Home / Browse projects / Pune, Maharashtra / Supurti

Completed No litigation declared Residential / Group Housing project

Supurti

By Creative Developers

RG-MH-16583 · RERA P52100026311 · Last updated on MahaRERA portal: 14 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 9 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Supurti is a Residential / Group Housing project by Creative Developers in Pune, Maharashtra, registered with MahaRERA as P52100026311 on 7 Sep 2020. The registration is recorded completed; possession was promised by 25 Jun 2024. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameSupurti
  • TypeResidential / Group Housing
  • Location
    • SINHGAD ROAD
    • NORTH PARVATI
    • Parvati
    • Haveli
    • Pune
    • 411009
  • Pincode411009
  • RERA no.P52100026311
  • ReraGenie IDRG-MH-16583

Builder

  • NameCreative Developers
  • Entity typePartnership
  • PartnersMilind Yashwant Joshi, Yashwant Ramchandra Joshi
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2020First promiseSep 2023Revised toJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Sep 2020
  • Promised completion25 Jun 2024
  • Revised completionRevised to 25 Jun 2024 (originally 30 Sep 2023)
  • Buildings1 building record
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUPURTINA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SUPURTI: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Open Space4

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,012 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2589.98
Proposed, not sanctioned1,113 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch215, free press house, Free press marg, Nariman Point, Mumbai-400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectD D ASSOCIATES
EngineerARROW DEVELOPMENT
Chartered AccountantHEMANT DAVE AND ASSOCIATES
PartnerRole in project
Creative Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017588Sep 2023 → Mar 2024

Reason as filed by the promoterSir We are in process of taking Fire NOC from respective authority, the same may take time of around 2 month which by end of October 2023, We will get Fire NOC after that I can submit my application to Pune Municipal Corporation for Completion certificate of the project which may took time of another 2-3 month to get completion certificate from Pune Municipal corporation. Your Honor Since I applying for extension of project for a period for not more 1 year . I don't need to submit consent from allottee of the project. Your Honor, you are requested to consider my application of the project exte

EXT52100025236Sep 2023 → Jun 2024

Reason as filed by the promoterYour honor, since our first extended date of completion of the project is 31.03.2024. There are total 35 flats out of which 34 flat are ready to handover/complete as per our first occupancy certificate No. 1329/23 dt.27.03.2024 which within the extended due date of our project i.e. 31.03.2024 and only 1 flat i.e. Flat No 104 get full occupancy vide certificate no.0324/24 dt.25.06.2024 even though the same flat was also ready to complete, but since all building material were kept in Flat No 104 PMC officer could not inspect the flat hence they have asked the builder to wait full occupancy certi

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Jul 2024

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Supurti Completion.pdf14 May 2026
Declaration in FORM BFile: Form B.pdf4 Apr 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf14 Nov 2024
Other - FinanceFile: Declaration for Change in Bank Account.pdf14 Nov 2024
Other - FinanceFile: Annexure A.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ September 2024.pdf19 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 24.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 September 2024.pdf19 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Updated CC.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: FORMAT OF DISCLOSURE OF SOLD BOOKED INVENTORY April-June 2024.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Supurti _ FY 23-24.pdf19 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Suprti Final Completion.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Supurti April-June2024.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 April-June2024.pdf4 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2 April-June2024.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: Format of Disclosure of Sold Booked Inventory April-June2024.pdf4 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_June 24.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan-Mar2024.pdf3 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan-Mar2024.pdf3 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A Jan-Mar2024.pdf3 Apr 2024
Disclosure of sold/ booked inventoryFile: Format of Disclosure of Sold Jan-Mar2024.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan-Mar 2024.pdf3 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Supurti Completion Certificate ( Part 1 ).pdf30 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct-Dec2023.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Oct- Dec2023.pdf6 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Oct-Dec2023.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: Format of Disclosure of Sold Booked Inventory Oct-Dec2023.pdf6 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 23.PDF6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Supurti July-Sept2023.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July-Sept2023.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: FORMAT OF DISCLOSURE OF SOLD BOOKED INVENTORY July-Sept 2023.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Supurti Form 5.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_FY22-23_Q4.pdf7 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q1_FY23-24.pdf7 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_FY22-23_Q4.pdf7 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q2_FY23-24.pdf7 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY22-23_Q4.pdf7 Sep 2023
Disclosure of sold/ booked inventoryFile: FORMAT OF DISCLOSURE OF SOLD BOOKED INVENTORY Jan- Mar2023.pdf7 Sep 2023
Disclosure of sold/ booked inventoryFile: FORMAT OF DISCLOSURE OF SOLD BOOKED INVENTORY April-June2023.pdf7 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_FY22-23_Q4.PDF7 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_FY23-24_Q4.PDF7 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Supurti.pdf26 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Certificate Oct-Dec.pdf26 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Oct-Dec.pdf26 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Oct-Dec.PDF26 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf1 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf1 Dec 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf1 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.PDF1 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.PDF1 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Declaration of Bank Account.pdf11 Nov 2022
Details of encumbrancesFile: Encumbrance Letter.pdf7 Nov 2022
Details of encumbrancesFile: Encumbrance Letter.pdf7 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2A.pdf13 Aug 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf13 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.PDF13 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 2_compressed.pdf4 Apr 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold - booked inventory.pdf4 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (1).pdf4 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2_compressed.pdf10 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2A_compressed.pdf10 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf10 Jan 2022
Disclosure of sold/ booked inventoryFile: Disclocure of Inventory.pdf10 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From-3_compressed.pdf10 Jan 2022
Declaration about Commencement CertificateFile: Format D.PDF22 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf22 Dec 2021
CERSAI detailsFile: CERASAI Report Supurti.pdf22 Dec 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold -Booked Inventory.PDF16 Nov 2021
OtherFile: Format C_compressed.pdf16 Nov 2021
Layout approvalFile: Copy of Sanction Plan_Revised_compressed.pdf14 Oct 2021
Building plan approvalFile: Copy of Sanction Plan_Revised_compressed.pdf14 Oct 2021
Details of encumbrancesFile: Encumbrance Letter.pdf14 Oct 2021
Copy of Layout Approval (in case of layout)File: Copy of Sanction Plan_Revised_compressed.pdf14 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Copy of Sanction Plan_Revised_compressed.pdf14 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf14 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf14 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5.pdf14 Oct 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 9 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Supurti on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NORTH PARVATI13,700+ in Pune

Builder: Creative Developers

Creative Developers has 2 registrations on MahaRERA, including Supurti and Anagha Ankur. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Supurti is delayed beyond 25 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Supurti?

The registered promoter entity is Creative Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Supurti?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Supurti?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Supurti?

The professionals named in the filing: Architect: D D ASSOCIATES; Engineer: ARROW DEVELOPMENT; Chartered Accountant: HEMANT DAVE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Supurti?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Supurti. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Supurti to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.