ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SUMERU HILLS

Registered No litigation declared Residential / Group Housing project

SUMERU HILLS

By TESCO REALTY LLP

RG-MH-18095 · RERA P51700066575 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 20%
64 of 87Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

SUMERU HILLS is a Residential / Group Housing project by TESCO REALTY LLP in Thane, Maharashtra, registered with MahaRERA as P51700066575 on 11 Jun 2024. Possession is promised by 31 Dec 2029. 23 of the 87 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSUMERU HILLS
  • TypeResidential / Group Housing
  • Location
    • NEAR OSWAL SCHOOL
    • KAMATGHAR
    • Bhiwandi (M Corp.)
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700066575
  • ReraGenie IDRG-MH-18095

Builder

  • NameTESCO REALTY LLP
  • Entity typePartnership
  • PartnersKISHOR SUKHRAJ JAIN, DIMPAL KUMARI NILESH JAIN, NITIN VIMALKUMAR JAIN, VINOD RAMNIKLAL JAIN, KAVITADEVI VIKRAMKUMAR MEHTA, REKHA CHANDRAPRAKASH LOHIA, PRAVINKUMAR DIPCHANDBHAI JAIN

Key dates

this monthRegisteredJun 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Current status

26%23 of 87 units booked
46.8%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUMERU HILLSNA302079887

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 20%.

SUMERU HILLS: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed189

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots189
Closed/Covered189

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,160 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jan 2026
LandownerVillageDistrict
KISHOR SUKHRAJ JAINBhiwandi (M Corp.)Thane
REKHA CHANDRAPRAKASH LOHIABhiwandi (M Corp.)Thane
PRAVINKUMARDIPCHANDBHAI JAINBhiwandi (M Corp.)Thane
DIMPALKUMARI NILESH JAINBhiwandi (M Corp.)Thane
KAVITADEVI VIKRAMKUMAR MEHTABhiwandi (M Corp.)Thane
NITIN VIMALKUMAR JAINBhiwandi (M Corp.)Thane
VINOD RAMNIKLAL JAINBhiwandi (M Corp.)Thane

Approvals and building plan

Sanctioning authorityBHIWANDI NIZAMPUR CITY MUNICIPAL CORPORATION
Permissible FSI18440.71
Proposed, not sanctioned18,441 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAshok Hotel, Bhiwandi-Kalyan Road, Kalyan Naka, Bhiwandi 421302
Estimated costRs 59.88 cr
Cost incurredRs 28.00 cr
Work done46.76%
BuildingWingEstimatedIncurred
SUMERU HILLSNARs 59.88 crRs 28.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectK K CONSULTANT Architect Fayyaz A Shaikh
EngineerK K CONSULTANT
Chartered AccountantC. P. LOHIA & CO. PARTNER SHIVKUMAR MENGJI
Chartered AccountantRAJNIKANT VADIGOPULLA
PartnerRole in project
TESCO REALTY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 Architect Certificate Q4.pdf28 Apr 2026
Withdrawal Update Form 2File: Form2 Engineer Certificate Q4.pdf28 Apr 2026
Withdrawal Update Form 3File: form 3 Q4.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1 Q1.pdf16 Feb 2026
Withdrawal Update Form 2File: Form2 Q1.pdf16 Feb 2026
Withdrawal Update Form 3File: FORM 3 TESCO REALTY LLP Q1 Signed.pdf16 Feb 2026
Withdrawal Update Form 1File: Form 1 Q1.pdf29 Jan 2026
Withdrawal Update Form 1File: Form 1 Q2.pdf29 Jan 2026
Withdrawal Update Form 1File: Form1 Q3.pdf29 Jan 2026
Withdrawal Update Form 1File: Form 1 Q1.pdf29 Jan 2026
Withdrawal Update Form 2File: Form2 Q1.pdf29 Jan 2026
Withdrawal Update Form 2File: Form2 Q2.pdf29 Jan 2026
Withdrawal Update Form 2File: Form2 Q3.pdf29 Jan 2026
Withdrawal Update Form 2File: Form2 Q1.pdf29 Jan 2026
Withdrawal Update Form 3File: FORM 3 TESCO REALTY LLP Q1 Signed.pdf29 Jan 2026
Withdrawal Update Form 3File: FORM 3 TESCO REALTY LLP Q2 Signed.pdf29 Jan 2026
Withdrawal Update Form 3File: FORM 3 TESCO REALTY LLP Q3 Signed.pdf29 Jan 2026
Withdrawal Update Form 3File: FORM 3 TESCO REALTY LLP Q1 Signed.pdf29 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf1 Dec 2025
Withdrawal Update Form 1File: form1 Sign.pdf7 Oct 2025
Withdrawal Update Form 2File: form 2 Sign_compressed (1).pdf7 Oct 2025
Withdrawal Update Form 3File: FORM 3 TESCO REALTY LLP 31032025 Sign new.pdf7 Oct 2025
Withdrawal Update Form 1File: Architect Certficate.pdf1 Oct 2025
Withdrawal Update Form 1File: Architect Certficate.pdf1 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf1 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf1 Oct 2025
Withdrawal Update Form 3File: FORM 3 TESCO REALTY LLP 31122024 Sign.pdf1 Oct 2025
Withdrawal Update Form 3File: FORM 3 TESCO REALTY LLP 31122024 Sign.pdf1 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TESCO REALTY LLP 30062024 Sign.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TESCO REALTY LLP 30092024 Sign.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TESCO REALTY LLP 31122024 Sign.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certficate.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf30 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate Finance.pdf14 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate Legal.pdf14 May 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate Finance.pdf14 May 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate Legal.pdf14 May 2024
Declaration in FORM BFile: Declaration in Form B.pdf14 May 2024
Other - LegalFile: Land Sale Deed Part 1.pdf8 May 2024
Other - LegalFile: Land Sale Deed Part 2.pdf8 May 2024
Other - LegalFile: Land Sale Deed Part 3.pdf8 May 2024
Other - LegalFile: Land Sale Deed Part 4.pdf8 May 2024
Other - LegalFile: Tesco realty LLP ferfar 7_12.pdf8 May 2024
Other - LegalFile: Mail Sent Screen Shot.pdf7 May 2024
Other - TechnicalFile: Annexure A - Declaration Cum Undertaking.pdf27 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Bank.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf25 Apr 2024
Layout approvalFile: Layout Plan Sumeru Hill.pdf19 Apr 2024
Building plan approvalFile: Commencement Certificate - Sumeru Hill.pdf19 Apr 2024
PAN CardFile: Tesco Realty LLP - Pan Card.pdf19 Apr 2024
Copy of the legal title reportFile: Legal Title Report.pdf19 Apr 2024
Copy of Layout Approval (in case of layout)File: Layout Plan Sumeru Hill.pdf19 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Commencement Certificate - Sumeru Hill.pdf19 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate - Sumeru Hill.pdf19 Apr 2024
Declaration about Commencement CertificateFile: Format D - Commencement Certificate.pdf19 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200303005627_For_Asset_Based_Search_03_04_2024_17_46_37_837.pdf19 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200303010572_For_Asset_Based_Search_03_04_2024_18_07_45_309.pdf19 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Kishor Jain.pdf19 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Rekha Lohia.pdf19 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Pravin Jain.pdf19 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Dimpal Jain.pdf19 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Kavita Devi Mehta.pdf19 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Nitin Jain.pdf19 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Vinod Jain.pdf19 Apr 2024
Proforma of Allotment letterFile: Allotment Letter.pdf19 Apr 2024
Proforma of Agreement for saleFile: Draft Agreement For Sale.pdf19 Apr 2024
Deviation Report with respect to Allotment letterFile: Deviation Respect to Allotment Letter.pdf19 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Model Copy of Agreement.pdf19 Apr 2024

How this compares with Thane

26%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUMERU HILLS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KAMATGHAR7,600+ in Thane

Builder: TESCO REALTY LLP

TESCO REALTY LLP has 1 registration on MahaRERA, including SUMERU HILLS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SUMERU HILLS is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUMERU HILLS?

The registered promoter entity is TESCO REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUMERU HILLS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUMERU HILLS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUMERU HILLS?

The professionals named in the filing: Architect: K K CONSULTANT Architect Fayyaz A Shaikh; Engineer: K K CONSULTANT; Chartered Accountant: C. P. LOHIA & CO. PARTNER SHIVKUMAR MENGJI; Chartered Accountant: RAJNIKANT VADIGOPULLA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUMERU HILLS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUMERU HILLS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUMERU HILLS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.