Home / Browse projects / Ratnagiri, Maharashtra / SUKRITI HOMESTAY-A BLDG
SUKRITI HOMESTAY-A BLDG
RG-MH-03170 · RERA P52800020870 · Last updated on MahaRERA portal: 31 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 67 months past the filed date
- Completion date moved by 4 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUKRITI HOMESTAY-A BLDG is a Residential / Group Housing project by CONCORD HOUSING in Ratnagiri, Maharashtra, registered with MahaRERA as P52800020870 on 15 May 2019. Possession was promised by 31 Mar 2021 and is now 67 months past that date. The completion date has moved by 4 months from the original filing.
At a glance
Project
- NameSUKRITI HOMESTAY-A BLDG
- TypeResidential / Group Housing
- Location
- Bhavani Nagar
- Karwanchiwadi
- Pomendi Bk.
- Ratnagiri
- 415612
- Pincode415612
- RERA no.P52800020870
- ReraGenie IDRG-MH-03170
Builder
- NameCONCORD HOUSING
- Entity typePartnership
- PartnersRANJITSINGH NANDLAL HOODA, NAVNEET HOODA, MANISH MADHAV BEDARKAR, SACHIN ARVIND TALATHI, MANDAR SHRIKRISHNA BEDARKAR
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on15 May 2019
- Promised completion31 Mar 2021
- Revised completionRevised to 31 Mar 2021 (originally 30 Nov 2020)
- Buildings1 building record
- Documents filed60 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SUKRITI HOMESTAY -A BLDG | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 31 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SUKRITI HOMESTAY -A BLDG: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 31 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed5
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAHESH VAMAN DAMLE |
| Partner | Role in project |
|---|---|
| CONCORD HOUSING | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe said project has been completed and Completion Certificate had been applied by us with Sub Divisional Office (Upvibhagiya Adhikari Karaykari) at prant of Ratnagiri on 28/10/2020. Attached herewith is the acknowledged letter stating the same. Also attached herewith is Certificate from Architect stating the status of the project. Since the completion was applied before the last expiry date and same is in process and taking time at the end of the said department hence this extension has been sought after only for three months.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Apr 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Apr 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 14 Aug 2024
Documents filed60
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: P52800020870_FileName_4_page-0001.pdf | 31 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 31032021.pdf | 22 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 30062021.pdf | 22 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 30092021.pdf | 22 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 31122021.pdf | 22 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ratnagiri form 5.pdf | 22 Nov 2024 |
| Building plan approvalFile: floor plan 1 and 2.pdf | 22 Oct 2024 |
| Building plan approvalFile: floor plan 4 tt 7.pdf | 22 Oct 2024 |
| Building plan approvalFile: floor plan 7.pdf | 22 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form4 - Architect Completion Certificate.pdf | 22 Oct 2024 |
| Certificates of CA (Form 3)File: 30062021.pdf | 22 Oct 2024 |
| Certificates of CA (Form 3)File: 30092021_compressed.pdf | 22 Oct 2024 |
| Certificates of CA (Form 3)File: 31032022_compressed.pdf | 22 Oct 2024 |
| Certificates of CA (Form 3)File: 31122021_compressed.pdf | 22 Oct 2024 |
| Building Plan Approval (IOD)File: floor plan 1 and 2.pdf | 22 Oct 2024 |
| Building Plan Approval (IOD)File: floor plan 4 tt 7.pdf | 22 Oct 2024 |
| Building Plan Approval (IOD)File: floor plan 7.pdf | 22 Oct 2024 |
| Declaration about Commencement CertificateFile: CC.pdf | 14 Aug 2024 |
| Declaration in FORM BFile: Affidavite cum declaration.pdf | 14 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: sold-unsold inventory (2).pdf | 14 Aug 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Final Completion Certificate.pdf | 14 Aug 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: DECLARATION OF SEPERATE BANK ACCOUNT (1).pdf | 14 Aug 2024 |
| OtherFile: Form4 - Architect Completion Certificate.pdf | 14 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 10042021.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 10072021.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 10102021.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 20122021.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 20102020.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 08102021.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 05072021.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 05042021.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 05012022.pdf | 13 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Site Engineer Certificate.pdf | 13 Aug 2024 |
| CERSAI detailsFile: Cersai Declaration.pdf | 23 Jul 2024 |
| Other - TechnicalFile: Declaration cum undertaking.pdf | 23 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_compressed.pdf | 6 Sep 2021 |
| Certificates of CA (Form 3)File: CA Certificate_compressed.pdf | 6 Sep 2021 |
| OtherFile: Completion Certificate of Bldg From Engineer_compressed.pdf | 6 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 31 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 31 Dec 2020 |
| Certificates of CA (Form 3)File: CA certificate _compressed.pdf | 31 Dec 2020 |
| OtherFile: NEW 7 12.PDF | 31 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 7 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 7 Mar 2020 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 7 Mar 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf | 19 Apr 2019 |
| Building plan approvalFile: Layout Plan.pdf | 15 Apr 2019 |
| Layout approvalFile: Layout Plan.pdf | 15 Apr 2019 |
| PAN CardFile: Pan Card.pdf | 15 Apr 2019 |
| Copy of the legal title reportFile: Search Title Report_1_10.pdf | 15 Apr 2019 |
| Copy of the legal title reportFile: Search Title Report_11_20.pdf | 15 Apr 2019 |
| Details of encumbrancesFile: No Encumbrance.PDF | 15 Apr 2019 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 15 Apr 2019 |
| Building Plan Approval (IOD)File: Layout Plan.pdf | 15 Apr 2019 |
| Declaration in FORM BFile: FROM B.pdf | 15 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 15 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate.pdf | 15 Apr 2019 |
| Certificates of CA (Form 3)File: CA Certificate_compressed.pdf | 15 Apr 2019 |
| Proforma of Allotment letterFile: Master_Agreement Draft_compressed_1_12.pdf | 15 Apr 2019 |
| Proforma of Allotment letterFile: Master_Agreement Draft_compressed_13_24.pdf | 15 Apr 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 60 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SUKRITI HOMESTAY-A BLDG on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Karwanchiwadi1,100+ in Ratnagiri
Navkar Enclave
Evergreen Associates
Kalpavriksha Heritage
Kalpavriksha Builders & Developers
LAXMI KEHSAV NAGAR PHASE II
DEEPAK YASHWANT SALVI
THE WIND
Arihant Vastu Nirman Pvt. Ltd
THE WOODLAND
Siddhivinayak Realty
AKAR VANAJU ESTATE
AKAR INFRASTRUCTURE
See every Ratnagiri project, with the district possession charts
Builder: CONCORD HOUSING
CONCORD HOUSING has 1 registration on MahaRERA, including SUKRITI HOMESTAY-A BLDG. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What does it mean that SUKRITI HOMESTAY-A BLDG shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SUKRITI HOMESTAY-A BLDG is delayed beyond 31 Mar 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUKRITI HOMESTAY-A BLDG?
The registered promoter entity is CONCORD HOUSING, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUKRITI HOMESTAY-A BLDG?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SUKRITI HOMESTAY-A BLDG?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUKRITI HOMESTAY-A BLDG?
The professionals named in the filing: Architect: MAHESH VAMAN DAMLE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUKRITI HOMESTAY-A BLDG?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback