Home / Browse projects / Thane, Maharashtra / Sunteck Times Square

Registered Litigation declared Commercial project

Sunteck Times Square

By Sunteck Lifespace Private Limited

RG-MH-05281 · RERA P51700051191 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 7 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
27 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

Sunteck Times Square is a Commercial project by Sunteck Lifespace Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700051191 on 1 Jun 2023. Possession is promised by 31 Dec 2027. 0 of the 27 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameSunteck Times Square
  • TypeCommercial
  • Location
    • Navghar
    • Village Navghar
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700051191
  • ReraGenie IDRG-MH-05281

Builder

  • NameSunteck Lifespace Private Limited
  • Entity typeCompany
  • CINU70109MH2021PTC370860
  • DirectorsRACHANA VIPUL HINGARAJIA, VIKAS VINOD KANOI
  • Other registrations3 more →

Key dates

this monthRegisteredJun 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jun 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed108 files

Current status

0%0 of 27 units booked
9.0%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Commercial Building No. 1NA3302727

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Commercial Building No. 1: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed128

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots128
Closed/Covered32
Open Space96

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,350 sq m
Land owned byNot the promoter
Named landowners3
Encumbrance on the landDeclared none
Declared on12 Nov 2025
LandownerVillageDistrict
Sureshchandra Devchand shahMumbai CityMumbai City
Jitendra Devchand ShahMumbai CityMumbai City
Atul Devchand ShahMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityThe Mira-Bhayandar Municipal Corporation (MBMC)
Permissible FSI2361.53
Proposed, not sanctioned2,362 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 21, Ground and 1st floor, Senorita, Gulmohar Road, Vile Parle West, Mumbai 400049
Estimated costRs 13.85 cr
Cost incurredRs 1.25 cr
Work done9.03%
BuildingWingEstimatedIncurred
Commercial Building No. 1NARs 11.50 crRs 1.25 cr
-NARs 2.35 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIngrain
EngineerRaju HJ
EngineerRam Sanjiwan
Chartered AccountantJhanwar & Maheshwari
Chartered AccountantWalker Chandiok & Co LLP
Chartered AccountantBagaria & Co. LLP
PartnerRole in project
Sunteck Lifespace Private Limited-

Litigation declared7

CaseCourtStatus
868 of 2009/2009Thane Civil CourtClosed
142 of 2021/2021Chief Controlling Revenue Authority cum IGR and Collector of Stamps PuneOngoing
290 of 2016 /2016Chief Controlling Revenue Authority cum IGR and Collector of Stamps PuneOngoing
441 of 2009 /2009Bombay High CourtClosed
WP/15/2024 /2024Bombay High CourtOngoing
WP/15632/2023 /2023Bombay High CourtClosed
868 of 2009/2009Thane Civil CourtClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 ARCHITECTS CERTIFICATE STS - Retail_Mar-26.pdf25 Apr 2026
Withdrawal Update Form 2File: Form 2 ENGINEERS CERTIFICATE STS - Retail_Mar-26.pdf25 Apr 2026
Withdrawal Update Form 3File: Form 3 CA CERTIFICATE STS - Retail_Mar-26.pdf25 Apr 2026
Withdrawal Update Form 1File: Form 1 Sunteck Times Square Q 3.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2 Sunteck Times Square Q 3.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3 Sunteck Times Square Q 3.pdf29 Jan 2026
Layout approvalFile: Layout.pdf1 Jan 2026
Building plan approvalFile: FINAL APPROVAL.pdf1 Jan 2026
Withdrawal Update Form 1File: Form 1 ARCHITECTu0027S CERTIFICATE STS - Retail_Sep-25.pdf12 Nov 2025
Withdrawal Update Form 1File: Form 1 ARCHITECTu0027S CERTIFICATE STS - Retail_Sep-25.pdf12 Nov 2025
Withdrawal Update Form 2File: Form 2-ENGINEERu0027S CERTIFICATE STS - Retail_June-25.pdf12 Nov 2025
Withdrawal Update Form 2File: Form 2-ENGINEERu0027S CERTIFICATE STS - Retail_Sep-25.pdf12 Nov 2025
Withdrawal Update Form 3File: Form 3-CA CERTIFICATE STS - Retail_Sep-25.pdf12 Nov 2025
Withdrawal Update Form 3File: Form 3-CA CERTIFICATE STS - Retail_Sep-25.pdf12 Nov 2025
Form 5 (FY 2024-2025)File: 2024-25_Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Times Square_2023-24.pdf20 Aug 2025
Form 1File: Form 1 ARCHITECT'S CERTIFICATE STS - Retail_Mar-25.pdf14 Aug 2025
Form 2File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_Mar-25.pdf14 Aug 2025
Form 3File: Form 3-CA CERTIFICATE STS - Retail_Mar-25.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Annexure.pdf14 Aug 2025
Form 1File: Form 1- Architect Certificate STS - Retail_Jan-25.pdf14 Aug 2025
Form 2File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_Jan-25.pdf14 Aug 2025
Form 3File: Form 3-CA CERTIFICATE STS - Retail_Jan-25.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf14 Aug 2025
Form 1File: Form 1- Architect Certificate STS - Retail_Oct-24.pdf14 Aug 2025
Form 2File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_Oct-24.pdf14 Aug 2025
Form 3File: Form 3-CA CERTIFICATE STS - Retail_Oct-24.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Annexure_Oct-24.pdf14 Aug 2025
Form 1File: Form 1- Architect Certificate STS - Retail_June-24.pdf14 Aug 2025
Form 2File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_June-24.pdf14 Aug 2025
Form 3File: Form 3-CA CERTIFICATE STS - Retail_June-24.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Annexure_June-24.pdf14 Aug 2025
Form 1File: Form 1- Architect Certificate STS - Retail_Mar-24.pdf14 Aug 2025
Form 2File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_Mar-24.pdf14 Aug 2025
Form 3File: Form 3-CA CERTIFICATE STS - Retail_Mar-24.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Annexure_Mar-24.pdf14 Aug 2025
Form 1File: Form 1- Architect Certificate STS - Retail_Jan-24.pdf14 Aug 2025
Form 2File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_Jan-24.pdf14 Aug 2025
Form 3File: Form 3-CA CERTIFICATE STS - Retail_Jan-24.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Annexure_Jan-24.pdf14 Aug 2025
Form 1File: Annexure A-Form 1- Architect Certificate STS - Retail_Sep-23.pdf14 Aug 2025
Form 2File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_Sep-23.pdf14 Aug 2025
Form 3File: Form 3-CA CERTIFICATE STS - Retail_Sep-23 Revised.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Annexure_Sep-23.pdf14 Aug 2025
Form 1File: Annexure A-Form 1- Architect Certificate STS - Retail_June-23.pdf14 Aug 2025
Form 2File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_June-23.pdf14 Aug 2025
Form 3File: Form 3-CA CERTIFICATE STS - Retail_June-23.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Annexure_June-23.pdf14 Aug 2025
Withdrawal Update Form 1File: Form 1 ARCHITECTu0027S CERTIFICATE STS - Retail_June-25.pdf14 Aug 2025
Withdrawal Update Form 2File: Form 2-ENGINEERu0027S CERTIFICATE STS - Retail_June-25.pdf14 Aug 2025
Withdrawal Update Form 3File: Form 3-CA CERTIFICATE STS - Retail_June-25.pdf14 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT'S CERTIFICATE STS - Retail_Mar-25.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE STS - Retail_Mar-25.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_Mar-25.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate STS - Retail_Jan-25.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE STS - Retail_Jan-25.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_Jan-25.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate STS - Retail_Oct-24.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE STS - Retail_Oct-24.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_Oct-24.pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Times Square_2023-24 Downloaded Signed.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Times Square_2023-24 Downloaded Signed.pdf7 Oct 2024
Form 5 (FY 2023-2024)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Times Square_2023-24 Downloaded Signed.pdf30 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate STS - Retail_June-24.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_June-24.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE STS - Retail_June-24.pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate STS - Retail_Mar-24.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_Mar-24.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2024 03 Annexure C-Form 2A-ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE STS.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE STS - Retail_Mar-24.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate STS - Retail_Jan-24.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_Jan-24.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE STS - Retail_Jan-24.pdf24 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 01 Layout plan.pdf18 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: 06 Bldg 1 Gr 1st Retail.pdf18 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: 07 Bldg 1 2flr, 3flr Retail.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A-Form 1- Architect Certificate STS - Retail_Sep-23.pdf6 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE STS - Retail_Sep-23.pdf6 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE STS - Retail_Sep-23 Revised.pdf6 Nov 2023
Proforma of Allotment letterFile: Proforma allotment letter revised STS- 28092023.pdf29 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate.pdf25 May 2023

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sunteck Times Square on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Navghar7,600+ in Thane

2 kmSunteck Times SquareCompleted 106Lapsed / revoked 78Other 102Dot size: filed unitsN

Filed coordinates, straight-line distance. 286 registered projects within 2 km.

Builder: Sunteck Lifespace Private Limited

Sunteck Lifespace Private Limited has 4 registrations on MahaRERA, including Sunteck Sky Park 2 and Sunteck Sky Park 1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sunteck Times Square is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sunteck Times Square?

The registered promoter entity is Sunteck Lifespace Private Limited, a company as per the filing. Its CIN U70109MH2021PTC370860 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sunteck Times Square?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sunteck Times Square?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sunteck Times Square?

The professionals named in the filing: Architect: Ingrain; Engineer: Raju HJ; Engineer: Ram Sanjiwan; Chartered Accountant: Jhanwar & Maheshwari; Chartered Accountant: Walker Chandiok & Co LLP; Chartered Accountant: Bagaria & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sunteck Times Square?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sunteck Times Square. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sunteck Times Square to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.