Home / Browse projects / Raigarh, Maharashtra / Sundar Residency Phase-II

Completed No litigation declared Residential / Group Housing project

Sundar Residency Phase-II

By LAXMIKANTAN RAMAKRISHNAN VENKATRAMAN

RG-MH-29817 · RERA P52000029402 · Last updated on MahaRERA portal: 13 Aug 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 17 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
May 2023Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 34 documents Report an error

Sundar Residency Phase-II is a Residential / Group Housing project by LAXMIKANTAN RAMAKRISHNAN VENKATRAMAN in Raigarh, Maharashtra, registered with MahaRERA as P52000029402 on 29 May 2021. The registration is recorded completed; possession was promised by 16 May 2023. The completion date has moved by 17 months from the original filing.

At a glance

Project

  • NameSundar Residency Phase-II
  • TypeResidential / Group Housing
  • Location
    • Survey No - 95/1
    • Panvel
    • Poyanje
    • Raigarh
    • 410221
  • Pincode410221
  • RERA no.P52000029402
  • ReraGenie IDRG-MH-29817

Builder

  • NameLAXMIKANTAN RAMAKRISHNAN VENKATRAMAN
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2021First promiseDec 2021Revised toMay 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 May 2021
  • Promised completion16 May 2023
  • Revised completionRevised to 16 May 2023 (originally 30 Dec 2021)
  • Buildings3 building records
  • Documents filed34 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No -1 A,B and CNA30000
Building No -2 D, E and FNA30000
Building No -3 G, H and INA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

Building No -1 A,B and C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No -2 D, E and F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No -3 G, H and I91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered15
BuildingClosed/CoveredTotal
Building No -1 A,B and C44
Building No -2 D, E and F66
Building No -3 G, H and I55

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,487 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1747.83
Proposed, not sanctioned1,748 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKULSWAMINI, RAGHUNATH ROAD, SECTOR 13, KHARGHAR, NAVI MUMBAI, MAHARASHTRA 410210

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUBODH KRISHNA TARI
EngineerA. G Gokhale And Associated
Chartered AccountantRUTUJA NARSINGH & ASSOCIATES
Chartered AccountantRutuja Narsingh
PartnerRole in project
LAXMIKANTAN RAMAKRISHNAN VENKATRAMAN-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000024287Dec 2021 → May 2023

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. As we have received OC, we do not require consents.

EXT52000012074Dec 2021 → Sep 2022

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of the project in Format B.

EXT52000011240Dec 2021 → Jun 2022

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of the project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of pandemic of Covid-19.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Jul 2024

Documents filed34

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B Sundar Residency Phase - II.pdf13 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Sundar Residency.pdf18 Jul 2024
Declaration in FORM BFile: Form B Phase II.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2024.pdf6 Jul 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 16-05-2023_11zon (1).pdf6 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf6 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24 Sundar Residency Phase II.pdf11 Jun 2024
Declaration in FORM BFile: Form B Phase II.pdf10 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf10 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf10 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf10 Jun 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration of Society.pdf10 Jun 2024
Status of ConveyanceFile: Declaration of Conveyance.pdf10 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf10 Jun 2024
Declaration about Commencement CertificateFile: Circular 32 Sundar Residency.pdf31 Dec 2021
Disclosure of sold/ booked inventoryFile: Circular 29 Sundar Residency.pdf31 Dec 2021
CERSAI detailsFile: Sundar Residency Phase II.pdf31 Dec 2021
Copy of the legal title reportFile: Sundar residency phase II_Title updated.pdf17 May 2021
Proforma of Allotment letterFile: Sundar residency phase II_ATS.pdf30 Apr 2021
Proforma of Allotment letterFile: Sundar Residency Phase II_Allotment letter (2).pdf30 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sundar Residency Phase-II.pdf28 Apr 2021
Layout approvalFile: FOR HDFC SANTOSH_page-0001.pdf26 Apr 2021
Building plan approvalFile: FOR HDFC SANTOSH_page-0004 (1).pdf26 Apr 2021
Building plan approvalFile: FOR HDFC SANTOSH_page-0006.pdf26 Apr 2021
Details of encumbrancesFile: SUNDAR RESIDENCY ENCUMBRANCE .pdf26 Apr 2021
Copy of Layout Approval (in case of layout)File: FOR HDFC SANTOSH_page-0001.pdf26 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: FOR HDFC SANTOSH_page-0004 (1).pdf26 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: FOR HDFC SANTOSH_page-0006.pdf26 Apr 2021
Declaration in FORM BFile: FORM B SUNDAR RESIDENCY .pdf26 Apr 2021
PAN CardFile: PANCARD.pdf22 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: BP-328_Amm1_CCLetter (1).pdf22 Apr 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SUNDAR RESIDENCYP52000016733POYANJE, Raigarh213Jun 2018CompletedMay 2023Registered original: Dec 2020May 2023
Eden GardenP52000015065Poyanje, Raigarh246Jan 2018CompletedDec 2019Late, Nov 2020

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 17 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sundar Residency Phase-II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

Builder: LAXMIKANTAN RAMAKRISHNAN VENKATRAMAN

LAXMIKANTAN RAMAKRISHNAN VENKATRAMAN has 3 registrations on MahaRERA, including SUNDAR RESIDENCY and Sundar Residency Phase-II. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Sundar Residency Phase-II is delayed beyond 16 May 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sundar Residency Phase-II?

The registered promoter entity is LAXMIKANTAN RAMAKRISHNAN VENKATRAMAN, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sundar Residency Phase-II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sundar Residency Phase-II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sundar Residency Phase-II?

The professionals named in the filing: Architect: SUBODH KRISHNA TARI; Engineer: A. G Gokhale And Associated; Chartered Accountant: RUTUJA NARSINGH & ASSOCIATES; Chartered Accountant: Rutuja Narsingh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sundar Residency Phase-II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sundar Residency Phase-II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sundar Residency Phase-II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.