Home / Browse projects / Aurangabad, Maharashtra / SURYAKUNJ RESIDENCY

Registration lapsed No litigation declared Others project

SURYAKUNJ RESIDENCY

By GHUGE INFRASTRUCTURE

RG-MH-59744 · RERA P51500030654 · Last updated on MahaRERA portal: 29 Sep 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
43 of 66Construction stages doneacross 6 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
0Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

SURYAKUNJ RESIDENCY is a Others project by GHUGE INFRASTRUCTURE in Aurangabad, Maharashtra, registered with MahaRERA as P51500030654 on 8 Sep 2021. Possession was promised by 31 Mar 2026 and is now 7 months past that date.

At a glance

Project

  • NameSURYAKUNJ RESIDENCY
  • TypeOthers
  • Location
    • CHATE SCHOOL ROAD
    • SATARA PARISAR
    • Satara (CT)
    • Aurangabad
    • 431010
  • Pincode431010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500030654
  • ReraGenie IDRG-MH-59744

Builder

  • NameGHUGE INFRASTRUCTURE
  • Entity typeOthers
  • Named personJAYDEEP PANDHARINATH GHUGE

Key dates

7 months past promisethis monthRegisteredSep 2021PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 Sep 2021
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings6 building records
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING TYPE ANA44000
WING B1NA87000
WING B2NA87000
WING B3NA82000
ROW HOUSE WING C1NA22000
ROW HOUSE WING C2NA22000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 29 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

43 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

BUILDING TYPE A73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
WING B187%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
WING B287%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
WING B387%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
ROW HOUSE WING C191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE WING C291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes50%
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
BUILDING TYPE A11
WING B111
WING B211
WING B311

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,837 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authorityAurangabad Municipal Corporation, Aurangabad
Permissible FSI9280.45
Proposed, not sanctioned5,940 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHASHTRY NAGAR, AKASHWANI JALNA ROAD AURANGABAD

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAKHARE ASSOCIATES
EngineerAKASH PATHRIKAR PATHRIKAR
Chartered AccountantBANGAD PARJANE AND CO
Chartered AccountantS. O. MANTRI & COMPANY
PartnerRole in project
GHUGE INFRASTRUCTURE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 1 Form-1 June 25.pdf29 Sep 2025
Form 2File: 2 Form 2 Jun 25.pdf29 Sep 2025
Form 3File: 3 Form-3 June 25.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold June 25.pdf29 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 June 24.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Sep 24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 June 24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Sep 24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Dec 24.pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 CA.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Suryakunj Residency Form-1 05-Jan-24.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Suryakunj Residency Form-1 08-April-24.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Suryakunj Residency Form-2 05-Jan-24.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Suryakunj Residency Form-2 08-April-24.pdf30 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Suryakunj Residency Form-2A 08-April-24.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: Suryakunj Residency Sold-31-Dec-23.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: Suryakunj Residency Sold-31-March-24.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 ( 12-01-2023 ).pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 ( 06-10-2023 ).pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 ( 12-01-2023 ).pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 ( 06-10-2023 ).pdf22 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold unsold sep 2023.pdf22 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 ( 2021-22 ).pdf22 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 ( 2022-23 ).pdf22 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold_compressed.pdf4 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Architect's Certificate_compressed.pdf8 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2Engineer's Certificate_compressed.pdf8 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Quality Assurance.pdf8 Mar 2022
Copy of the legal title reportFile: Search format A Report.pdf31 Aug 2021
Layout approvalFile: HPSCANNER1245_compressed.pdf30 Aug 2021
Layout approvalFile: HPSCANNER1246_compressed (1).pdf30 Aug 2021
Building plan approvalFile: HPSCANNER1247_compressed.pdf30 Aug 2021
PAN CardFile: Pan Card.PDF30 Aug 2021
Details of encumbrancesFile: Ghege Infrastructure Leetarhaed.pdf30 Aug 2021
Copy of Layout Approval (in case of layout)File: HPSCANNER1245_compressed.pdf30 Aug 2021
Copy of Layout Approval (in case of layout)File: HPSCANNER1246_compressed (1).pdf30 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER1247_compressed.pdf30 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: DOC.pdf30 Aug 2021
Declaration about Commencement CertificateFile: Ghuge Infrastructure Format D.pdf30 Aug 2021
Declaration in FORM BFile: Ghuge Infrastructure Form B_compressed.pdf30 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.PDF30 Aug 2021
Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf30 Aug 2021

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SURYAKUNJ RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SATARA PARISAR1,400+ in Aurangabad

2 kmSURYAKUNJ RESIDENCYCompleted 17Lapsed / revoked 9Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 50 registered projects within 2 km.

Builder: GHUGE INFRASTRUCTURE

GHUGE INFRASTRUCTURE has 1 registration on MahaRERA, including SURYAKUNJ RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that SURYAKUNJ RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SURYAKUNJ RESIDENCY is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SURYAKUNJ RESIDENCY?

The registered promoter entity is GHUGE INFRASTRUCTURE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SURYAKUNJ RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SURYAKUNJ RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SURYAKUNJ RESIDENCY?

The professionals named in the filing: Architect: SAKHARE ASSOCIATES; Engineer: AKASH PATHRIKAR PATHRIKAR; Chartered Accountant: BANGAD PARJANE AND CO; Chartered Accountant: S. O. MANTRI & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SURYAKUNJ RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SURYAKUNJ RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SURYAKUNJ RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.