Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: External plumbing and external plaster, 98%
0Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

SURYA EXCELLENCY is a Others project by SURYAKANT MANGALDAS SAMANI AND CHAMPABEN VASANJI MASHRU in Thane, Maharashtra, registered with MahaRERA as P51700015832 on 27 Mar 2018. The registration is recorded completed; possession was promised by 30 Mar 2026.

At a glance

Project

  • NameSURYA EXCELLENCY
  • TypeOthers
  • Location
    • AGRA ROAD
    • NARPOLI
    • Bhiwandi (M Corp.)
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700015832
  • ReraGenie IDRG-MH-90130

Builder

  • NameSURYAKANT MANGALDAS SAMANI AND CHAMPABEN VASANJI MASHRU
  • Entity typeOthers
  • PromotersSURYAJANT MANGALDAS SAMANI SAMANI, champaben vasanji mashru MASHRU

Key dates

this monthRegisteredMar 2018PromisedMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Mar 2018
  • Promised completion30 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed114 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SURYA EXCELLENCYNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 98%.

SURYA EXCELLENCY: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 19 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes70%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes70%
Energy managemcntYes70%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes70%

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Open Space39

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,376 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Sep 2024

Approvals and building plan

Permissible FSI10751.2
Proposed, not sanctioned6,269 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHIWANDI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRK ASSOCIATES
EngineerSHARAVANI CONSULTANT
Chartered AccountantMUKESH S SONI
PartnerRole in project
SURYAKANT MANGALDAS SAMANI AND CHAMPABEN VASANJI MASHRU-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Jun 2025

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 surya.pdf19 Jun 2025
Certificates of CA (Form 3)File: form 3 surya.pdf19 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 surya.pdf19 Jun 2025
Other - LegalFile: form 4 surya.pdf19 Jun 2025
Other - TechnicalFile: form 4 surya.pdf19 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: form 5 surya.pdf19 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for12 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 sept 24 surya.pdf15 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 dec 24 surya.pdf15 Apr 2025
Certificates of CA (Form 3)File: form 3 sept 24 surya_11zon.pdf15 Apr 2025
Certificates of CA (Form 3)File: form 3 dec 24 surya.pdf15 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sept 24 surya.pdf15 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 24 surya.pdf15 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Cert_PO_456108_4428OrucSign.pdf10 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SURYA MARCH 24.pdf15 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SURYA JUNE 24.pdf15 Oct 2024
Certificates of CA (Form 3)File: FORM 3 SURYA - MARCH 24.pdf15 Oct 2024
Certificates of CA (Form 3)File: FORM 3 SURYA JUNE 24.pdf15 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SURYA MARCH 24.pdf15 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SURYA JUNE 24.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SURYA 2024.pdf15 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE OF SUREYA EXCELLENCY.pdf27 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE OF SURYA EXCELLENCY.pdf27 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MARCH 2023.pdf21 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 JUNE 2023.pdf21 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SURYA EXCELLENCY FORM 1 SEPT 2023.pdf21 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MARCH 23.pdf21 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 JUNE 2023.pdf21 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SEPT 2023.pdf21 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A MARCH 2023.pdf21 Dec 2023
Certificates of CA (Form 3)File: SURYA EXCELLENCY FORM 3 31 MARCH 2023_11zon.pdf21 Dec 2023
Certificates of CA (Form 3)File: SURYA EXCELLENCY FORM 3 30JUNE2023_11zon.pdf21 Dec 2023
Certificates of CA (Form 3)File: SURYA EXCELLENCY FORM 3 300923_11zon.pdf21 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SURYA EXCELLENCY FORM 5 2023.pdf21 Dec 2023
PAN CardFile: SURYAKANT PAN.pdf28 Apr 2023
Details of encumbrances concerned to FinanceFile: LEGAL LITIGATION SURYA EXCELLENCY.pdf28 Apr 2023
Details of encumbrances concerned to LegalFile: LEGAL LITIGATION SURYA EXCELLENCY.pdf28 Apr 2023
Declaration about Commencement CertificateFile: FORMAT D SURYA EXCELLENCY.pdf28 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A SURYA 2020.pdf28 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A SURYA 2021.pdf28 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A SURYA 2022.pdf28 Apr 2023
CERSAI detailsFile: CERSAI DECLARATION SURYA EXCELLENCY.pdf28 Apr 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD UNSOLF SURYA EXCELLENCY.pdf28 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST SURYAKANT SAMANI.pdf28 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST CHAMPABEN MASHRU.pdf28 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A SEPARATE BANK ACCOUNT SURYA EXCELLENCY.pdf28 Apr 2023
Deviation Report with respect to Allotment letterFile: DEVIATION SURYA EXCELLENCY ALLOTMENT LETTER.pdf28 Apr 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT SURYA EXCELLENCY.pdf28 Apr 2023
Other - TechnicalFile: surya declaration2132023.pdf21 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Surya Excellency FORM 1_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1_Surya Excellency 31 March 2020_1_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2Surya Excellency 30 Sep 20_2_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3Surya Excellency 31 Mar 2019_3_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4Surya Excellency 09 02 23_4_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5Surya Excellency 20 sep 21_5_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6Surya Excellency 30 Jun 2020_6_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7Surya Excellency 30 Jun2022_7_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8Surya Excellency 30 Sep 2018_8_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9Surya Excellency 30 Sep 2019_9_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10Surya Excellency 30 Sep 2022_10_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11Surya Excellency 30Jun 2018_11_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12Surya Excellency 30Jun 2021_12_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13Surya Excellency 31 12 2021_13_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 14Surya Excellency 31 Dec 2018_14_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 15Surya Excellency 31 Dec 2019_15_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 16Surya Excellency 31 Dec 2020_16_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 17Surya Excellency 31 Dec 2021_17_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 18Surya Excellency 31 Dec 2022_18_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 19Surya Excellency 31 Jun 2019_19_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 20Surya Excellency 31 Mar 2018_20_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 21Surya Excellency 31 Mar 2021_21_11zon.pdf22 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 22Surya Excellency 31 mar 2022_22_11zon.pdf22 Feb 2023
Certificates of CA (Form 3)File: 1SURYA EXCELLENCY CERTIFICATE DECEMBER 2019_1_11zon.pdf22 Feb 2023
Certificates of CA (Form 3)File: 2SURYA EXCELLENCY CERTIFICATE DECEMBER 2020_2_11zon.pdf22 Feb 2023
Certificates of CA (Form 3)File: 3SURYA EXCELLENCY CERTIFICATE DECEMBER 2021_3_11zon.pdf22 Feb 2023
Certificates of CA (Form 3)File: 4SURYA EXCELLENCY CERTIFICATE DECEMBER 2022_4_11zon.pdf22 Feb 2023
Certificates of CA (Form 3)File: 5SURYA EXCELLENCY CERTIFICATE FEBRUARY 2023_5_11zon.pdf22 Feb 2023
Certificates of CA (Form 3)File: 6SURYA EXCELLENCY CERTIFICATE JUNE 2018_6_11zon.pdf22 Feb 2023
Certificates of CA (Form 3)File: 7SURYA EXCELLENCY CERTIFICATE JUNE 2019_7_11zon.pdf22 Feb 2023
Certificates of CA (Form 3)File: 8SURYA EXCELLENCY CERTIFICATE JUNE 2020_8_11zon.pdf22 Feb 2023

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SURYA EXCELLENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NARPOLI7,600+ in Thane

2 kmSURYA EXCELLENCYCompleted 29Lapsed / revoked 24Other 40Dot size: filed unitsN

Filed coordinates, straight-line distance. 93 registered projects within 2 km.

Builder: SURYAKANT MANGALDAS SAMANI AND CHAMPABEN VASANJI MASHRU

SURYAKANT MANGALDAS SAMANI AND CHAMPABEN VASANJI MASHRU has 1 registration on MahaRERA, including SURYA EXCELLENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SURYA EXCELLENCY is delayed beyond 30 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SURYA EXCELLENCY?

The registered promoter entity is SURYAKANT MANGALDAS SAMANI AND CHAMPABEN VASANJI MASHRU, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SURYA EXCELLENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SURYA EXCELLENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SURYA EXCELLENCY?

The professionals named in the filing: Architect: RK ASSOCIATES; Engineer: SHARAVANI CONSULTANT; Chartered Accountant: MUKESH S SONI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SURYA EXCELLENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SURYA EXCELLENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SURYA EXCELLENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.