Home / Browse projects / Mumbai Suburban, Maharashtra / SURVE TOWER

Registered No litigation declared Residential / Group Housing project

SURVE TOWER

By MEENA VIKAS RAIKAR

RG-MH-47478 · RERA P51800014364 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 66 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 66 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
1 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

SURVE TOWER is a Residential / Group Housing project by MEENA VIKAS RAIKAR in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014364 on 27 Nov 2017. Possession is promised by 29 Dec 2026. The completion date has moved by 66 months from the original filing. 24 of the 25 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSURVE TOWER
  • TypeResidential / Group Housing
  • Location
    • Mankhurd Village Road
    • Mankhurd
    • Kurla
    • Mumbai Suburban
    • 400088
  • Pincode400088
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800014364
  • ReraGenie IDRG-MH-47478

Builder

  • NameMEENA VIKAS RAIKAR
  • Entity typeIndividual

Key dates

this monthRegisteredNov 2017First promiseJun 2021Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Nov 2017
  • Promised completion29 Dec 2026
  • Revised completionRevised to 29 Dec 2026 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed135 files

Current status

96%24 of 25 units booked

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SURVE TOWERNA9725025

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SURVE TOWER: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered4
Open Space5

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area564 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI1075.65
Proposed, not sanctioned1,076 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch82-C RAJASHREE BUILDING N G ACHARYA MARG CHEMBUR MUMBAI 400071

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerDeenanath S Yadav
Chartered AccountantBHARAT N DUDANI
Chartered AccountantAmitha V Shetty
PartnerRole in project
MEENA VIKAS RAIKAR-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013070Jun 2021 → Dec 2023

Reason as filed by the promoterImmediately after we commenced the work we received stop work notice from MMRDA informing that the Metro Alignment may be passing through our Plot and asking us to stop the work. Hence the work was stopped from 20/02/18 to 26/10/20. Vide Letter Dt.14/9/20 MMRDA has informed us that Metro Alignment is shifted and allowing us to continue the work.

EXT51800009816Jun 2021 → Jun 2022

Reason as filed by the promoterStop work notice received from MMRDA informing the Metro alignment may be passing through our plot. Hence the work was stopped from 20/02/2018 till 26/10/2020. Vide letter dt.14.09.20 MMRDA has informed us that metro alignment is shifted and now allowed us to continue with the work

EXT51800018053Jun 2021 → Dec 2024

Reason as filed by the promoterImmediately after we had commenced the work, we received Stop Work Notice from MMRDA informing that the Metro Alignment may be passing through our Plot and asking us to stop the work. Hence, the work was stopped from 20/02/2018 till 26/10/2020. Vide Letter dt. 14/09/2020 MMRDA has informed us that Metro Alignment is shifted and allowing us to continue with the work.

EXT51800027491Jun 2021 → Dec 2026

Reason as filed by the promoterI, Mrs. Meena V Raikar, hereby declare the following with respect to the project “Surve Tower” bearing registration number P51800014364 registered under MahaRERA We wish to explain the reasons for the delay in our project and respectfully request an extension for its completion. The construction work for Surve Tower has been successfully completed. We are now in the process of obtaining the necessary No Objection Certificates (NOCs) from the relevant authorities, which are required to apply for the Occupancy Certificate (OC). Given the procedural requirements and approval timelines involved, w

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Nov 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 29 Dec 2026

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf20 Apr 2026
Form 2File: Form 2.pdf20 Apr 2026
Form 3File: Form 3.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventory.pdf20 Apr 2026
Form 1File: Form 1.pdf17 Jan 2026
Form 2File: FORM 2.pdf17 Jan 2026
Form 3File: Form 3.pdf17 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory.pdf17 Jan 2026
Form 1File: Form 1.pdf16 Oct 2025
Form 2File: Form 2.pdf16 Oct 2025
Form 3File: Form 3.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: Form 5.pdf26 Sep 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold inventory.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf30 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
Declaration in FORM BFile: Form B - Surve Tower 500 rs.pdf18 Feb 2025
Details of encumbrances concerned to FinanceFile: List of Complaints.pdf10 Feb 2025
Declaration in FORM BFile: Form B.pdf10 Feb 2025
Certificates of CA (Form 3)File: 18 Certificates of CA (Form 3).pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: Circular 29.pdf10 Feb 2025
CERSAI detailsFile: CERSAI Declaration.pdf10 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Seperate Bank Account.pdf10 Feb 2025
Details of encumbrances concerned to LegalFile: List of Complaints.pdf10 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN Meena V Raikar.pdf10 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured Unsecured finanace Availed for the project.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2025
Certificates of CA (Form 3)File: Form 3.pdf18 Jan 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Regn Certificate.pdf4 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Oct 2024
Certificates of CA (Form 3)File: Form 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineers Certificate.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2024
Certificates of CA (Form 3)File: Form 3_compressed.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2024
Certificates of CA (Form 3)File: Form 3 A.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Jan 2024
Certificates of CA (Form 3)File: Form 3.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A.pdf9 Dec 2023
Declaration in FORM BFile: Form B c.pdf7 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold and booked.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Oct 2023
Certificates of CA (Form 3)File: Form 3.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf26 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2023
Certificates of CA (Form 3)File: Form 3.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf27 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 May 2023
Certificates of CA (Form 3)File: Form 3 n.pdf10 May 2023
Certificates of CA (Form 3)File: Form 3.pdf10 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf6 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2023
Certificates of CA (Form 3)File: Form 3.pdf20 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf17 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf17 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A.pdf17 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf17 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Let Formation of Soc.pdf30 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf11 Oct 2022
Certificates of CA (Form 3)File: Form 3.pdf11 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Jul 2022

How this compares with Mumbai Suburban

96%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 66 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SURVE TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mankhurd6,700+ in Mumbai Suburban

2 kmSURVE TOWERCompleted 20Lapsed / revoked 13Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: MEENA VIKAS RAIKAR

MEENA VIKAS RAIKAR has 1 registration on MahaRERA, including SURVE TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SURVE TOWER is delayed beyond 29 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SURVE TOWER?

The registered promoter entity is MEENA VIKAS RAIKAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SURVE TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SURVE TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SURVE TOWER?

The professionals named in the filing: Engineer: Deenanath S Yadav; Chartered Accountant: BHARAT N DUDANI; Chartered Accountant: Amitha V Shetty. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SURVE TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SURVE TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SURVE TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.