Registered No litigation declared Residential / Group Housing project

JABINDA GRANDEUR

By JABINDA REALTY

RG-MH-15984 · RERA P51500051186 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 3.75 crore secured on the land, in favour of State Bank of India
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Staircases, 85%
34 of 75Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

JABINDA GRANDEUR is a Residential / Group Housing project by JABINDA REALTY in Aurangabad, Maharashtra, registered with MahaRERA as P51500051186 on 1 Jun 2023. Possession is promised by 31 Dec 2028. 41 of the 75 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameJABINDA GRANDEUR
  • TypeResidential / Group Housing
  • Location
    • BEED BYPASS
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431010
  • Pincode431010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500051186
  • ReraGenie IDRG-MH-15984

Builder

  • NameJABINDA REALTY
  • Entity typeOthers
  • GSTIN27BDGPJ8948E1Z8
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Named personALBIR SINGH TRILOK SINGH JABINDA
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jun 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

55%41 of 75 units booked
70.0%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA141275075

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 85%.

WING A: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes55%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes40%
Street LightingYes45%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes40%
Open ParkingNoNot applicable

Parking filed117

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots117
Closed/Covered22
Open Space95

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,200 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofState Bank of India
Secured amountRs 3.75 crore
CERSAI search filedYes
Declared on5 Jan 2026

Approvals and building plan

Sanctioning authorityChhatrapati Sambhajinagar Municipal Corporation, Chhatrapati Sambhajinagar
Permissible FSI8802.0
Proposed, not sanctioned3,793 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTOWN HALL NEAR AMC BUILDING CHHATRAPATI SAMBHAJINAGAR
Estimated costRs 17.71 cr
Cost incurredRs 12.40 cr
Work done70.0%
BuildingWingEstimatedIncurred
WING ANARs 17.16 crRs 12.01 cr
-NARs 55.00 lakhRs 38.50 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectImpact design and associates
EngineerHARES SIDDIQUI M
Chartered AccountantC GAS & CO
Chartered AccountantBHALERAO and ASSOCIATES
PartnerRole in project
JABINDA REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Jabinda Grandeur Form-1 March 26.pdf15 May 2026
Withdrawal Update Form 2File: Jabinda Grandeur Form-2 March 26.pdf15 May 2026
Withdrawal Update Form 3File: Grandeur Form-3.pdf15 May 2026
Withdrawal Update Form 1File: Jabinda Grandeur Form-1 March 26.pdf12 May 2026
Withdrawal Update Form 2File: Jabinda Grandeur Form-2 March 26.pdf12 May 2026
Withdrawal Update Form 3File: Grandeur Form-3 Jun-24.pdf12 May 2026
Form 1File: 1 Form-1 Dec 25.pdf3 Jan 2026
Form 2File: 2 Form-2 Dec 25.pdf3 Jan 2026
Form 3File: 3 Form-3 Dec 25.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: 4 Sold Dec 25.pdf3 Jan 2026
Form 1File: 1 Form-1 Sep 2025.pdf17 Nov 2025
Form 2File: 2 Form-2 Sep 2025.pdf17 Nov 2025
Form 3File: 3 Form-3 Sep 2025.pdf17 Nov 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold Sep 2025.pdf17 Nov 2025
Form 1File: 1 Form-1 June 25.pdf13 Aug 2025
Form 2File: 2 Form-2 June 25.pdf13 Aug 2025
Form 3File: 3 Form-3 June 25.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold June 25.pdf13 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form-1 Sep 24.pdf4 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form-1 Dec 24.pdf4 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 Dec Sep 24.pdf4 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form-2 Sep 24.pdf4 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form-2 Dec 24.pdf4 Jan 2025
Disclosure of sold/ booked inventoryFile: 4 Sold Sep 24.pdf4 Jan 2025
Building plan approvalFile: Building Plan 1_Compressed.pdf20 Aug 2024
Building plan approvalFile: Building Plan 2_compressed.pdf20 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1_Compressed.pdf20 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2_compressed.pdf20 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf20 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Grandeur Form-1 Jun-24.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Grandeur Form-2 Jun-24.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Grandeur Sold Jun-24.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Grandeur Form-3 Jun-24.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Grandeur Form-1 Mar 24.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Grandeur Form-2 Mar 24.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Grandeur Form-2A Mar24.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: Grandeur Sold Mar 24.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Grandeur Form-3 Mar 24.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Jabinda Realty Form 1 Sep-23.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Jabinda Realty Form 1 Dec-23.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Jabinda Realty Form 2 Sep-23.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Jabinda Realty Form 2 Dec-23.pdf24 Jan 2024
Building plan approvalFile: LAYOUT_compressed.pdf13 May 2023
Building plan approvalFile: 2 Building Plan Approval Part - II.pdf13 May 2023
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT_compressed.pdf13 May 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval Part - II.pdf13 May 2023
Other - TechnicalFile: Jabinda Grandeur Area Declaration.pdf27 Apr 2023
Other - FinanceFile: Jabinda Grandeur Prop Declaration.pdf27 Mar 2023
Proforma of Agreement for saleFile: Model RERA Draft.pdf7 Mar 2023
CERSAI detailsFile: No Enc CERSAI Declaration.pdf6 Mar 2023
Layout approvalFile: IMG_00001_compressed (2).pdf5 Mar 2023
PAN CardFile: PAN CARD.pdf5 Mar 2023
Copy of the legal title reportFile: Search Reports.pdf5 Mar 2023
Details of encumbrances concerned to FinanceFile: No ENG ( FIN ).pdf5 Mar 2023
Details of encumbrances concerned to FinanceFile: No ENG ( Legal ).pdf5 Mar 2023
Details of encumbrances concerned to LegalFile: No ENG ( FIN ).pdf5 Mar 2023
Details of encumbrances concerned to LegalFile: No ENG ( Legal ).pdf5 Mar 2023
Copy of Layout Approval (in case of layout)File: IMG_00001_compressed (2).pdf5 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf5 Mar 2023
Declaration about Commencement CertificateFile: Format D.pdf5 Mar 2023
Declaration in FORM BFile: Form B.pdf5 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jabinda Grandeur Form 3 20 May 2023_compressed.pdf5 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest Annexure A.pdf5 Mar 2023
Proforma of Allotment letterFile: Modal From Of Allotment Letter_compressed.pdf5 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf5 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation Report ( Allot Letter ).pdf5 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report ( Agree To Sale ).pdf5 Mar 2023

How this compares with Aurangabad

55%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep JABINDA GRANDEUR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BEED BYPASS1,400+ in Aurangabad

2 kmJABINDA GRANDEURCompleted 21Lapsed / revoked 19Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 86 registered projects within 2 km.

Builder: JABINDA REALTY

JABINDA REALTY has 2 registrations on MahaRERA, including JABINDA GRANDEUR and JABINDA GRANDEUR WING B. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if JABINDA GRANDEUR is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JABINDA GRANDEUR?

The registered promoter entity is JABINDA REALTY, an others as per the filing. Its GSTIN 27BDGPJ8948E1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JABINDA GRANDEUR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JABINDA GRANDEUR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JABINDA GRANDEUR?

The professionals named in the filing: Architect: Impact design and associates; Engineer: HARES SIDDIQUI M; Chartered Accountant: C GAS & CO; Chartered Accountant: BHALERAO and ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JABINDA GRANDEUR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JABINDA GRANDEUR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JABINDA GRANDEUR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.