Home / Browse projects / Pune, Maharashtra / SUN PALMS

Registration lapsed No litigation declared Residential / Group Housing project

SUN PALMS

By SUN CORP

RG-MH-24425 · RERA P52100011146 · Last updated on MahaRERA portal: 2 Jul 2021

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
42 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 70%
1Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

SUN PALMS is a Residential / Group Housing project by SUN CORP in Pune, Maharashtra, registered with MahaRERA as P52100011146 on 31 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSUN PALMS
  • TypeResidential / Group Housing
  • Location
    • Old Mumbai-Pune Expressway
    • Varsoli Toll Naka
    • Varsoli
    • Mawal
    • Pune
    • 410401
  • Pincode410401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100011146
  • ReraGenie IDRG-MH-24425

Builder

  • NameSUN CORP
  • Entity typePartnership
  • PartnersSANKET PRAKASH SHETH, SAURABH PRAKASH SHETH
  • Declared earlier projects3 →

Key dates

34 months past promisethis monthRegisteredAug 2017PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings5 building records
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUN PALMS BUILDING INA20000
SUN PALMS BUILDING IINA20000
SUN PALMS BUILDING IIINA20000
SUN PALMS BUILDING IVNA20000
SUN PALMS BUILDING VNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 2 Jul 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

42 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 70%.

SUN PALMS BUILDING I82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SUN PALMS BUILDING II82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SUN PALMS BUILDING III82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SUN PALMS BUILDING IV82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SUN PALMS BUILDING V65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 2 Jul 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
CLUB HOUSE WITH SWIMMING POOL AND OTHER AMENITIESYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2835.0
Proposed, not sanctioned2,607 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANDIVALI WEST BRANCH NO 6 MANEK NAGAR M G ROAD KANDIVALI WEST MUMBAI 400067

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNILESH SASAWADE
EngineerSHAHNAWAZ NIYAZ AHMAD SIDDIQUI
Chartered AccountantAMIT T JAIN AND CO
PartnerRole in project
SUN CORP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000075095Manashanti New Way AshramSun Corp16/01/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Feb 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Feb 2021

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: Details of encumbrances.pdf2 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Sun Palms CC.pdf8 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf8 Feb 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sun Palms OC.pdf8 Feb 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Sun Palms-Society Registration Certificate.pdf8 Feb 2021
Layout approvalFile: Layout.pdf13 Feb 2019
Layout approvalFile: Open Space.pdf13 Feb 2019
Layout approvalFile: Row House 1 to 6.pdf13 Feb 2019
Layout approvalFile: Row House 7 to 17.pdf13 Feb 2019
Layout approvalFile: Row House 18 to 23.pdf13 Feb 2019
Layout approvalFile: Row House 24 to 27.pdf13 Feb 2019
Copy of the legal title reportFile: Title Report.pdf13 Feb 2019
Copy of Layout Approval (in case of layout)File: Layout.pdf13 Feb 2019
Copy of Layout Approval (in case of layout)File: Open Space.pdf13 Feb 2019
Copy of Layout Approval (in case of layout)File: Row House 1 to 6.pdf13 Feb 2019
Copy of Layout Approval (in case of layout)File: Row House 7 to 17.pdf13 Feb 2019
Copy of Layout Approval (in case of layout)File: Row House 18 to 23.pdf13 Feb 2019
Copy of Layout Approval (in case of layout)File: Row House 24 to 27.pdf13 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Feb 2019
Certificates of CA (Form 5)File: Mamta Nikunj Parmar - Sun Corp-ilovepdf-compressed.pdf24 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: cOMMENCEMENT Certificate.pdf19 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf30 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Dec 2017
Certificates of CA (Form 3)File: CA Certificate.pdf30 Dec 2017
Building plan approvalFile: CC.pdf3 Aug 2017
Layout approvalFile: copy of layout approval.pdf3 Aug 2017
PAN CardFile: Sun Corp Pan Card.pdf3 Aug 2017
Copy of the legal title reportFile: Title Certificate.pdf3 Aug 2017
Details of encumbrancesFile: FORM B Declaration.pdf3 Aug 2017
Copy of Layout Approval (in case of layout)File: copy of layout approval.pdf3 Aug 2017
Building Plan Approval (IOD)File: CC.pdf3 Aug 2017
Declaration in FORM BFile: FORM B Declaration.pdf3 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sun Palms.pdf3 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SunPalm MahaRERA Engineers Certificate 3-ilovepdf-compressed.pdf3 Aug 2017
Certificates of CA (Form 3)File: CA Certificate.pdf3 Aug 2017
Proforma of Allotment letterFile: Agreement and Allotment Declaration.pdf3 Aug 2017
OtherFile: PROPOSED LAYOUT PLAN.pdf3 Aug 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SUN MONTANATUNGARLI LONAVLA NEAR LAGOONA RESORT TALUKA MAVALPUNE14CompletedMay 2016Late, Aug 2016
SUN GLORYSUN GLORY OPP. JAIN DERASAR NEAR SWAPNALOK TUNGARLI LONAVALA 41040142CompletedJul 2012Late, Sep 2015
SUN HILLARYSTUNGARLI LONAVLA NEAR LAGOONA RESORT TALUKA MAVAL PUNE27CompletedJun 2009Late, Jun 2012

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUN PALMS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Varsoli Toll Naka13,700+ in Pune

2 kmSUN PALMSCompleted 12Lapsed / revoked 5Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: SUN CORP

SUN CORP has 1 registration on MahaRERA, including SUN PALMS. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SUN PALMS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SUN PALMS is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUN PALMS?

The registered promoter entity is SUN CORP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUN PALMS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SUN PALMS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SUN PALMS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUN PALMS?

The professionals named in the filing: Architect: NILESH SASAWADE; Engineer: SHAHNAWAZ NIYAZ AHMAD SIDDIQUI; Chartered Accountant: AMIT T JAIN AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUN PALMS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUN PALMS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUN PALMS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.