Sun Samruddhi Phase II
RG-MH-22791 · RERA P52700032649 · Last updated on MahaRERA portal: 3 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sun Samruddhi Phase II is a Others project by M/s Sun Developers in Satara, Maharashtra, registered with MahaRERA as P52700032649 on 17 Jan 2022. Possession is promised by 31 Mar 2027. 49 of the 49 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.
At a glance
Project
- NameSun Samruddhi Phase II
- TypeOthers
- Location
- Dhangarwadi
- Khandala
- Satara
- 412801
- Pincode412801
- RERA no.P52700032649
- ReraGenie IDRG-MH-22791
Builder
- NameM/s Sun Developers
- Entity typePartnership
- PartnersSuhas Vishram Chavda, Mohan Marutrao Jadhav, Mohini Mahan Jadhav
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Jan 2022
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings2 building records
- Documents filed89 files
Current status
Figures as on 3 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A2 | NA | 9 | 7 | 49 | 0 | 49 |
| Commercial Wing A | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 3 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.
Wing A282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Commercial Wing A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed23
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A2 | NA | Rs 4.51 cr | Rs 4.49 cr |
| Commercial Wing A | NA | Rs 23.67 lakh | - |
| - | NA | Rs 20.52 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rajendra Khire |
| Engineer | Goraknath Wavre |
| Chartered Accountant | P B Shah |
| Chartered Accountant | Parag Patwa and Associates |
| Partner | Role in project |
|---|---|
| M/s Sun Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Dec 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Dec 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 21 Mar 2025
Documents filed89
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A.pdf | 3 Sep 2026 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 3 Sep 2026 |
| Withdrawal Update Form 1File: FORM -1-Sun Developers.pdf | 28 Aug 2026 |
| Withdrawal Update Form 1File: FORM -1-Sun Developers.pdf | 28 Aug 2026 |
| Withdrawal Update Form 1File: FORM -1-Sun Developers.pdf | 28 Aug 2026 |
| Withdrawal Update Form 1File: FORM -1-Sun Developers.pdf | 28 Aug 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 28 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Sun Developers.pdf | 28 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Sun Developers.pdf | 28 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Sun Developers.pdf | 28 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Sun Developers.pdf | 28 Aug 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 28 Aug 2026 |
| Withdrawal Update Form 3File: Form-3 - Sun developers.pdf | 28 Aug 2026 |
| Withdrawal Update Form 3File: Form-3 - Sun developers.pdf | 28 Aug 2026 |
| Withdrawal Update Form 3File: Form-3 - Sun developers.pdf | 28 Aug 2026 |
| Withdrawal Update Form 3File: Form-3 - Sun developers.pdf | 28 Aug 2026 |
| Withdrawal Update Form 3File: Form-3 - Sun developers.pdf | 28 Aug 2026 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sun Developers_Signed.pdf | 29 Mar 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4_MahaRERA.pdf | 21 Mar 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OcupencyCertificate_BlgA.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 .pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 25-09-2024.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 25-12-2024.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 25-09-2024.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 25-12-2024.pdf | 3 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 25-09-2024.pdf | 3 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 25-12-2024_compressed.pdf | 3 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 25-09-2024.pdf | 3 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3_compressed.pdf | 3 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 _compressed.pdf | 3 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 25-09-2024.pdf | 3 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 25-12-2024.pdf | 3 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 25-09-2024.pdf | 3 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 25-12-2024_0001.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 25-09-2024.pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 25-09-2024.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 25-09-2024.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 .pdf | 28 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2.pdf | 28 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure_0001.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3.pdf | 20 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 12 Feb 2024 |
| Declaration about Commencement CertificateFile: Declaration about Commencement certificate.pdf | 12 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A.pdf | 12 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold flat list.pdf | 12 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form_5_2022-23.pdf | 12 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Certificate.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Certificate.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 25-09-2023.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1.pdf | 16 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_scan copy.pdf | 16 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3.pdf | 16 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SUN DEVELOPERS-FORM NO-5.pdf | 7 Feb 2023 |
| Declaration about Commencement CertificateFile: Commencement Declaration 100122_compressed.pdf | 10 Jan 2022 |
| OtherFile: Phase II Plot Area and FSI Calculation.pdf | 10 Jan 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200225821988_For_Asset_Based_Search_13_12_2021_22_57_21_153.pdf | 15 Dec 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Sun Developers-2-8_compressed.pdf | 6 Dec 2021 |
| Building plan approvalFile: Plan Sanction 1.pdf | 2 Dec 2021 |
| Building plan approvalFile: Plan Sanction 2.pdf | 2 Dec 2021 |
| Building plan approvalFile: Plan Sanction 3.pdf | 2 Dec 2021 |
| Building plan approvalFile: Plan Sanction 4.pdf | 2 Dec 2021 |
| Building plan approvalFile: Plan Sanction 5.pdf | 2 Dec 2021 |
| Building plan approvalFile: Plan Sanction 6.pdf | 2 Dec 2021 |
| Building plan approvalFile: Plan Sanction 7.pdf | 2 Dec 2021 |
| Building plan approvalFile: Plan Sanction 8.pdf | 2 Dec 2021 |
| Building plan approvalFile: Plan Sanction 9.pdf | 2 Dec 2021 |
| Building plan approvalFile: Plan Sanction 10.pdf | 2 Dec 2021 |
| Layout approvalFile: Plan Sanction 11.pdf | 2 Dec 2021 |
| Details of encumbrancesFile: No Encumbrance Declaration.pdf | 2 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: Plan Sanction 11.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Sanction 1.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Sanction 2.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Sanction 3.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Sanction 4.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Sanction 5.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Sanction 6.pdf | 2 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Sanction 7.pdf | 2 Dec 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Sun Sammruddhi Phase I | Gat No 490 Dhangarwadi Chopala Phata Shirwal Taluka Khandala Satara | 56 | Completed | Dec 2017 | Oct 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Satara
Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 89 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Sun Samruddhi Phase II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dhangarwadi1,100+ in Satara
GRAND AVENUE
ALANKAR REALITIES
Clover Windermere Phase -I
Amalfi Enterprise
PETALS
DINESH VASUDEV BHARGUDE
Nivaan Riviera
Riverfront Developers
AMBIKA VIHAR
MALEKAR TAMBE ASSOCIATES LLP
Quadra Town
Bhujbal Brothers Properties
See every Satara project, with the district possession charts
Builder: M/s Sun Developers
M/s Sun Developers has 1 registration on MahaRERA, including Sun Samruddhi Phase II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Satara district page.
Frequently asked questions
What are my rights if Sun Samruddhi Phase II is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sun Samruddhi Phase II?
The registered promoter entity is M/s Sun Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sun Samruddhi Phase II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sun Samruddhi Phase II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sun Samruddhi Phase II?
The professionals named in the filing: Architect: Rajendra Khire; Engineer: Goraknath Wavre; Chartered Accountant: P B Shah; Chartered Accountant: Parag Patwa and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sun Samruddhi Phase II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback