Home / Browse projects / Thane, Maharashtra / Sunteck Sky Park 3

Registered Litigation declared Residential / Group Housing project

Sunteck Sky Park 3

By Sunteck Lifespace Private Limited

RG-MH-07578 · RERA P51700055703 · Last updated on MahaRERA portal: 13 Feb 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 7 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 0%
239 of 358Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Sunteck Sky Park 3 is a Residential / Group Housing project by Sunteck Lifespace Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700055703 on 15 Apr 2024. Possession is promised by 31 Dec 2030. 119 of the 358 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameSunteck Sky Park 3
  • TypeResidential / Group Housing
  • Location
    • Navghar
    • Village Navghar
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • RERA no.P51700055703
  • ReraGenie IDRG-MH-07578

Builder

  • NameSunteck Lifespace Private Limited
  • Entity typeCompany
  • CINU70109MH2021PTC370860
  • DirectorsRACHANA VIPUL HINGARAJIA, VIKAS VINOD KANOI
  • Other registrations3 more →

Key dates

this monthRegisteredApr 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Apr 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

33%119 of 358 units booked
3.6%Work done, per cost certificate

Figures as on 13 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 3NA943580358

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Building 3: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered1
Open Space15

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
Declared on12 Jun 2025
LandownerVillageDistrict
Sureshchandra Devchand shah-Mumbai City
Jitendra Devchand ShahD-400007Mumbai City
Atul Devchand Shah-Mumbai City

Approvals and building plan

Sanctioning authorityThe Mira-Bhayandar Municipal Corporation (MBMC)
Permissible FSI36000.0
Proposed, not sanctioned1,793 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSenorita, Plot No 21, Gulmohar Road, Near Juhu Circle, Vile Parle West, Mumbai Maharashtra 400049
Estimated costRs 222.84 cr
Cost incurredRs 8.00 cr
Work done3.59%
BuildingWingEstimatedIncurred
Building 3NARs 196.34 crRs 8.00 cr
-NARs 26.50 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIngrain
EngineerRaju HJ
EngineerRam Sanjiwan
Chartered AccountantJhanwar & Maheshwari
Chartered AccountantWalker Chandiok & Co LLP
Chartered AccountantBagaria & Co. LLP
PartnerRole in project
Sunteck Lifespace Private Limited-

Litigation declared7

CaseCourtStatus
868 of 2009/2009Thane Civil CourtClosed
142 of 2021 /2021Chief Controlling Revenue Authority cum IGR and Collector of Stamps PuneOngoing
290 of 2016 /2016Chief Controlling Revenue Authority cum IGR and Collector of Stamps PuneOngoing
441 of 2009/2009Bombay High CourtClosed
31791 of 2023/2023Bombay High CourtOngoing
15632 of 2023/2023Bombay High CourtClosed
868 of 2009/2009Thane Civil CourtClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Sunteck Sky Park 3 Q3 Form 1 ARCHITECTS CERTIFICATE.pdf13 Feb 2026
Withdrawal Update Form 1File: Sunteck Sky Park 3 Q3 Form 1 ARCHITECTS CERTIFICATE.pdf13 Feb 2026
Withdrawal Update Form 2File: Sunteck Sky Park 3 Q3 Form 2 ENGINEERS CERTIFICATE.pdf13 Feb 2026
Withdrawal Update Form 2File: Sunteck Sky Park 3 Q3 Form 2 ENGINEERS CERTIFICATE.pdf13 Feb 2026
Withdrawal Update Form 3File: Sunteck Sky Park 3 Q3 Form 3 CA CERTIFICATE.pdf13 Feb 2026
Withdrawal Update Form 3File: Sunteck Sky Park 3 Q3 Form 3 CA CERTIFICATE.pdf13 Feb 2026
Withdrawal Update Form 1File: Form 1- Architect Certificate SSP 3 Sep-25.pdf27 Nov 2025
Withdrawal Update Form 2File: Form 2-ENGINEERu0027S CERTIFICATE SSP3_Sep-25.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3-CA CERTIFICATE SSP3_Sep-25.pdf27 Nov 2025
Form 5 (FY 2024-2025)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Sky Park 3_2024-25.pdf19 Aug 2025
Withdrawal Update Form 1File: Form 1- Architect Certificate SSP 3 June-25.pdf7 Aug 2025
Withdrawal Update Form 2File: Form 2-ENGINEERu0027S CERTIFICATE SSP3_June-25.pdf7 Aug 2025
Withdrawal Update Form 3File: Form 3-CA CERTIFICATE SSP3_June-25 R.pdf7 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SSP 3_Mar-25.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SSP3_Mar-25.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SSP3_Mar-25.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SSP 3_Jan-25.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SSP3_Jan-25.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SSP3_Jan-25.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SSP 3_Oct-24.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SSP 3_Oct-24.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SSP 3_Oct-24.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE SSP 3_June-24.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE SRP 3_June-24.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE SSP 3_June-24.pdf30 Jul 2024
Proforma of Agreement for saleFile: 27032024- Draft AFS- Mira Road Phase 3.pdf27 Mar 2024
Deviation Report with respect to model copy of AgreementFile: 27032024 Model RERA AFS- DEVIATION REPORT Part1 .pdf27 Mar 2024
Deviation Report with respect to model copy of AgreementFile: 27032024 Model RERA AFS- DEVIATION REPORT Part2.pdf27 Mar 2024
Other - LegalFile: Format D-DECLARATION ABOUT COMMENCEMENT CERTIFICATE SSP-3 04032024.pdf26 Mar 2024
PAN CardFile: Pancard .pdf16 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate SSP 3 on letterhead.pdf16 Feb 2024
Other - TechnicalFile: ANNEXURE 'A' Declaration cum Undertaking One plot one registration .pdf8 Feb 2024
Layout approvalFile: 01 Layout plan.pdf1 Feb 2024
Building plan approvalFile: 01 Layout plan.pdf1 Feb 2024
Building plan approvalFile: 03 Bldg 1 to 4.pdf1 Feb 2024
Building plan approvalFile: 04 Bldg 1 to 4.pdf1 Feb 2024
Building plan approvalFile: 05 Blg 1 to 4 Section Plan.pdf1 Feb 2024
Building plan approvalFile: 14 Bldg 2 and 3 Gr and 1st Flr.pdf1 Feb 2024
Building plan approvalFile: 14 Bldg 2 and 3 Gr and 1st Flr.pdf1 Feb 2024
Building plan approvalFile: 16 Bldg 2 and 3 4th Flr.pdf1 Feb 2024
Copy of the legal title reportFile: Title Report.pdf1 Feb 2024
Copy of the legal title reportFile: Title Report Annexure A.pdf1 Feb 2024
Copy of the legal title reportFile: Title Report Annexure B Search Report.pdf1 Feb 2024
Details of encumbrances concerned to FinanceFile: 003 SSP- ENCUMBRANCE PROMOTER DECLARATION.pdf1 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrance concerned to Legal.pdf1 Feb 2024
Details of encumbrances concerned to LegalFile: 003 SSP- ENCUMBRANCE PROMOTER DECLARATION.pdf1 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrance concerned to Legal.pdf1 Feb 2024
Copy of Layout Approval (in case of layout)File: 01 Layout plan.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 01 Layout plan.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 03 Bldg 1 to 4.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 04 Bldg 1 to 4.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 05 Blg 1 to 4 Section Plan.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 14 Bldg 2 and 3 Gr and 1st Flr.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 14 Bldg 2 and 3 Gr and 1st Flr.pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 16 Bldg 2 and 3 4th Flr.pdf1 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 2023 02 17 CC Hilighted.pdf1 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 2023 04 17 CC Revised Hilighted Compress.pdf1 Feb 2024
Declaration about Commencement CertificateFile: Format D-DECLARATION ABOUT COMMENCEMENT CERTIFICATE SSP-3.pdf1 Feb 2024
Declaration in FORM BFile: Form B- Affidavit cum-Declaration Pramoter SSP 3 Compress.pdf1 Feb 2024
CERSAI detailsFile: Declaration CERSAI Certificate.pdf1 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in Other Real Estate Organizations RH 050124.pdf1 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in Other Real Estate Organizations VK050124.pdf1 Feb 2024
Proforma of Allotment letterFile: 29012024 Proforma allotment letter.pdf1 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A-Declaration about Separate Bank Account for real estate projects SSP3.pdf1 Feb 2024
Deviation Report with respect to Allotment letterFile: Allotment letter deviation Compress.pdf1 Feb 2024

How this compares with Thane

33%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sunteck Sky Park 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Navghar7,600+ in Thane

Builder: Sunteck Lifespace Private Limited

Sunteck Lifespace Private Limited has 4 registrations on MahaRERA, including Sunteck Sky Park 2 and Sunteck Sky Park 1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sunteck Sky Park 3 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sunteck Sky Park 3?

The registered promoter entity is Sunteck Lifespace Private Limited, a company as per the filing. Its CIN U70109MH2021PTC370860 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sunteck Sky Park 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sunteck Sky Park 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sunteck Sky Park 3?

The professionals named in the filing: Architect: Ingrain; Engineer: Raju HJ; Engineer: Ram Sanjiwan; Chartered Accountant: Jhanwar & Maheshwari; Chartered Accountant: Walker Chandiok & Co LLP; Chartered Accountant: Bagaria & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sunteck Sky Park 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sunteck Sky Park 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sunteck Sky Park 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.