ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SURATWALA MARK PLAZZO - WING B - PHASE 1

Completed No litigation declared Commercial project

SURATWALA MARK PLAZZO - WING B - PHASE 1

By SURATWWALA BUSINESS GROUP LIMITED

RG-MH-26661 · RERA P52100017784 · Last updated on MahaRERA portal: 9 Sep 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • 1 extension taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Installation of Lifts, 95%
1Complaints at MahaRERAon this registration
Jump to the 157 documents Report an error

SURATWALA MARK PLAZZO - WING B - PHASE 1 is a Commercial project by SURATWWALA BUSINESS GROUP LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100017784 on 17 Sep 2018. The registration is recorded completed; possession was promised by 30 Dec 2022. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSURATWALA MARK PLAZZO - WING B - PHASE 1
  • TypeCommercial
  • Location
    • HINJAWADI WAKAD ROAD
    • HINJAWADI
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100017784
  • ReraGenie IDRG-MH-26661

Builder

  • NameSURATWWALA BUSINESS GROUP LIMITED
  • Entity typeCompany
  • CINU45200PN2008PLC131361
  • GSTIN27AALCS5640L1ZU
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsMANOJ DHANSUKHLAL SURATWALA, HEMABEN PANKAJKUMAR SUKHADIA
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2018PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Sep 2018
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed157 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING BNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

WING B: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 9 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes80%
Street LightingYes60%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Under Ground Water TankYes100%

Parking filed131

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots131
Closed/Covered131

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,800 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
ANIKET SUNIL HULAWALEHinjavadi (CT)Pune
AKSHAY SUNIL HULAWALEHinjavadi (CT)Pune
SMT SHARMILA SUNIL HULAWALEHinjavadi (CT)Pune
HANUMANT DAGDOBA HULAWALEHinjavadi (CT)Pune
YUVARAJ DAGDOBA HULAWALEHinjavadi (CT)Pune
MR BALASAHEB DAGADOBA HULAWALE AND OTHERSHinjavadi (CT)Pune
MR RANGANATH DAGADOBA HULAWALE AND OTHERSHinjavadi (CT)Pune

Approvals and building plan

Permissible FSI10899.49
Proposed, not sanctioned9,601 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSURATWWALA BUSINESS GROUP LTD SURATWALA MARK PLAZZO WING B PHASE 1 RERA AC

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDRUSHTIKCON ARCHITECT & CO RELATES BHUSHAN KULKARNI
EngineerSTRUDCOM CONSULTANT PVT LTD MR JAYANT INAMDAR
PartnerRole in project
SURATWWALA BUSINESS GROUP LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100012923Dec 2022 → Dec 2023

Reason as filed by the promoterNON AVAILABILITY OF LABOUR AND CONSTRUCTION MATERIAL DUE TO COVID 19 PANDEMIC.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000228415Balasaheb Dagdoba HulawaleSuratwala Business Group Ltd01/03/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Sep 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Dec 2022

Documents filed157

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 157 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OtherFile: Declaration - Society Formation 26-12-2022.pdf9 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 Dec,2022_compressed.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Engineer Certifiacte Dec 2022_compressed.pdf7 Jul 2023
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY as on December 2022.pdf1 Jul 2023
Certificates of CA (Form 3)File: Form 3 CA Certifcate Dec 2022.pdf1 Jul 2023
Details of encumbrances concerned to FinanceFile: 10012 - INDEX-II.pdf26 Jun 2023
Details of encumbrances concerned to LegalFile: 10012 - INDEX-II.pdf26 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART COMPLETION.pdf27 Dec 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 ,.pdf27 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 30-09-2022.pdf14 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Engineer Certifiacte 30-09-2022.pdf14 Nov 2022
Certificates of CA (Form 3)File: Form 3, CA Certifcate 30-10-2022.pdf14 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PArt Completion Showroom No 6 ot 17.pdf13 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf11 Oct 2022
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY.pdf8 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 CA Certificate for 2021 22.pdf8 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf27 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Engineer Certifiacte.pdf27 Aug 2022
Certificates of CA (Form 3)File: Form 3 CA Certifcate suratwala_compressed.pdf15 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf12 Jul 2022
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY.pdf12 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 .pdf21 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Engineer Certifiacte .pdf21 Apr 2022
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY.pdf9 Apr 2022
Details of encumbrancesFile: HDFC Relese Deed 08-04-2022.pdf8 Apr 2022
Certificates of CA (Form 3)File: SCAN_20220407_184922838_compressed.pdf7 Apr 2022
Details of encumbrancesFile: Anand Rathi Mortgage Deed INDEX - 4696-2022.pdf6 Apr 2022
Layout approvalFile: Layout.pdf5 Apr 2022
Building plan approvalFile: B and A 6th.pdf5 Apr 2022
Building plan approvalFile: B and A 9th.pdf5 Apr 2022
Building plan approvalFile: B and A terrece floor.pdf5 Apr 2022
Building plan approvalFile: B and ALL 1st.pdf5 Apr 2022
Building plan approvalFile: B and ALL mezzanine floor.pdf5 Apr 2022
Building plan approvalFile: B and all .pdf5 Apr 2022
Building plan approvalFile: B and A 2,3,4 th.pdf5 Apr 2022
Building plan approvalFile: B and A 5th.pdf5 Apr 2022
Building plan approvalFile: B and A 7and 8th.pdf5 Apr 2022
Building plan approvalFile: B Parking Layout.pdf5 Apr 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf5 Apr 2022
Building Plan Approval (IOD)File: B and A 6th.pdf5 Apr 2022
Building Plan Approval (IOD)File: B and A 9th.pdf5 Apr 2022
Building Plan Approval (IOD)File: B and A terrece floor.pdf5 Apr 2022
Building Plan Approval (IOD)File: B and ALL 1st.pdf5 Apr 2022
Building Plan Approval (IOD)File: B and ALL mezzanine floor.pdf5 Apr 2022
Building Plan Approval (IOD)File: B and all .pdf5 Apr 2022
Building Plan Approval (IOD)File: B and A 2,3,4 th.pdf5 Apr 2022
Building Plan Approval (IOD)File: B and A 5th.pdf5 Apr 2022
Building Plan Approval (IOD)File: B and A 7and 8th.pdf5 Apr 2022
Building Plan Approval (IOD)File: B Parking Layout.pdf5 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-2022 (1).pdf5 Apr 2022
Proforma of Allotment letterFile: Agreement to Sell Draft 2022 (1).pdf5 Apr 2022
CERSAI detailsFile: CERSAI-Asset_Based_Search - Suratwala.pdf21 Mar 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf25 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineer Certicate.pdf8 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certicate_compressed.pdf13 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31 Dec 21.pdf11 Jan 2022
Certificates of CA (Form 3)File: Form 3 CA Certifcate 31 Dec 2021.pdf11 Jan 2022
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY.pdf7 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2, Engineer Certicate.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A, Engineer Certicate.pdf7 Oct 2021
Certificates of CA (Form 3)File: Form 3, CA Certifcate.pdf7 Oct 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Complition Certificate.pdf4 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - 2020-21.pdf28 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5, CA Certificate 2019-2020.pdf15 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate.pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineer Certicate.pdf14 Aug 2021
Certificates of CA (Form 3)File: Form-3.pdf14 Aug 2021
Declaration about Commencement CertificateFile: Format D - commencement declaration.pdf12 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect 31 march 21.pdf12 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31 dec 20.pdf12 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2, Engineer Certicate,31 march 21.pdf12 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2, Engineer Certicate, 31 Dec 20.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A, Engineer Certicate, 31Dec 20.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A, Engineer Certicate, 31 march 21.pdf12 Aug 2021
Disclosure of sold/ booked inventoryFile: Soldunsold 30 june 21.pdf12 Aug 2021
Certificates of CA (Form 3)File: Form 3, CA Certificate, 31Dec 20.pdf12 Aug 2021
Certificates of CA (Form 3)File: Form 3 CA Certificate, 31march 21.pdf12 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 30-09-2020_compressed.pdf13 Feb 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SURATWALA MARK PLAZZO - PHASE 1HINJEWADI101CompletedJul 2016Jul 2016
SURATWALA SWEET 16BANER16CompletedJun 2010Jun 2010

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SURATWALA MARK PLAZZO - WING B - PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HINJAWADI13,700+ in Pune

2 kmSURATWALA MARK PLAZZO - Completed 105Lapsed / revoked 40Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 215 registered projects within 2 km.

Builder: SURATWWALA BUSINESS GROUP LIMITED

SURATWWALA BUSINESS GROUP LIMITED has 2 registrations on MahaRERA, including SURATWALA MARK PLAZZO - WING B - PHASE 1 and SURATWALA MARK PLAZZO- BUILDING C, D AND E. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SURATWALA MARK PLAZZO - WING B - PHASE 1 is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SURATWALA MARK PLAZZO - WING B - PHASE 1?

The registered promoter entity is SURATWWALA BUSINESS GROUP LIMITED, a company as per the filing. Its CIN U45200PN2008PLC131361 and GSTIN 27AALCS5640L1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SURATWALA MARK PLAZZO - WING B - PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SURATWALA MARK PLAZZO - WING B - PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SURATWALA MARK PLAZZO - WING B - PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SURATWALA MARK PLAZZO - WING B - PHASE 1?

The professionals named in the filing: Architect: DRUSHTIKCON ARCHITECT & CO RELATES BHUSHAN KULKARNI; Engineer: STRUDCOM CONSULTANT PVT LTD MR JAYANT INAMDAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SURATWALA MARK PLAZZO - WING B - PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SURATWALA MARK PLAZZO - WING B - PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SURATWALA MARK PLAZZO - WING B - PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.