Supurti
RG-MH-16583 · RERA P52100026311 · Last updated on MahaRERA portal: 14 May 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 9 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Supurti is a Residential / Group Housing project by Creative Developers in Pune, Maharashtra, registered with MahaRERA as P52100026311 on 7 Sep 2020. The registration is recorded completed; possession was promised by 25 Jun 2024. The completion date has moved by 9 months from the original filing.
At a glance
Project
- NameSupurti
- TypeResidential / Group Housing
- Location
- SINHGAD ROAD
- NORTH PARVATI
- Parvati
- Haveli
- Pune
- 411009
- Pincode411009
- RERA no.P52100026311
- ReraGenie IDRG-MH-16583
Builder
- NameCreative Developers
- Entity typePartnership
- PartnersMilind Yashwant Joshi, Yashwant Ramchandra Joshi
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on7 Sep 2020
- Promised completion25 Jun 2024
- Revised completionRevised to 25 Jun 2024 (originally 30 Sep 2023)
- Buildings1 building record
- Documents filed91 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SUPURTI | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SUPURTI: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 14 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed4
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | D D ASSOCIATES |
| Engineer | ARROW DEVELOPMENT |
| Chartered Accountant | HEMANT DAVE AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| Creative Developers | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSir We are in process of taking Fire NOC from respective authority, the same may take time of around 2 month which by end of October 2023, We will get Fire NOC after that I can submit my application to Pune Municipal Corporation for Completion certificate of the project which may took time of another 2-3 month to get completion certificate from Pune Municipal corporation. Your Honor Since I applying for extension of project for a period for not more 1 year . I don't need to submit consent from allottee of the project. Your Honor, you are requested to consider my application of the project exte
Reason as filed by the promoterYour honor, since our first extended date of completion of the project is 31.03.2024. There are total 35 flats out of which 34 flat are ready to handover/complete as per our first occupancy certificate No. 1329/23 dt.27.03.2024 which within the extended due date of our project i.e. 31.03.2024 and only 1 flat i.e. Flat No 104 get full occupancy vide certificate no.0324/24 dt.25.06.2024 even though the same flat was also ready to complete, but since all building material were kept in Flat No 104 PMC officer could not inspect the flat hence they have asked the builder to wait full occupancy certi
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Sep 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Oct 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 Jul 2024
Documents filed91
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Supurti Completion.pdf | 14 May 2026 |
| Declaration in FORM BFile: Form B.pdf | 4 Apr 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 14 Nov 2024 |
| Other - FinanceFile: Declaration for Change in Bank Account.pdf | 14 Nov 2024 |
| Other - FinanceFile: Annexure A.pdf | 14 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ September 2024.pdf | 19 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 24.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 September 2024.pdf | 19 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Updated CC.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: FORMAT OF DISCLOSURE OF SOLD BOOKED INVENTORY April-June 2024.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Supurti _ FY 23-24.pdf | 19 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Suprti Final Completion.pdf | 8 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Supurti April-June2024.pdf | 4 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 April-June2024.pdf | 4 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2 April-June2024.pdf | 4 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Format of Disclosure of Sold Booked Inventory April-June2024.pdf | 4 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_June 24.pdf | 4 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan-Mar2024.pdf | 3 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan-Mar2024.pdf | 3 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A Jan-Mar2024.pdf | 3 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Format of Disclosure of Sold Jan-Mar2024.pdf | 3 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan-Mar 2024.pdf | 3 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Supurti Completion Certificate ( Part 1 ).pdf | 30 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct-Dec2023.pdf | 6 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Oct- Dec2023.pdf | 6 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Oct-Dec2023.pdf | 6 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Format of Disclosure of Sold Booked Inventory Oct-Dec2023.pdf | 6 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 23.PDF | 6 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Supurti July-Sept2023.pdf | 12 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July-Sept2023.pdf | 12 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: FORMAT OF DISCLOSURE OF SOLD BOOKED INVENTORY July-Sept 2023.pdf | 12 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 12 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Supurti Form 5.pdf | 12 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_FY22-23_Q4.pdf | 7 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q1_FY23-24.pdf | 7 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_FY22-23_Q4.pdf | 7 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q2_FY23-24.pdf | 7 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY22-23_Q4.pdf | 7 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: FORMAT OF DISCLOSURE OF SOLD BOOKED INVENTORY Jan- Mar2023.pdf | 7 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: FORMAT OF DISCLOSURE OF SOLD BOOKED INVENTORY April-June2023.pdf | 7 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_FY22-23_Q4.PDF | 7 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_FY23-24_Q4.PDF | 7 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Supurti.pdf | 26 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Certificate Oct-Dec.pdf | 26 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Oct-Dec.pdf | 26 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Oct-Dec.PDF | 26 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 1 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 1 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 1 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.PDF | 1 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.PDF | 1 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Declaration of Bank Account.pdf | 11 Nov 2022 |
| Details of encumbrancesFile: Encumbrance Letter.pdf | 7 Nov 2022 |
| Details of encumbrancesFile: Encumbrance Letter.pdf | 7 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 13 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2A.pdf | 13 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf | 13 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.PDF | 13 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 2_compressed.pdf | 4 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold - booked inventory.pdf | 4 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed (1).pdf | 4 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2_compressed.pdf | 10 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2A_compressed.pdf | 10 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf | 10 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Disclocure of Inventory.pdf | 10 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From-3_compressed.pdf | 10 Jan 2022 |
| Declaration about Commencement CertificateFile: Format D.PDF | 22 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 22 Dec 2021 |
| CERSAI detailsFile: CERASAI Report Supurti.pdf | 22 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold -Booked Inventory.PDF | 16 Nov 2021 |
| OtherFile: Format C_compressed.pdf | 16 Nov 2021 |
| Layout approvalFile: Copy of Sanction Plan_Revised_compressed.pdf | 14 Oct 2021 |
| Building plan approvalFile: Copy of Sanction Plan_Revised_compressed.pdf | 14 Oct 2021 |
| Details of encumbrancesFile: Encumbrance Letter.pdf | 14 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: Copy of Sanction Plan_Revised_compressed.pdf | 14 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Copy of Sanction Plan_Revised_compressed.pdf | 14 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf | 14 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 14 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5.pdf | 14 Oct 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 91 filed documents as one ZIP, foldered, with a manifest
Keep Supurti on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NORTH PARVATI13,700+ in Pune
Sai Towers
CITY ETHERNAL LLP
ARCO SKYLIFE
ARCO ENGINEERS
Shrirang Park
NBC PROJECTS
NYATI EMBLEM
NYATI CONSTRUCTION PRIVATE LIMITED
SHALIMAR
SONIGARA VENTURES
SUMEDHA
SHREE RAM BUILDERS & PROMOTERS
Builder: Creative Developers
Creative Developers has 2 registrations on MahaRERA, including Supurti and Anagha Ankur. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Supurti is delayed beyond 25 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Supurti?
The registered promoter entity is Creative Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Supurti?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Supurti?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Supurti?
The professionals named in the filing: Architect: D D ASSOCIATES; Engineer: ARROW DEVELOPMENT; Chartered Accountant: HEMANT DAVE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Supurti?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback