ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / SUKHSAGAR

Registered No litigation declared Others project

SUKHSAGAR

By PRASHANT MANOHAR DINGANKAR

RG-MH-05514 · RERA P52800077534 · Last updated on MahaRERA portal: 25 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
8 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 50%
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

SUKHSAGAR is a Others project by PRASHANT MANOHAR DINGANKAR in Ratnagiri, Maharashtra, registered with MahaRERA as P52800077534 on 20 Aug 2024. Possession is promised by 31 Dec 2030.

At a glance

Project

  • NameSUKHSAGAR
  • TypeOthers
  • Location
    • TILAK ALI
    • Ratnagiri (M Cl)
    • Ratnagiri
    • 415612
  • Pincode415612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800077534
  • ReraGenie IDRG-MH-05514

Builder

  • NamePRASHANT MANOHAR DINGANKAR
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredAug 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Aug 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings4 building records
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA60000
B WINGNA40000
D WINGNA20000
C WINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 50%.

A WING47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING32%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes15%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
LAND DEVELOPMENTYes0%

Parking filed65

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots65
Closed/Covered65
BuildingClosed/CoveredTotal
A WING6262
B WING11
D WING11
C WING11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,731 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6201.0
Proposed, not sanctioned3,331 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHAREGHAT ROAD, OPP GEETA BHAVAN RATNAGIRI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGEETANJALI V MOTE
EngineerMANOJ S JOSHI
Chartered AccountantDHANASHRI KARMARKAR & ASSOCIATES
PartnerRole in project
PRASHANT MANOHAR DINGANKAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 31032026.pdf25 Jun 2026
Form 2File: form no 2 3132026.pdf25 Jun 2026
Form 3File: Apex form 3 31326.pdf25 Jun 2026
Disclosure of Sold and Booked InventoryFile: Inventory up to 31 march.pdf25 Jun 2026
Form 1File: Apex eng form 1 31122025.pdf1 Apr 2026
Form 2File: Form 2 Apex 311225.pdf1 Apr 2026
Form 3File: Apex Engineers Form 3_compressed.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory Apex 311225.pdf1 Apr 2026
Form 1File: Form 1 Architect Certificate_compressed.pdf20 Dec 2025
Form 2File: Form 2 Engineer Certificate.pdf20 Dec 2025
Form 3File: Apex engineers Form 3 30092025.pdf20 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold invetory.pdf20 Dec 2025
Form 1File: Form 1.pdf15 Nov 2025
Form 2File: Form 2.pdf15 Nov 2025
Form 3File: form3signed.pdf15 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf15 Nov 2025
Form 1File: Form 1 signed.pdf1 Aug 2025
Form 2File: Form 2 signed.pdf1 Aug 2025
Form 3File: FORM 3 Signed.pdf1 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf1 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30092024.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31122024.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SUKHSAGAR RERA CERTIFICATE.pdf28 Mar 2025
Copy of the legal title reportFile: Legal title report (1)_compressed.pdf13 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank declaration (1).pdf13 Aug 2024
Other - LegalFile: KHAREDI KHAT 1.pdf13 Aug 2024
Other - LegalFile: KHAREDIKHAT 2.pdf13 Aug 2024
Other - LegalFile: KHAREDIKHAT 3.pdf13 Aug 2024
Other - LegalFile: KHAREDIKHAT4.pdf13 Aug 2024
Other - LegalFile: KHAREDIKHAT 5.pdf13 Aug 2024
Other - TechnicalFile: Agreement for sale.pdf2 Aug 2024
Other - TechnicalFile: Plan Highlights.pdf2 Aug 2024
Other - TechnicalFile: 1310A1B UPLOAD.pdf2 Aug 2024
Other - TechnicalFile: Mail from Planning Authority.pdf2 Aug 2024
Building plan approvalFile: Declaration about Commencement Certificate Format D.pdf26 Jul 2024
Building plan approvalFile: REVISE ORDER.pdf26 Jul 2024
Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Encumbrances.pdf26 Jul 2024
Details of encumbrances concerned to FinanceFile: Self Declaration regarding Legal Encumbrances.pdf26 Jul 2024
Details of encumbrances concerned to LegalFile: Self Declaration Regarding Encumbrances.pdf26 Jul 2024
Details of encumbrances concerned to LegalFile: Self Declaration regarding Legal Encumbrances.pdf26 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: REVISE ORDER.pdf26 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Declaration about Commencement Certificate Format D.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER'S CERTIFICATE (1).pdf26 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank format B(1).pdf26 Jul 2024
Other - TechnicalFile: REVISE PLAN 1.pdf26 Jul 2024
Other - TechnicalFile: REVISE PLAN 2.pdf26 Jul 2024
Other - TechnicalFile: Regarding Deviations In allotment letter.pdf26 Jul 2024
Other - TechnicalFile: Deviation AFS.pdf26 Jul 2024
Other - TechnicalFile: Declaration about no CERSAI.pdf26 Jul 2024
Other - TechnicalFile: Annexure A.pdf26 Jul 2024
Declaration about Commencement CertificateFile: commencement certificate.pdf7 Mar 2024
Other - TechnicalFile: Annexture A.pdf7 Mar 2024
Other - TechnicalFile: Planning Authority.pdf7 Mar 2024
Other - TechnicalFile: DECLRATION AND PLAN.pdf26 Feb 2024
Other - TechnicalFile: Response to Query.pdf4 Jan 2024
Other - TechnicalFile: DECLRATION PLAN HIGHLIGHTS.pdf22 Nov 2023
Other - LegalFile: declaration.pdf7 Nov 2023
Proforma of Agreement for saleFile: ATS Draft.pdf5 Nov 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER WITH ANNEXTURE.pdf5 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Deviation for ATS.pdf5 Nov 2023
Details of encumbrances concerned to FinanceFile: Legal encumbrances.pdf13 Jun 2023
Details of encumbrances concerned to LegalFile: Legal encumbrances.pdf13 Jun 2023
Declaration in FORM BFile: FORM B.pdf13 Jun 2023
CERSAI detailsFile: CERSAI REPORT FINAL.pdf13 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other organization.pdf13 Jun 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment letter.pdf13 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf29 Apr 2023
Layout approvalFile: Layout Plan-1.pdf22 Apr 2023
Layout approvalFile: Layout Plan 2.pdf22 Apr 2023
PAN CardFile: PAN card (2).pdf22 Apr 2023
Details of encumbrances concerned to FinanceFile: No emcumbrances.pdf22 Apr 2023
Details of encumbrances concerned to LegalFile: No emcumbrances.pdf22 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout Plan-1.pdf22 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout Plan 2.pdf22 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: NA order.pdf22 Apr 2023

How this compares with Ratnagiri

15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep SUKHSAGAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TILAK ALI1,100+ in Ratnagiri

2 kmSUKHSAGARCompleted 54Lapsed / revoked 12Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 104 registered projects within 2 km.

Builder: PRASHANT MANOHAR DINGANKAR

PRASHANT MANOHAR DINGANKAR has 3 registrations on MahaRERA, including JUGAI GARDENS and USHA BHASKAR CHIPLUNKAR SANKUL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if SUKHSAGAR is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUKHSAGAR?

The registered promoter entity is PRASHANT MANOHAR DINGANKAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUKHSAGAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUKHSAGAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUKHSAGAR?

The professionals named in the filing: Architect: GEETANJALI V MOTE; Engineer: MANOJ S JOSHI; Chartered Accountant: DHANASHRI KARMARKAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUKHSAGAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUKHSAGAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUKHSAGAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.