Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2029Possession promisedmoved 4 months from the original
2 of 10Construction stages donefurthest along: Slabs of Super Structure, 57%
0 of 89Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 41 documents Report an error

Supreme Boulevard Chembur Wing B is a Residential / Group Housing project by SUPREME SKY HIGH PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as PR1180002400026 on 3 Oct 2024. Possession is promised by 31 Jul 2029. The completion date has moved by 4 months from the original filing. 89 of the 89 units on this registration are recorded sold or booked, and 2 of 10 construction stages are filed complete.

At a glance

Project

  • NameSupreme Boulevard Chembur Wing B
  • TypeResidential / Group Housing
  • Location
    • Govandi Station Road
    • Deonar
    • Kurla
    • Mumbai Suburban
    • 400088
  • Pincode400088
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1180002400026
  • ReraGenie IDRG-MH-18639

Builder

  • NameSUPREME SKY HIGH PRIVATE LIMITED
  • Entity typeCompany
  • CINU68100MH2026PTC472103
  • Designated PartersSunny Bijlani, Vishal Jumani
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2024First promiseMar 2029Revised toJul 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Oct 2024
  • Promised completion31 Jul 2029
  • Revised completionRevised to 31 Jul 2029 (originally 31 Mar 2029)
  • Buildings1 building record
  • Documents filed41 files

Current status

100%89 of 89 units booked
25.6%Work done, per cost certificate

Figures as on 1 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No. 1Wing B111189089

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 10 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 57%.

Building No. 1 · wing Wing B: 27% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure57%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed308

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots308
Closed/Covered308

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area19,865 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Oct 2025
LandownerVillageDistrict
Atia Estates Private LimitedDeonarMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI20000.0
Proposed, not sanctioned5,516 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS ANA BUILDINGLINKING ROADSANTACRUZ W MUMBAI MAHARASHTRA 400054
Estimated costRs 196.65 cr
Cost incurredRs 50.40 cr
Work done25.63%
BuildingWingEstimatedIncurred
Building No. 1Wing BRs 131.02 crRs 34.77 cr
-NARs 65.63 crRs 15.63 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManali Nabar
EngineerKannan Rajendren
EngineerPANKAJ MHATRE
EngineerVILAS Kumbhar
Chartered AccountantJignesh Shah
Chartered AccountantJasjit Narang
PartnerRole in project
SUPREME SKY HIGH PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR1180002400026/WarMar 2029 → Jul 2029

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Oct 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2029

Documents filed41

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA Form 1_ Architect_B Wing_Aug-26.pdf1 Sep 2026
Withdrawal Update Form 2File: RERA Form 2_Engineer_B Wing_Aug-26.pdf1 Sep 2026
Withdrawal Update Form 3File: RERA Form 3_CA_B Wing_Aug-26.pdf1 Sep 2026
Withdrawal Update Form 1File: Boulevard B Wing Form 1 Architech Q1_Jun26 FY 26-27.pdf24 Aug 2026
Withdrawal Update Form 2File: Boulevard B Wing Form 2 Engineer Q1_Jun26 FY 26-27.pdf24 Aug 2026
Withdrawal Update Form 3File: Form 3_Wing B_RERA_ 34 flr_Q1_Jun26_FY26-27DSC.pdf24 Aug 2026
Form 2A (FY 2024-2025)File: Supreme Boulevard B wing Form 2A.pdf22 Aug 2026
Form 2A (FY 2025-2026)File: RERA Form2A Boulevard Wing B FY 25-26.pdf22 Aug 2026
Withdrawal Update Form 1File: Boulevard B-Form 1 Architech Q3 FY 25-26.pdf21 Jul 2026
Withdrawal Update Form 2File: Boulevard B Wing Form 2_Engineer Cert_Q4_25-26.pdf21 Jul 2026
Withdrawal Update Form 3File: Boulevard B Wing_Form 3_CA_Q4_25-26_11zon.pdf21 Jul 2026
Form 5 (FY 2025-2026)File: Form5 Supreme Boulevard B Wing Fy 25 26.pdf10 Jun 2026
Withdrawal Update Form 1File: Boulevard B Wing Form 1 Architech Q4 FY 25-26.pdf21 May 2026
Withdrawal Update Form 2File: Boulevard B Wing Form 2_Engineer Cert_Q4_25-26.pdf21 May 2026
Withdrawal Update Form 3File: Boulevard B Wing_Form 3_CA_Q4_25-26_11zon.pdf21 May 2026
Withdrawal Update Form 1File: form 1 (architect certificate)_Certificate for completion_(oct 25 to dec25)_digital signed15 May 2026
Withdrawal Update Form 2File: Boulevard B-Form 2 Engineer Q3 FY 25-26.pdf15 May 2026
Withdrawal Update Form 3File: Boulvard B Form 3 CA Q3 FY 25-26_11zon.pdf15 May 2026
Withdrawal Update Form 1File: form 1.pdf29 Dec 2025
Withdrawal Update Form 2File: form 2.pdf29 Dec 2025
Withdrawal Update Form 3File: form 3 (2).pdf29 Dec 2025
Building plan approvalFile: 20250106 Amended Plan Approval Letter.pdf15 Oct 2025
Layout approvalFile: 20250106 Amended Plan Approval Plan 1-7.pdf15 Oct 2025
Layout approvalFile: 20250106 Amended Plan Approval Plan 8-12.pdf15 Oct 2025
Layout approvalFile: 20250106 Amended Plan Approval Plan 13-16.pdf15 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Supreme Boulevard B.pdf30 Sep 2025
Form 1File: Form 1 Wing B.pdf19 Jul 2025
Form 2File: Form 2 Wing B.pdf19 Jul 2025
Form 3File: Form 3 - Wing B (with Disclosure).pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3 - Wing B (with Disclosure).pdf19 Jul 2025
Building plan approvalFile: IOD Plans-2.pdf11 Sep 2024
Layout approvalFile: IOD.pdf3 Sep 2024
Building plan approvalFile: IOD Plans-1.pdf3 Sep 2024
Building plan approvalFile: IOD Plans-2.pdf3 Sep 2024
Building plan approvalFile: IOD Plans-3.pdf3 Sep 2024
Building plan approvalFile: IOD Plans-4.pdf3 Sep 2024
Building plan approvalFile: IOD Plans-5.pdf3 Sep 2024
Building plan approvalFile: IOD Plans-6.pdf3 Sep 2024
Building plan approvalFile: IOD Plans-7.pdf3 Sep 2024
Building plan approvalFile: IOD Plans-9.pdf3 Sep 2024
Building plan approvalFile: IOD Plans-10.pdf3 Sep 2024

How this compares with Mumbai Suburban

100%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Supreme Boulevard Chembur Wing B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Deonar6,700+ in Mumbai Suburban

2 kmSupreme Boulevard ChembuCompleted 76Lapsed / revoked 52Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 173 registered projects within 2 km.

Builder: SUPREME SKY HIGH PRIVATE LIMITED

SUPREME SKY HIGH PRIVATE LIMITED has 2 registrations on MahaRERA, including Supreme Boulevard Chembur Wing B and Supreme Boulevard Chembur Wing A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Supreme Boulevard Chembur Wing B is delayed beyond 31 Jul 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Supreme Boulevard Chembur Wing B?

The registered promoter entity is SUPREME SKY HIGH PRIVATE LIMITED, a company as per the filing. Its CIN U68100MH2026PTC472103 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Supreme Boulevard Chembur Wing B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Supreme Boulevard Chembur Wing B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Supreme Boulevard Chembur Wing B?

The professionals named in the filing: Architect: Manali Nabar; Engineer: Kannan Rajendren; Engineer: PANKAJ MHATRE; Engineer: VILAS Kumbhar; Chartered Accountant: Jignesh Shah; Chartered Accountant: Jasjit Narang. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Supreme Boulevard Chembur Wing B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Supreme Boulevard Chembur Wing B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Supreme Boulevard Chembur Wing B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.