Completed No litigation declared Commercial project

Sunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri East

By Poonam Co-operative Housing Society Limited

RG-MH-12698 · RERA P51800022233 · Last updated on MahaRERA portal: 25 Oct 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • 1 extension taken

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jan 2022Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
21 of 81Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

Sunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri East is a Commercial project by Poonam Co-operative Housing Society Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800022233 on 5 Sep 2019. The registration is recorded completed; possession was promised by 31 Jan 2022. 60 of the 81 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri East
  • TypeCommercial
  • Location
    • Andheri Kurla Road
    • Mukund Nagar
    • Andheri East
    • Andheri
    • Mumbai Suburban
    • 400059
  • Pincode400059
  • RERA no.P51800022233
  • ReraGenie IDRG-MH-12698

Builder

  • NamePoonam Co-operative Housing Society Limited
  • Entity typeSociety
  • Authorized SignatoryPrakash Modi

Key dates

this monthRegisteredSep 2019PromisedJan 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Sep 2019
  • Promised completion31 Jan 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed89 files

Current status

74%60 of 81 units booked
47.1%Work done, per cost certificate

Figures as on 25 Oct 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sunteck Crest, Plot No 3, Mukund Nagar, Andheri Kurla Road, Andheri EastNA12008181

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Sunteck Crest, Plot No 3, Mukund Nagar, Andheri Kurla Road, Andheri East: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered86
Open Space4

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,146 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Oct 2024

Approvals and building plan

Permissible FSI4640.49
Proposed, not sanctioned2,442 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Senorita, Plot No 21, Gulmohar Road , Near Juhu Circle, Vile Parle West, Mumbai 400056
Estimated costRs 35.33 cr
Cost incurredRs 16.64 cr
Work done47.11%
BuildingWingEstimatedIncurred
Sunteck Crest, Plot No 3, Mukund Nagar, Andheri Kurla Road, Andheri EastNARs 32.08 crRs 13.39 cr
-NARs 3.25 crRs 3.25 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Shikre & Associates
EngineerJagdish Korgoankar
Chartered AccountantJhanwar & Maheshwari
Chartered AccountantV.G.KAMAT & ASSOCIATES CHARTERED ACCOUNTANTS
Chartered AccountantNidhi Somani & Co.
PartnerRole in project
Poonam Co-operative Housing Society Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010713Jan 2022 → Jan 2023

Reason as filed by the promoterWork in Progress keeping in mind the ongoing Covid pandemic impacting operations of the projects

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000209362Abhishek Ashok MehtaPoonam Co-operative Housing Society Limited10/12/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Apr 2023

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Crest_2023-24.pdf25 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Crest_2022-23.pdf5 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 12_2023 03 Form 2A-ENGINEER'S QUALITY CERTIFICATE Crest.pdf9 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2023 04 12 OCC letter.pdf29 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Annexure E-Form 4- Architect Certificate Sunteck Crest.pdf29 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Crest_Mar-23.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Crest_Mar-23.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Crest_Mar-23.pdf28 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-CA CERTIFICATE ANNUAL REPORT Sunteck Crest_2021-22.pdf24 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Crest_Jan-23.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Crest_Jan-23.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Crest_Jan-23.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-ARCHITECT'S CERTIFICATE Crest_Oct-22.pdf14 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-ENGINEER'S CERTIFICATE Crest_Oct-22.pdf14 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA CERTIFICATE Crest_Oct-22.pdf14 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Certificates of CA (Form 5) Sunteck Crest 2021-22.pdf29 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Crest_July-22.pdf18 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sunteck Crest_July-22.pdf18 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 07 06 Form 3-CA Certificate Sunteck Crest_July-22.pdf18 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Crest_Mar-22.pdf14 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sunteck Crest_Mar-22.pdf14 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A)File: 12_2022 03 FORM 2A Quality Assurance Certificate Sunteck Crest.pdf14 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sunteck Crest Mar-22.pdf14 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sunteck Crest_Jan-22.pdf10 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Crest_Jan-22.pdf8 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 10_2021 12 FORM 2A Quality Assurance Certificate Sunteck Crest.pdf8 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 01 07 Form 3-CA Certificate Sunteck Crest_Jan-22.pdf8 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sunteck Crest_Dec-21.pdf9 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 12 04 Form 3-CA Certificate Sunteck Crest_Dec-21.pdf9 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 09 11 2021.pdf10 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Crest_Oct-21.pdf12 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Certificates of CA Form 5 Sunteck Crest 2020-21.pdf29 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 09_2021 09 FORM 2A Quality Assurance Certificate Sunteck Crest.pdf22 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 for FY 2019-2020.pdf30 Aug 2021
OtherFile: Affidavit Cum Declaration Final.pdf30 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Crest_Aug-21.pdf23 Aug 2021
Building plan approvalFile: 2021 08 11 IOD Letter 11 08 21.pdf16 Aug 2021
Building plan approvalFile: 2021 08 11 IOD Drawing.pdf16 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 2021 08 11 IOD Letter 11 08 21.pdf16 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 2021 08 11 IOD Drawing.pdf16 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 08 2021 06 FORM 2A Quality Assurance Certificate Sunteck Crest.pdf16 Aug 2021
Declaration about Commencement CertificateFile: Declaration for CC.pdf9 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf9 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf9 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Crest June 21.pdf22 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A)File: 08 2021 06 FORM 2A Quality Assurance Certificate Sunteck Crest.pdf22 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Crest_Mar-21.pdf23 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A)File: 07 2021 03 FORM 2A Quality Assurance Certificate Sunteck Crest.pdf23 Mar 2021
Building plan approvalFile: Amended Plan Approval Letter 241220.pdf30 Jan 2021
Building plan approvalFile: Amended Drawing 241220.pdf30 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Approval Letter 241220.pdf30 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing 241220.pdf30 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 28th Jan 2021.pdf29 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Crest Dec 20.pdf22 Dec 2020
Engineers Certificate on Quality Assurance (Form 2A)File: 06 2020 12 FORM 2A Quality Assurance Certificate Sunteck Crest.pdf22 Dec 2020
Engineers Certificate on Quality Assurance (Form 2A)File: 04_2020 06 FORM 2A Quality Assurance Certificate Sunteck Crest.pdf24 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A)File: 05_2020 09 FORM 2A Quality Assurance Certificate Sunteck Crest.pdf24 Sep 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Crest Sep20 Final to upload.pdf18 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A)File: 03_2020 03 FORM 2A Quality Assurance Certificate Sunteck Crest.pdf13 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Crest Feb 20.pdf28 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A)File: 02_2019 12 FORM 2A Quality Assurance Certificate Sunteck Crest.pdf20 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sunteck Crest Nov 19.pdf28 Nov 2019
Building plan approvalFile: Amended IOD ltr 240919.pdf25 Sep 2019
Building plan approvalFile: Amended IOD DWG 240919 .pdf25 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD ltr 240919.pdf25 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD DWG 240919 .pdf25 Sep 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sunteck Crest Engineer Certificate 31819.pdf3 Sep 2019
Engineers Certificate on Quality Assurance (Form 2A)File: Form 2A Quality Assurance Certificate .pdf3 Sep 2019
Building plan approvalFile: 2014 12 29 IOD with approved Plans.pdf29 Aug 2019
Building plan approvalFile: 2016 04 05 Poonam ammended IOD Plan.pdf29 Aug 2019
Building plan approvalFile: 2016 04 05 Poonam ammended IOD.pdf29 Aug 2019
Building plan approvalFile: 2017 08 03 Ammended Plan Approval IOD Drawing.pdf29 Aug 2019
Building plan approvalFile: 2017 08 03 Ammended Plan Approval IOD Letter.pdf29 Aug 2019
Layout approvalFile: 2014 12 29 IOD with approved Plans.pdf29 Aug 2019
Copy of the legal title reportFile: POONAM TITLE RPT030114.pdf29 Aug 2019
Details of encumbrancesFile: Encumbrance Sunteck Crest.pdf29 Aug 2019
Copy of Layout Approval (in case of layout)File: 2014 12 29 IOD with approved Plans.pdf29 Aug 2019
Building Plan Approval / NA Order for plotted developmentFile: 2014 12 29 IOD with approved Plans.pdf29 Aug 2019
Building Plan Approval / NA Order for plotted developmentFile: 2016 04 05 Poonam ammended IOD Plan.pdf29 Aug 2019
Building Plan Approval / NA Order for plotted developmentFile: 2016 04 05 Poonam ammended IOD.pdf29 Aug 2019

How this compares with Mumbai Suburban

74%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sunteck Crest, Plot No.3, Mukund Nagar, Andh on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mukund Nagar, Andheri East6,700+ in Mumbai Suburban

Builder: Poonam Co-operative Housing Society Limited

Poonam Co-operative Housing Society Limited has 1 registration on MahaRERA, including Sunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri East. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Sunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri East is delayed beyond 31 Jan 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri East?

The registered promoter entity is Poonam Co-operative Housing Society Limited, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri East?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri East?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri East?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri East?

The professionals named in the filing: Architect: Sandeep Shikre & Associates; Engineer: Jagdish Korgoankar; Chartered Accountant: Jhanwar & Maheshwari; Chartered Accountant: V.G.KAMAT & ASSOCIATES CHARTERED ACCOUNTANTS; Chartered Accountant: Nidhi Somani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri East?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sunteck Crest, Plot No.3, Mukund Nagar, Andheri Kurla Road, Andheri East. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sunteck Crest, Plot No.3, Mukund Nagar, Andh to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.