ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Suvarnashilpa

Registration lapsed No litigation declared Others project

Suvarnashilpa

By M/s Kajale Buildcon

RG-MH-15293 · RERA P52100024287 · Last updated on MahaRERA portal: 1 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
14 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Suvarnashilpa is a Others project by M/s Kajale Buildcon in Pune, Maharashtra, registered with MahaRERA as P52100024287 on 3 Feb 2020. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 0 of the 14 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSuvarnashilpa
  • TypeOthers
  • Location
    • Sadashiv Peth
    • Pune City
    • Pune
    • 411030
  • Pincode411030
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024287
  • ReraGenie IDRG-MH-15293

Builder

  • NameM/s Kajale Buildcon
  • Entity typePartnership
  • PartnersDnyaneshwar Shankar Kajale, Shobha Dyaneshwar Kajale, Nitin Dyaneshwar Kajale

Key dates

10 months past promisethis monthRegisteredFeb 2020PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Feb 2020
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

0%0 of 14 units booked
0.3%Work done, per cost certificate

Figures as on 1 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUVARNASHILPANA738614

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SUVARNASHILPA: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area323 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jun 2025
LandownerVillageDistrict
Dnyaneshwar Shankar KajalePune (M Corp.)Pune
Nitin Dnyaneshwar KajalePune (M Corp.)Pune
Sachin Dnyneshwar Kajale-Pune
Shobha Dnyneshwar Kajale-Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI635.48
Proposed, not sanctioned318 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMarket Yard, Manchar
Estimated costRs 5.00 cr
Cost incurredRs 1.50 lakh
Work done0.3%
BuildingWingEstimatedIncurred
SUVARNASHILPANARs 5.00 crRs 1.50 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS.B.SANGLE & ASSOCIATES
EngineerRAM RANDHAVE
Chartered AccountantManoj Bhansali
PartnerRole in project
M/s Kajale Buildcon-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Ar - Jun 24.pdf1 Jul 2025
Form 2File: Er - Jun 24.pdf1 Jul 2025
Form 3File: CA - June 24.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Jun 24.pdf1 Jul 2025
Form 1File: Ar - Sep 24.pdf1 Jul 2025
Form 2File: Er - Sep 24.pdf1 Jul 2025
Form 3File: CA - Sep 24.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Sep 24.pdf1 Jul 2025
Form 1File: Ar - Dec 24.pdf1 Jul 2025
Form 2File: Er - Dec 24.pdf1 Jul 2025
Form 3File: CA - Dec 24.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Dec 24.pdf1 Jul 2025
Form 1File: Ar - Mar 25.pdf1 Jul 2025
Form 2File: Er - Mar 25.pdf1 Jul 2025
Form 3File: CA - Mar 25.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Mar 25.pdf1 Jul 2025
Withdrawal Update Form 1File: Ar - Mar 25.pdf1 Jul 2025
Withdrawal Update Form 2File: Er - Mar 25.pdf1 Jul 2025
Withdrawal Update Form 3File: CA - Mar 25.pdf1 Jul 2025
Form 5 (FY 2022-2023)File: Form 5 - 2022-2023.pdf1 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 - 2023-2024.pdf1 Jul 2025
Form 5 (FY 2024-2025)File: Form 5 - 2024-2025.pdf1 Jul 2025
Form 5 (FY 2019-2020)File: Form 5 - 2019-2020.pdf1 Jul 2025
Form 5 (FY 2020-2021)File: Form 5 - 2020-2021.pdf1 Jul 2025
Form 5 (FY 2021-2022)File: Form 5 - 2021-2022.pdf1 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: KAJALE BUILDCON - RERA AUDIT - FY 2021-2022.pdf1 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kajale Buildcon_Form3-CA_Certificate_QTR4_FY 2021-2022.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_QTR2_.pdf15 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_QTR3_.pdf15 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Sept'21.pdf15 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Dec'21.pdf15 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate-QTR2-FY2021-2022.pdf15 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate-QTR3-FY2021-2022.pdf15 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 - KAJALE BUILDCON - RERA AUDIT.pdf2 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate upto 31-12-2020.pdf17 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31-03-2021.pdf17 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-06-2021.pdf17 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Upto 31-12-2020.pdf17 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Upto 31-03-2021.pdf17 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Upto 30-06-2021.pdf17 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate- QTR3-FY2020-2021.pdf17 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate-QTR4-FY2021-2022.pdf17 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate-QTR1-FY2021-2022.pdf17 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Audit Report_FY 2019-20.pdf19 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA Audit Report_FY 2019-20_.pdf19 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf4 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf4 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf4 Dec 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf15 Aug 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf15 Aug 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf15 Aug 2020
Building plan approvalFile: Building Plan 1.pdf24 Jan 2020
Building plan approvalFile: Building Plan 2.pdf24 Jan 2020
Building plan approvalFile: Building Plan 3.pdf24 Jan 2020
Building plan approvalFile: Building Plan 4.pdf24 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1.pdf24 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf24 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3.pdf24 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 4.pdf24 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Jan 2020
Layout approvalFile: Layout Plan.pdf16 Jan 2020
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf16 Jan 2020
Declaration in FORM BFile: Form B.pdf16 Jan 2020
Proforma of Allotment letterFile: Allotment Letter.pdf13 Jan 2020
Proforma of Allotment letterFile: Agreement for sale.pdf13 Jan 2020
OtherFile: Kajale Buildcon Credei Certificate.pdf13 Jan 2020
PAN CardFile: PAN CARD.pdf3 Jan 2020
Copy of the legal title reportFile: Legal Title Report.pdf3 Jan 2020
Details of encumbrancesFile: Encumbrancy Certificate.pdf3 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf3 Jan 2020
OtherFile: Partnership Deed_.pdf3 Jan 2020
OtherFile: Property Statement.pdf3 Jan 2020
OtherFile: Aadhar Card copy.pdf3 Jan 2020

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Suvarnashilpa on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sadashiv Peth13,700+ in Pune

2 kmSuvarnashilpaCompleted 168Lapsed / revoked 141Other 148Dot size: filed unitsN

Filed coordinates, straight-line distance. 457 registered projects within 2 km.

Builder: M/s Kajale Buildcon

M/s Kajale Buildcon has 1 registration on MahaRERA, including Suvarnashilpa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Suvarnashilpa shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Suvarnashilpa is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Suvarnashilpa?

The registered promoter entity is M/s Kajale Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Suvarnashilpa?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Suvarnashilpa?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Suvarnashilpa?

The professionals named in the filing: Architect: S.B.SANGLE & ASSOCIATES; Engineer: RAM RANDHAVE; Chartered Accountant: Manoj Bhansali. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Suvarnashilpa?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Suvarnashilpa. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Suvarnashilpa to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.