Home / Browse projects / Thane, Maharashtra / SURAJ RAMA HEIGHTS

Registration lapsed No litigation declared Residential / Group Housing project

SURAJ RAMA HEIGHTS

By SHREE RAMA SHREE CONSTRUCTION PVT LTD

RG-MH-59723 · RERA P51700007593 · Last updated on MahaRERA portal: 19 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 5 complaints at MahaRERA
  • Completion date moved by 54 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 65%
5Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

SURAJ RAMA HEIGHTS is a Residential / Group Housing project by SHREE RAMA SHREE CONSTRUCTION PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700007593 on 17 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 54 months from the original filing. 5 complaints are on record with the regulator.

At a glance

Project

  • NameSURAJ RAMA HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • CHANDANWADI
    • PANCHPAKHADI
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700007593
  • ReraGenie IDRG-MH-59723

Builder

  • NameSHREE RAMA SHREE CONSTRUCTION PVT LTD
  • Entity typeCompany

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseJun 2021Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SURAJ RAMA HEIGHTSNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 65%.

SURAJ RAMA HEIGHTS: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities16

As on 19 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Solar Water Heating SystemYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,195 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4250.43
Proposed, not sanctioned4,250 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFORT MUMBAI

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
SHREE RAMA SHREE CONSTRUCTION PVT LTD-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700016868Jun 2021 → Dec 2023

Reason as filed by the promoterThe real estate industry went through multiple challenges over the pandemic years with supply chain disruption, labour crisis, and budget crunch showing down growth. We have been grappled with shortage of labour and a demand slump challenges triggered by market volatility. Construction rates have shot up and the market has also witnessed the pressure of inflation. The project site being situated at rural areas, the biggest challenge is to find skilled labour at a mass scale to assist in completion of work at a reasonable pace. Due to unavailability of skilled labour and labour migration issues

EXT51700010361Jun 2021 → Jun 2022

Reason as filed by the promoterWe have been grappled with shortage of labour and a demand slump challenges triggered by the second wave of covid and the resulting lockdown. The past year 2020-21, has been particularly difficult for us i.e. demand for housing collapsed by 80 percent. Migrant construction workers have not yet returned from their village. Unit sales have slowed down in all segments-i.e low, middle and high income groups in our project. Due to stagnancy in sale of apartments for the past year constant restrictions under state of Maharashtra the pace of construction is slow. The biggest challenge is getting skil

EXT51700024965Jun 2021 → Dec 2025

Reason as filed by the promoterDear Sir/Ma’am, I, Mr. Anilkumar Surajnath Singh, hereby declare the following with respect to the project “Suraj Rama Heights” bearing registration number P51700007593 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the full RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and applying for

Litigation declared3

CaseCourtStatus
78 2016/2016SPECIAL CIVIL SHOUTON GOING
OMA534 2015/2015THANE SESSIONS COURTON GOING
OMA671 2015/2015THANE SESSIONS COURTON GOING

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC006000000012533anil agarwalshree rama shree costruction pvt ltd06/02/2018
CC006000000012534Samir agarwalshree rama shree constructions pvt ltd06/02/2018
CC006000000100498Shyamprakash Parasnath Mishra and Mrs Sunita Shyamprakash MishraShree Rama Shree Constructions Private Limited, through its Director/ Authorized Signatory23/08/2019
CC006000000197988Abhay Bhiku Patne and Vinata Abhay PatneAnil Kumar Singh13/09/2021
CC12504177premkumar udhaniSHREE RAMA SHREE CONSTRUCTION PVT LTD25/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form-3 March 2024.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form-3 March 2025.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form-3 December 2024.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form-3 September 2024.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form-3 June 2024.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form-3 December 2023.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form-3 June 2023.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2025.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 September 2023.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form December 2024.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 September 2024.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2024.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 December 2023.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2023.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2024.pdf18 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf18 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN.pdf18 Apr 2025
Details of encumbrances concerned to FinanceFile: Annexure A- Non-Encumbrance related to Financial and Legal.pdf17 Apr 2025
Declaration in FORM BFile: FORM- B (1).pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 2024.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2025.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 September 2024.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2024.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2024.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 2023.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2023.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2023.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 December 2022.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 September 2022.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 March 2022.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2022.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 September 2023.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 24-25- Q3_7_11zon.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 24-25- Q4_8_11zon.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 24-25- Q2_6_11zon.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 24-25- Q1_5_11zon.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 23-24- Q4_4_11zon.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 23-24- Q3_3_11zon.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 23-24- Q2_2_11zon.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: FY 23-24- Q1_1_11zon.pdf17 Apr 2025
Details of encumbrances concerned to LegalFile: Annexure A- Non-Encumbrance related to Financial and Legal.pdf17 Apr 2025
Other - TechnicalFile: CPM Report.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ajay Mahale Certificate 22-23.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ajay Mahale Certificate 23 -24.pdf17 Apr 2025
Certificates of CA (Form 3)File: Form 3 Upload_compressed.pdf8 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf8 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SRH - form 1 (1)_compressed.pdf7 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SRH - Form 2_signed_compressed.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SRH Form - 2A_signed.pdf7 Apr 2023
Certificates of CA (Form 3)File: FORM 3_UPDATED_compressed.pdf7 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200226143123_For_Debtor_Based_Search_18_12_2021_20_29_15_899.pdf18 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 17-18_compressed.pdf13 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18-19_compressed.pdf13 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 19-20_compressed.pdf13 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21_compressed.pdf13 Dec 2021
Declaration about Commencement CertificateFile: Declaration - CC.pdf1 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Self Declaration - 2A.pdf1 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Self Declaration - 2A.pdf1 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold - Unsold_compressed.pdf1 Oct 2021
Layout approvalFile: 1 mb 5 Plan Copy.pdf31 Jul 2017
Building plan approvalFile: img08806-1.pdf31 Jul 2017
PAN CardFile: PAN.pdf31 Jul 2017
Copy of the legal title reportFile: img088081.pdf31 Jul 2017
Details of encumbrancesFile: img088919.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 1 mb 5 Plan Copy.pdf31 Jul 2017
Building Plan Approval (IOD)File: img08806-1.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: img08809.pdf31 Jul 2017
Declaration in FORM BFile: img08898.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: img08811.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: img08805.pdf31 Jul 2017
Certificates of CA (Form 3)File: img08812.pdf31 Jul 2017
Proforma of Allotment letterFile: img08807.pdf31 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 54 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SURAJ RAMA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANCHPAKHADI7,600+ in Thane

2 kmSURAJ RAMA HEIGHTSCompleted 104Lapsed / revoked 74Other 145Dot size: filed unitsN

Filed coordinates, straight-line distance. 323 registered projects within 2 km.

Builder: SHREE RAMA SHREE CONSTRUCTION PVT LTD

SHREE RAMA SHREE CONSTRUCTION PVT LTD has 1 registration on MahaRERA, including SURAJ RAMA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that SURAJ RAMA HEIGHTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SURAJ RAMA HEIGHTS is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SURAJ RAMA HEIGHTS?

The registered promoter entity is SHREE RAMA SHREE CONSTRUCTION PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SURAJ RAMA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SURAJ RAMA HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SURAJ RAMA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SURAJ RAMA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SURAJ RAMA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SURAJ RAMA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.