SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA
RG-MH-17746 · RERA P51800055478 · Last updated on MahaRERA portal: 20 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA is a Residential / Group Housing project by PIONEER HOUSING in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055478 on 2 Apr 2024. Possession is promised by 31 Dec 2030. 213 of the 291 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA
- TypeResidential / Group Housing
- Location
- Goregaon Mulund Link Road
- Mulund East
- Nahur
- Kurla
- Mumbai Suburban
- 400081
- Pincode400081
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800055478
- ReraGenie IDRG-MH-17746
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Apr 2024
- Promised completion31 Dec 2030
- Revised completionNone
- Buildings1 building record
- Documents filed56 files
Current status
Figures as on 20 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA | NA | 29 | 1 | 291 | 0 | 291 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 4%.
SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA: 37% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 4% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed2091
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Crescent Builders | Chembur | Mumbai Suburban |
| JANARDHAN PATIL AND OTHERS (AS PER LIST ANNEXED) | Kalyan | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA | NA | Rs 429.11 cr | Rs 65.77 cr |
| - | NA | Rs 37.31 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | vastuvikalp |
| Architect | VINOD GAIKWAD |
| Engineer | HASMUKH |
| Chartered Accountant | A D sheth& associates |
| Chartered Accountant | SANKET |
| Partner | Role in project |
|---|---|
| PIONEER HOUSING | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 3051/2011 | HIGH COURT BOMBAY | PENDING |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12503018 | AJAY RAJKUMAR SINGH | PIONEER HOUSING | 26/08/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Solana Arct Cert 31 03 26.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Solana Eng Cert 31 03 26.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Solana CA Cert 31 03 26_11zon.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Solana Arct Cert.pdf | 5 Mar 2026 |
| Withdrawal Update Form 2File: Solana Eng. certi..pdf | 5 Mar 2026 |
| Withdrawal Update Form 3File: solana CA Certi_11zon.pdf | 5 Mar 2026 |
| Withdrawal Update Form 1File: Form I 30 09 25 SOLANA.pdf | 16 Dec 2025 |
| Withdrawal Update Form 2File: Form II 30 09 25 SOLANA.pdf | 16 Dec 2025 |
| Withdrawal Update Form 3File: Form III 30 09 25 SOLANA new_11zon.pdf | 16 Dec 2025 |
| Withdrawal Update Form 1File: Form I 30 06 25 SOLANA.pdf | 12 Dec 2025 |
| Withdrawal Update Form 2File: Form II 30 06 25 SOLANA.pdf | 12 Dec 2025 |
| Withdrawal Update Form 3File: Form III 30 06 25 SOLANA new_11zon.pdf | 12 Dec 2025 |
| Form 1File: form 1.pdf | 9 Jun 2025 |
| Form 2File: form 2.pdf | 9 Jun 2025 |
| Form 3File: form 3.pdf | 9 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: disclosure senrof phase IV.pdf | 9 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Declarationsenrof phase IV.pdf | 9 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CERTIFICATE-1-3.pdf | 12 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CERTIFICATE-4-5.pdf | 12 May 2025 |
| Declaration about Commencement CertificateFile: Updated CC_Salona.pdf | 27 Jan 2025 |
| Layout approvalFile: 1 - 2.pdf | 29 Mar 2024 |
| Layout approvalFile: 3 - 5.pdf | 29 Mar 2024 |
| Layout approvalFile: 6 - 8.pdf | 29 Mar 2024 |
| Layout approvalFile: 9 - 12.pdf | 29 Mar 2024 |
| Layout approvalFile: 13 - 15.pdf | 29 Mar 2024 |
| Layout approvalFile: 16 - 19.pdf | 29 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: 1 - 2.pdf | 29 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: 3 - 5.pdf | 29 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: 6 - 8.pdf | 29 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: 9 - 12.pdf | 29 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: 13 - 15.pdf | 29 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: 16 - 19.pdf | 29 Mar 2024 |
| Other - TechnicalFile: fsi t4 rera document.pdf | 29 Mar 2024 |
| Other - LegalFile: rts order copy.pdf | 14 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: 20240222152756.pdf | 7 Mar 2024 |
| Details of encumbrances concerned to LegalFile: 20240222152756.pdf | 7 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA phase 4 copy.pdf | 23 Feb 2024 |
| Other - TechnicalFile: Plans 1 highlighted.pdf | 23 Feb 2024 |
| Other - TechnicalFile: Plans 16 highlighted.pdf | 23 Feb 2024 |
| Other - TechnicalFile: solana rera.pdf | 20 Feb 2024 |
| Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 17 Feb 2024 |
| PAN CardFile: 1 PAN Card.pdf | 17 Feb 2024 |
| Copy of the legal title reportFile: title cert nahur 170224.pdf | 17 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf | 17 Feb 2024 |
| Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf | 17 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf | 17 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf | 17 Feb 2024 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf | 17 Feb 2024 |
| Declaration in FORM BFile: 1 Declaration in FORM B.pdf | 17 Feb 2024 |
| CERSAI detailsFile: 1 CERSAI details.pdf | 17 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANnexure A DOI.pdf | 17 Feb 2024 |
| Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf | 17 Feb 2024 |
| Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf | 17 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: phase 4 bank account letter.pdf | 17 Feb 2024 |
| Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf | 17 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf | 17 Feb 2024 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SENROOFS PHASE II | SENROOFS MILE OFF GOREGAN-MULUND LINK ROAD NAHUR EAST 400081 | 512 | Completed | Dec 2018 | Dec 2018 |
| SPIRO TOWER | MULUND EAST | 17 | Completed | Dec 2014 | Late, Apr 2016 |
| SENROOFS - SANCTURA | SENROOFS GOREGAON MULUND LINK ROAD NAHUR EAST 400081 | 344 | Completed | Dec 2014 | Late, Jan 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SENROOFS PHASE IV, BUILDING NO D1, WING A KN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mulund East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 308 registered projects within 2 km.
Ekvira and Saishakti
Magnaacasa Infrastructures and Realtors Pr
SENROOFS PHASE - III
PIONEER HOUSING
THE ALTEZZA
M/s. VIPL Varasiddhi Infra Project LLP
SUPREMO PHASE I SALVIA D WING
K V BUILDHOME LLP
SUPREMO PHASE II, WING C known as SAKURA
K V BUILDHOME LLP
Aveza Phase 2
Tata Housing Development Company Limited
See every Mumbai Suburban project, with the district possession charts
Builder: PIONEER HOUSING
PIONEER HOUSING has 4 registrations on MahaRERA, including SENROOFS PHASE - II and SENROOFS PHASE - III. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA?
The registered promoter entity is PIONEER HOUSING, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA?
The professionals named in the filing: Architect: vastuvikalp; Architect: VINOD GAIKWAD; Engineer: HASMUKH; Chartered Accountant: A D sheth& associates; Chartered Accountant: SANKET. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.