Home / Browse projects / Pune, Maharashtra / SUNDER MOTI
SUNDER MOTI
RG-MH-95080 · RERA P52100051080 · Last updated on MahaRERA portal: 30 Sep 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUNDER MOTI is a Residential / Group Housing project by DILIP MOTILALJI CHORDIA in Pune, Maharashtra, registered with MahaRERA as P52100051080 on 29 May 2023. The registration is recorded completed; possession was promised by 30 Sep 2025. The completion date has moved by 6 months from the original filing. 8 of the 12 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameSUNDER MOTI
- TypeResidential / Group Housing
- Location
- S NO 269 HISSA NO 2 TO 7 CTS NO 4244
- 4244/1 TO 7
- CHINCHWAD
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100051080
- ReraGenie IDRG-MH-95080
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on29 May 2023
- Promised completion30 Sep 2025
- Revised completionRevised to 30 Sep 2025 (originally 31 Mar 2025)
- Buildings1 building record
- Documents filed91 files
Current status
Figures as on 30 Sep 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 6 | 6 | 12 | 0 | 12 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
A WING: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed12
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A WING | NA | Rs 4.50 cr | Rs 4.18 cr |
| - | NA | Rs 20.00 lakh | Rs 19.89 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SIDDHARTH HARISHCHANDRAKAR |
| Engineer | Anand Shivaji Dewadkar |
| Engineer | SUNIL KOGNOLE |
| Engineer | Sanket Vitthal Jadhav |
| Chartered Accountant | SPAY & CO |
| Chartered Accountant | RMRA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| DILIP MOTILALJI CHORDIA | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe promoter is estimating 6 more Months for the completion, due to non-availability of labor and other resources. We request you to allow us an extension of the project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed91
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Gmail - Completion Certificate Verification For RERA Application No -P52100051080.pdf | 30 Sep 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A.pdf | 23 Sep 2025 |
| Occupational CertificateFile: FULL OC.pdf | 23 Sep 2025 |
| Form 5 (FY 2024-2025)File: FINAL FORM 5_SUNDER MOTI.pdf | 20 Sep 2025 |
| Form 1File: Form 1.pdf | 23 Jun 2025 |
| Form 2File: Form 2.pdf | 23 Jun 2025 |
| Form 3File: Form 3.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory.pdf | 23 Jun 2025 |
| Form 1File: FORM 1.pdf | 23 Jun 2025 |
| Form 2File: FORM 2.pdf | 23 Jun 2025 |
| Form 3File: FORM 3.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY_Q3.pdf | 23 Jun 2025 |
| Form 1File: FORM 1.pdf | 23 Jun 2025 |
| Form 2File: FORM 2.pdf | 23 Jun 2025 |
| Form 3File: FORM 3.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DOSCLOSURE OF INVENTORY _Q2.pdf | 23 Jun 2025 |
| Form 1File: FORM 1.pdf | 23 Jun 2025 |
| Form 2File: FORM 2.pdf | 23 Jun 2025 |
| Form 3File: FORM 3.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY_Q1.pdf | 23 Jun 2025 |
| Form 1File: Q1.pdf | 23 Jun 2025 |
| Form 2File: Q1.pdf | 23 Jun 2025 |
| Form 3File: Q1.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Q1.pdf | 23 Jun 2025 |
| Form 1File: Q2.pdf | 23 Jun 2025 |
| Form 2File: Q2.pdf | 23 Jun 2025 |
| Form 3File: Q2.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Q2.pdf | 23 Jun 2025 |
| Form 1File: Q3.pdf | 23 Jun 2025 |
| Form 2File: Q3.pdf | 23 Jun 2025 |
| Form 3File: Q3.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Q3.pdf | 23 Jun 2025 |
| Form 1File: Q4.pdf | 23 Jun 2025 |
| Form 2File: Q4.pdf | 23 Jun 2025 |
| Form 3File: Q4.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Q4.pdf | 23 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Sundarmoti.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Mar 2025.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Mar 2025.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Mar 2025.pdf | 16 Apr 2025 |
| Declaration in FORM BFile: FORM B.pdf | 25 Mar 2025 |
| Other - TechnicalFile: PERT CHART.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Dec 2024.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sundermoti.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Dec2024.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sundar moti Form 5 2023-24.pdf | 27 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate sundar moti.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Sundar Moti.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate sundar moti.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (Engineer Certificate) June 2024.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate June 2024 Sudar Moti.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ADS Architech Certificate Q1.pdf | 29 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ADS Architech Certificate Q2.pdf | 29 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ADS Architech Certificate Q3.pdf | 29 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ADS Architech Certificate Q4.pdf | 29 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vishal Asco Sunil Kognale Engi Certificate 1.pdf | 29 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vishal Asco Sunil Kognale Engi Certificate 2.pdf | 29 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vishal Asco Sunil Kognale Engi Certificate 3_.pdf | 29 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vishal Asco Sunil Kognale Engi Certificate 4_.pdf | 29 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Vishal Asco Sunil Kognale Quality Assurnce.pdf | 29 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Yogesh Kata Vishal Asco Q2.pdf | 29 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Yogesh Kata Vishal Asco Q3.pdf | 29 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Yogesh Kata Vishal Asco Q4.pdf | 29 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept 2023 Sunder Moti.pdf | 9 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Self Declaration for Updating Bank Details.pdf | 9 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Decleration Letter Head Bank Updating Sundear Moti.pdf | 13 Jul 2023 |
| Declaration about Commencement CertificateFile: DECLARATION FOR ADDRESS IN CC.pdf | 19 May 2023 |
| Other - LegalFile: 1 DECLARATION.pdf | 9 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL FORM 3_compressed.pdf | 25 Apr 2023 |
| Proforma of Allotment letterFile: Allotment Letter Final.pdf | 24 Apr 2023 |
| Deviation Report with respect to Allotment letterFile: 3 NO DEVIATION ALLOTMENT LETTER.pdf | 24 Apr 2023 |
| Deviation Report with respect to model copy of AgreementFile: 4 NO DEVIATION MODEL FORM OF AGREEMENT.pdf | 24 Apr 2023 |
| Copy of the legal title reportFile: Sundar Moti Search And Title Report_compressed.pdf | 28 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: No Financial and Legal Encumbrances.pdf | 28 Mar 2023 |
| Details of encumbrances concerned to LegalFile: No Financial and Legal Encumbrances.pdf | 28 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 28 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 14 Mar 2023 |
| Proforma of Agreement for saleFile: Agreement for Sale.pdf | 14 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 91 filed documents as one ZIP, foldered, with a manifest
Keep SUNDER MOTI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHINCHWAD13,700+ in Pune
Filed coordinates, straight-line distance. 137 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: DILIP MOTILALJI CHORDIA
DILIP MOTILALJI CHORDIA has 2 registrations on MahaRERA, including SUNDER MOTI and SUNDARMOTI RESIDENCY. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SUNDER MOTI is delayed beyond 30 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUNDER MOTI?
The registered promoter entity is DILIP MOTILALJI CHORDIA, an individual as per the filing. Its GSTIN 27AAMPC1174F1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUNDER MOTI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SUNDER MOTI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUNDER MOTI?
The professionals named in the filing: Architect: SIDDHARTH HARISHCHANDRAKAR; Engineer: Anand Shivaji Dewadkar; Engineer: SUNIL KOGNOLE; Engineer: Sanket Vitthal Jadhav; Chartered Accountant: SPAY & CO; Chartered Accountant: RMRA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUNDER MOTI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback