Home / Browse projects / Mumbai Suburban, Maharashtra / Suparshwa Trinity

Completed No litigation declared Residential / Group Housing project

Suparshwa Trinity

By Suparshwa Developers

RG-MH-05462 · RERA P51800051513 · Last updated on MahaRERA portal: 24 Oct 2025

Source: official MahaRERA filing

Red flags

  • Rs 30.00 crore secured on the land, in favour of AU Small Finance Bank Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Stilt Floor, 0%
5 of 61Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

Suparshwa Trinity is a Residential / Group Housing project by Suparshwa Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051513 on 23 Jun 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 56 of the 61 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSuparshwa Trinity
  • TypeResidential / Group Housing
  • Location
    • Nehru Road
    • Vile Parle (E)
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800051513
  • ReraGenie IDRG-MH-05462

Builder

  • NameSuparshwa Developers
  • Entity typePartnership
  • PartnersPrithviraj Sanghvi, Ashok Jain

Key dates

this monthRegisteredJun 2023PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Current status

92%56 of 61 units booked
78.5%Work done, per cost certificate

Figures as on 24 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Suparshwa TrinityNA111161061

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

Suparshwa Trinity: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered42

Land and ownership5

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,811 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared present
Charge in favour ofAU Small Finance Bank Limited
Secured amountRs 30.00 crore
CERSAI search filedYes
Declared on24 Jul 2025
LandownerVillageDistrict
Anand Pakhde & OrsVileparleMumbai Suburban
The Safalaya Vile-Parle CHSLVileparleMumbai Suburban
Vireshwar Prakash CHSLVileparleMumbai Suburban
Madhvi Khanolkar, Seema Prabhu, Kalpana NerukarVileparleMumbai Suburban
Chirag PakhadeVileparleMumbai Suburban

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI5850.89
Proposed, not sanctioned5,851 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBKC Annex, Mumbai 400070
Estimated costRs 28.10 cr
Cost incurredRs 22.07 cr
Work done78.53%
BuildingWingEstimatedIncurred
Suparshwa TrinityNARs 28.10 crRs 22.07 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectH M JHAVERI AND SONS
EngineerSUHAIL SIDDIQUE
Chartered AccountantKAGRANA AND ASSOCIATES
PartnerRole in project
Suparshwa Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Architect Certificate.pdf24 Oct 2025
Withdrawal Update Form 1File: Form 1 - Architect Certificate.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2 - Engineers Certificate.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2 - Engineers Certificate.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 3 - CA Certificate_compressed.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 3 - CA Certificate_compressed.pdf24 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf24 Oct 2025
Form 2A (FY 2023-2024)File: Form 2A (1).pdf24 Oct 2025
Form 2A (FY 2025-2026)File: Form 2A (2).pdf24 Oct 2025
Form 5 (FY 2024-2025)File: Form 5.pdf24 Oct 2025
Form 5 (FY 2023-2024)File: Form 5 (1).pdf24 Oct 2025
Occupational CertificateFile: 2488518_OC_signed.pdf24 Oct 2025
Occupational CertificateFile: ARCHITECT RERA CERTIFICATE form 4.pdf24 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 Architect Certificate_mar 25.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate_MAR 25_compressed.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate_MAR 25.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_dec 24.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_dec 24.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_dec 24.pdf10 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Full CC.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 24.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 24_compressed.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Sep 24.pdf14 Nov 2024
Layout approvalFile: Amended IOD Plans-2_organized.pdf1 Jul 2024
Copy of Layout Approval (in case of layout)File: Amended IOD Plans-2_organized.pdf1 Jul 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Change - Format A_15_compressed.pdf15 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration-Cum- Undertaking_15_compressed.pdf15 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Change of Designated Bank_15.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf21 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate.pdf21 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate_compressed.pdf21 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Cum Undertaking_new.pdf18 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Change Of Designated Bank Account Letter_new.pdf18 Apr 2024
Proforma of Agreement for saleFile: Agreement for Sale - Suparshwa Trinity (Draft) AU.pdf17 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC revalidation up to 08022025.pdf27 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Change Of Designated Bank Account.pdf27 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Annexure A.pdf27 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration.pdf27 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrance On Project.pdf14 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrance On Project.pdf14 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: further CC.pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Feb 2024
Building plan approvalFile: Amended IOD.pdf15 Dec 2023
Layout approvalFile: APPROVED PLAN.pdf15 Dec 2023
Copy of Layout Approval (in case of layout)File: APPROVED PLAN.pdf15 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD.pdf15 Dec 2023
Proforma of Agreement for saleFile: AFS Suparshwa Trinity1.pdf1 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate_compressed.pdf23 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: further CC.pdf11 Oct 2023
Proforma of Agreement for saleFile: AFS -Suparshwa Trinity_new.pdf2 Jun 2023
Copy of the legal title reportFile: Suparshwa Trinity - Title Certificate (Revised).pdf22 May 2023
Details of encumbrances concerned to FinanceFile: Financial Encumbrances.pdf22 May 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf22 May 2023
Details of encumbrances concerned to LegalFile: Financial Encumbrances.pdf22 May 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf22 May 2023
CERSAI detailsFile: Cersai Declaration.pdf22 May 2023
Proforma of Allotment letterFile: Allotment Letter - Suparshwa Trinity.pdf4 May 2023
Layout approvalFile: IOD NEW_compressed-1.pdf28 Apr 2023
Layout approvalFile: IOD NEW_compressed-2.pdf28 Apr 2023
Layout approvalFile: IOD NEW_compressed-3.pdf28 Apr 2023
Layout approvalFile: IOD NEW_compressed-4.pdf28 Apr 2023
Layout approvalFile: IOD NEW_compressed-5.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: IOD NEW_compressed-1.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: IOD NEW_compressed-2.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: IOD NEW_compressed-3.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: IOD NEW_compressed-4.pdf28 Apr 2023
Copy of Layout Approval (in case of layout)File: IOD NEW_compressed-5.pdf28 Apr 2023
Building plan approvalFile: IOD.pdf17 Apr 2023
PAN CardFile: PAN Card - Suparshwa Developers.pdf17 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf17 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Amended.pdf17 Apr 2023
Declaration about Commencement CertificateFile: Declaration CC_Format-D.pdf17 Apr 2023
Declaration in FORM BFile: Affidavit Cum Declaration for RERA (1).pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_REVISED_compressed.pdf17 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_merged.pdf17 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Details.pdf17 Apr 2023

How this compares with Mumbai Suburban

92%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Suparshwa Trinity on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vile Parle (E)6,700+ in Mumbai Suburban

2 kmSuparshwa TrinityCompleted 143Lapsed / revoked 79Other 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 363 registered projects within 2 km.

Builder: Suparshwa Developers

Suparshwa Developers has 1 registration on MahaRERA, including Suparshwa Trinity. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Suparshwa Trinity is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Suparshwa Trinity?

The registered promoter entity is Suparshwa Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Suparshwa Trinity?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Suparshwa Trinity?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Suparshwa Trinity?

The professionals named in the filing: Architect: H M JHAVERI AND SONS; Engineer: SUHAIL SIDDIQUE; Chartered Accountant: KAGRANA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Suparshwa Trinity?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Suparshwa Trinity. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Suparshwa Trinity to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.