Chartered AccountantSanjay Ramniwas Jakhotiya
PartnerRole in project
NIRA PROPERTIES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: Plan 1.pdf30 Apr 2026
Building plan approvalFile: Plan 2.pdf30 Apr 2026
Layout approvalFile: Layout.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 Mar26.pdf19 Apr 2026
Withdrawal Update Form 2File: Form 2 Mar26.pdf19 Apr 2026
Withdrawal Update Form 3File: Form 3 Mar26.pdf19 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf28 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf28 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf28 Oct 2025
Form 5 (FY 2024-2025)File: RERA FORM 5 - 30-10-2025.pdf28 Oct 2025
Layout approvalFile: Layout.pdf23 Jul 2025
Building plan approvalFile: Plan 1.pdf23 Jul 2025
Building plan approvalFile: Plan 2.pdf23 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3compressed.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf18 Jan 2025
Other - TechnicalFile: Order No-50.pdf7 Oct 2024
Other - TechnicalFile: Verification -mail - CC - PMC (1).pdf7 Oct 2024
Other - TechnicalFile: Order No-50.pdf7 Oct 2024
Other - TechnicalFile: Verification -mail - CC - PMC (1).pdf7 Oct 2024
Other - TechnicalFile: Order No-50.pdf7 Oct 2024
Other - TechnicalFile: Verification -mail - CC - PMC (1).pdf7 Oct 2024
Other - TechnicalFile: Order No-50.pdf7 Oct 2024
Other - TechnicalFile: Verification -mail - CC - PMC (1).pdf7 Oct 2024
PAN CardFile: PAN CARD - NIRA PROPERTIES LLP.pdf6 Oct 2024
Copy of the legal title reportFile: Title Report.pdf6 Oct 2024
Details of encumbrances concerned to FinanceFile: Encrumbance Letter - Finance.pdf6 Oct 2024
Details of encumbrances concerned to FinanceFile: Encrumbance Letter - Legal.pdf6 Oct 2024
Proforma of Allotment letterFile: Final Allotment Suvidha.pdf6 Oct 2024
Declaration in FORM BFile: FORM -B Promoter - 05-09-2024.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate - Form -1.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Suvidha Final Form 3.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Suvidha.pdf6 Oct 2024
Declaration about Commencement CertificateFile: FORMAT D - Declaration about CC.pdf6 Oct 2024
CERSAI detailsFile: DECLARATION of Cersai.pdf6 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - All RERA Bank Account.pdf6 Oct 2024
Deviation Report with respect to Allotment letterFile: AL - Deviation Report - Suvidha -18-9-2024.pdf6 Oct 2024
Details of encumbrances concerned to LegalFile: Encrumbance Letter - Finance.pdf6 Oct 2024
Details of encumbrances concerned to LegalFile: Encrumbance Letter - Legal.pdf6 Oct 2024
Deviation Report with respect to model copy of AgreementFile: AFS Deviation Report - Suvidha -13-9-2024_compressed.pdf6 Oct 2024
Proforma of Agreement for saleFile: AFS Final Suvidha.pdf6 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf6 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Sbi Decalaration (1).pdf6 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure Secured unsecured suvidha (1).pdf6 Oct 2024
PAN CardFile: PAN CARD - NIRA PROPERTIES LLP.pdf6 Oct 2024
Copy of the legal title reportFile: Title Report.pdf6 Oct 2024
Details of encumbrances concerned to FinanceFile: Encrumbance Letter - Finance.pdf6 Oct 2024
Details of encumbrances concerned to FinanceFile: Encrumbance Letter - Legal.pdf6 Oct 2024
Proforma of Allotment letterFile: Final Allotment Suvidha.pdf6 Oct 2024
Declaration in FORM BFile: FORM -B Promoter - 05-09-2024.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate - Form -1.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Suvidha Final Form 3.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Suvidha.pdf6 Oct 2024
Declaration about Commencement CertificateFile: FORMAT D - Declaration about CC.pdf6 Oct 2024
CERSAI detailsFile: DECLARATION of Cersai.pdf6 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - All RERA Bank Account.pdf6 Oct 2024
Deviation Report with respect to Allotment letterFile: AL - Deviation Report - Suvidha -18-9-2024.pdf6 Oct 2024
Details of encumbrances concerned to LegalFile: Encrumbance Letter - Finance.pdf6 Oct 2024
Details of encumbrances concerned to LegalFile: Encrumbance Letter - Legal.pdf6 Oct 2024
Deviation Report with respect to model copy of AgreementFile: AFS Deviation Report - Suvidha -13-9-2024_compressed.pdf6 Oct 2024
Proforma of Agreement for saleFile: AFS Final Suvidha.pdf6 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf6 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Sbi Decalaration (1).pdf6 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure Secured unsecured suvidha (1).pdf6 Oct 2024
PAN CardFile: PAN CARD - NIRA PROPERTIES LLP.pdf6 Oct 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Bhansali campus phase IIP52100029257near sinhgad college, PuneMay 2021CompletedJan 2028Oct 2022

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUVIDHA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Parvati North13,700+ in Pune

2 kmSUVIDHACompleted 49Lapsed / revoked 26Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 161 registered projects within 2 km.

Builder: NEIRA PROPERTIES LLP

NEIRA PROPERTIES LLP has 1 registration on MahaRERA, including SUVIDHA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SUVIDHA is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUVIDHA?

The registered promoter entity is NEIRA PROPERTIES LLP, a limited liability partnership as per the filing. Its LLPIN AAW-6913 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUVIDHA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUVIDHA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUVIDHA?

The professionals named in the filing: Architect: APG Arch Studio; Engineer: Amit Vijay Bhatevara; Chartered Accountant: S.N. Khandelwal & Co; Chartered Accountant: Sanjay Ramniwas Jakhotiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUVIDHA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUVIDHA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUVIDHA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.