Home / Browse projects / Mumbai Suburban, Maharashtra / SUMIT GURUKRISHNA

Completed No litigation declared Residential / Group Housing project

SUMIT GURUKRISHNA

By Sumit Woods Limited

RG-MH-47373 · RERA P51800050062 · Last updated on MahaRERA portal: 22 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Staircases, 85%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

SUMIT GURUKRISHNA is a Residential / Group Housing project by Sumit Woods Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050062 on 13 Mar 2023. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameSUMIT GURUKRISHNA
  • TypeResidential / Group Housing
  • Location
    • SHAHAJI RAJE MARG
    • VILE PARLE EAST
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • RERA no.P51800050062
  • ReraGenie IDRG-MH-47373

Builder

  • NameSumit Woods Limited
  • Entity typeCompany
  • Managing DirectorMITARAM JANGID
  • DirectorsBHUSHAN NEMLEKAR, SUBODH NEMLEKAR
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredMar 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Mar 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUMIT GURUKRISHNANA118000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 85%.

SUMIT GURUKRISHNA: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 22 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,374 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SHRI GURUKRISHNA CHSLVileparleMumbai Suburban
VINAYAK GURAVVileparleMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI7684.17
Proposed, not sanctioned7,684 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFILMCITY ROAD, GOREGAON EAST MUMBAI 400063

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAUMIL JHAVERI
EngineerKAIWANT SHAH
Chartered AccountantVISHU KABRA
PartnerRole in project
Sumit Woods Limited-

Litigation declared3

CaseCourtStatus
1338/2016city civil court at Dindoshipending to be withdrawn
2169/2018High Court Mumbaipending to be withdrawn
L 29577/2022High Court Mumbaipending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Jul 2025

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Letter to RERA 22 07 2025.pdf22 Jul 2025
Status of ConveyanceFile: Form 2A Quality assurance 17 07 2025.pdf22 Jul 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Letter to RERA 22 07 2025.pdf22 Jul 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate 13 03 2025.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE Sumit Gurukrishna 31 12 24.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA SWL Gurukrishna Dec 24.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE pdf.pdf28 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Audit Report Sumit Gurukrishna 20222023.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sumit Gurukrishna CA cert Nov 2023.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sumit GuruKrishna Engg Cert sept 2023.pdf10 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sumit Gurukrishna Oct 2023 Arch cert.pdf25 Oct 2023
Disclosure of sold/ booked inventoryFile: Letter to RERA for Sold Unit Rev.pdf23 Feb 2023
CERSAI detailsFile: Letter to RERA for CERSAI Report 22022023.pdf23 Feb 2023
CERSAI detailsFile: CERSAI searchreport satam.pdf23 Feb 2023
CERSAI detailsFile: CERSAI searchreport vinod printers.pdf23 Feb 2023
CERSAI detailsFile: CERSAI searchreport dalvi.pdf23 Feb 2023
CERSAI detailsFile: CERSAI SearchReport poddar.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Letter to RERA form 3.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Revised 21-02-2023.pdf21 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Letter Sumit Gurukrishna.pdf15 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Plan Sumit Gurukrishna.pdf15 Feb 2023
Other - FinanceFile: Form 3 clarification letter.pdf15 Feb 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Letter.pdf23 Jan 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance Letter.pdf23 Jan 2023
Declaration about Commencement CertificateFile: Form D.pdf23 Jan 2023
Declaration in FORM BFile: Form B.pdf23 Jan 2023
Building plan approvalFile: 1.pdf20 Jan 2023
Building plan approvalFile: 2.pdf20 Jan 2023
Building plan approvalFile: 4.pdf20 Jan 2023
Building plan approvalFile: 5.pdf20 Jan 2023
Building plan approvalFile: 6.pdf20 Jan 2023
Building plan approvalFile: 7.pdf20 Jan 2023
Building plan approvalFile: 8.pdf20 Jan 2023
Building plan approvalFile: 9.pdf20 Jan 2023
Building plan approvalFile: 10.pdf20 Jan 2023
Building plan approvalFile: Details of Sactioned plan.pdf20 Jan 2023
Details of encumbrances concerned to FinanceFile: Finance Encumbrance certificate.pdf20 Jan 2023
Details of encumbrances concerned to FinanceFile: Undertaking Cum Encumberance Certificate Revi.pdf20 Jan 2023
Details of encumbrances concerned to LegalFile: Finance Encumbrance certificate.pdf20 Jan 2023
Details of encumbrances concerned to LegalFile: Undertaking Cum Encumberance Certificate Revi.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Details of Sactioned plan.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: BSN.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MRJ.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SRN.pdf20 Jan 2023
Proforma of Agreement for saleFile: Agreement for Sale RERA Highlighted Rev.pdf20 Jan 2023
Proforma of Allotment letterFile: RERA Allotment Letter RERA FINAL UPLOADED.pdf20 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account details.pdf20 Jan 2023
Deviation Report with respect to Allotment letterFile: No deviation allotment letter.pdf20 Jan 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT RERA REV.pdf20 Jan 2023
Declaration about Commencement CertificateFile: Form D.pdf12 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Form B.pdf12 Jan 2023
Proforma of Allotment letterFile: Draft of RERA Allotment Letter.pdf12 Jan 2023
Proforma of Agreement for saleFile: AOS.pdf12 Jan 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT.pdf12 Jan 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT.pdf12 Jan 2023
Layout approvalFile: IOD.pdf11 Jan 2023
Building plan approvalFile: IOD.pdf11 Jan 2023
PAN CardFile: SWLPAN.pdf11 Jan 2023
Copy of the legal title reportFile: Title report.PDF11 Jan 2023
Copy of Layout Approval (in case of layout)File: IOD.pdf11 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf11 Jan 2023
Declaration in FORM BFile: Form B.pdf11 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Jan.pdf11 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate Jan.pdf11 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank details.pdf11 Jan 2023

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SUMIT MOUNT BUILDING A AND BPONDA Ponda South Goa Goa39CompletedDec 2022Jun 2022
SUMIT MOUNT 5PONDA GOA12CompletedNov 2022Jul 2021
SUMIT BELLS, PLOT CGOA18CompletedJun 2021Jul 2020
GORIA MITASUGORIA BORIVALI WEST52CompletedDec 2017Oct 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUMIT GURUKRISHNA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILE PARLE EAST6,700+ in Mumbai Suburban

Builder: Sumit Woods Limited

Sumit Woods Limited has 3 registrations on MahaRERA, including Sumit One and SUMIT GURUKRISHNA. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SUMIT GURUKRISHNA is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUMIT GURUKRISHNA?

The registered promoter entity is Sumit Woods Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUMIT GURUKRISHNA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUMIT GURUKRISHNA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUMIT GURUKRISHNA?

The professionals named in the filing: Architect: SAUMIL JHAVERI; Engineer: KAIWANT SHAH; Chartered Accountant: VISHU KABRA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUMIT GURUKRISHNA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUMIT GURUKRISHNA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUMIT GURUKRISHNA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.