Home / Browse projects / Sugee Renaissance

Registered No litigation declared Residential / Group Housing project

Sugee Renaissance

By Sugee Two Developers LLP

RG-MH-05437 · RERA P51900051597 · Last updated on MahaRERA portal: 2 May 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Sep 2026Possession promised1 month past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 71%
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

Sugee Renaissance is a Residential / Group Housing project by Sugee Two Developers LLP in Girgaon, 400004, registered with MahaRERA as P51900051597 on 27 Jun 2023. Possession was promised by 30 Sep 2026 and is now 1 months past that date.

At a glance

Project

  • NameSugee Renaissance
  • TypeResidential / Group Housing
  • Location
    • V. P. Road
    • Girgaon
    • 400004
  • Pincode400004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900051597
  • ReraGenie IDRG-MH-05437

Builder

  • NameSugee Two Developers LLP
  • Entity typePartnership
  • PartnersNishant Subhash Deshmukh, Nitin Ramchandra Varadkar

Key dates

1 months past promisethis monthRegisteredJun 2023PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed103 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sugee RenaissanceNA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 71%.

Sugee Renaissance: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure71%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area559 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4068.71
Proposed, not sanctioned4,069 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWorli Mumbai

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. Aakar Architects & Consultants
EngineerJW CONSULTANTS LLP
Chartered AccountantMeisheri Palani & Co
PartnerRole in project
Sugee Two Developers LLP-

Litigation declared2

CaseCourtStatus
20900/2022High CourtPending
1459/2016Small CausePending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 SUGEE RENAISSANCE MARCH 2026.pdf2 May 2026
Form 2File: RERA Form 2 as on 31032026 Sugee Renaissance.pdf2 May 2026
Form 3File: RERA Form 3 as on 31032026 Sugee Renaissance.pdf2 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory March 2026.pdf2 May 2026
Form 1File: form 1 dec 2025 sugee renaissance.pdf5 Feb 2026
Form 2File: form 2 dec 2025 sugee renaissance.pdf5 Feb 2026
Form 3File: form 3 dec 2025 sugee renaissance.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory Dec 2025.pdf5 Feb 2026
Form 1File: RERA Form 1 as on 31032025 Sugee Renaissance.pdf3 Jan 2026
Form 2File: RERA Form 2 as on 31032025 Sugee Renaissance.pdf3 Jan 2026
Form 3File: RERA Form 3 as on 31032025 Sugee Renaissance.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory March 2025.pdf3 Jan 2026
Form 1File: RERA Form 1 as on 30062025 Sugee Renaissance.pdf3 Jan 2026
Form 2File: RERA Form 2 as on 30062025 Sugee Renaissance.pdf3 Jan 2026
Form 3File: RERA Form 3 as on 30062025 Sugee Renaissance.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory June 2025.pdf3 Jan 2026
Form 1File: RERA Form 1 as on 30092025 Sugee Renaissance.pdf15 Dec 2025
Form 2File: RERA Form 2 as on 30092025 Sugee Renaissance.pdf15 Dec 2025
Form 3File: RERA Form 3 as on 30092025 Sugee Renaissance.pdf15 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for Inventory Sep 2025.pdf15 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for March 20254 (Sugee Renaissance).pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 as on 31122024 Sugee Renaissance.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 as on 31122024 Sugee Renaissance.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 31122024 Sugee Renaissance.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5 For FY 23-24- Sugee Renaissance.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for June 2024.pdf17 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 30092024 Sugee Renaissance.pdf17 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for June 2024.pdf17 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for Sep 2024.pdf17 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 for June 2024.pdf17 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 For Sep 2024.pdf17 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for March 2024.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 as on 31122023- Sugee Renaissance.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 31122023- Sugee Renaissance.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 31032024- Sugee Renaissance.pdf24 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RERA Form 2 as on 31122023- Sugee Renaissance.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 as on 31032024- Sugee Renaissance.pdf24 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf5 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 as on 31122023 Sugee Renaissance.pdf3 Feb 2024
Proforma of Agreement for saleFile: AFS GURUDADARKAR 19122023.pdf22 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 as on 30092023 Sugee Renaissance.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 as on 30092023 Sugee Renaissance.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 as on 30092023 Sugee Renaissance.pdf5 Dec 2023
Declaration in FORM BFile: Sugee Renaso Affidavit.pdf20 Jun 2023
Details of encumbrances concerned to FinanceFile: No Encrumbance Legal.pdf2 Jun 2023
Details of encumbrances concerned to LegalFile: No Encrumbance Legal.pdf2 Jun 2023
Details of encumbrances concerned to FinanceFile: Encrumbance Finance.pdf26 May 2023
Details of encumbrances concerned to LegalFile: Encrumbance Finance.pdf26 May 2023
Proforma of Agreement for saleFile: AFS_GuruDadarkar Building_20052023.pdf26 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation in AFS.pdf26 May 2023
CERSAI detailsFile: Declaration against CERSAI.pdf13 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Anmerure A NV.pdf18 Apr 2023
Layout approvalFile: 1 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: Sugee Heritage IOD.pdf13 Apr 2023
Building plan approvalFile: 2 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 3 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 4 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 5 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 6 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 7 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 8 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 9 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 10 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 11 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 12 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 13 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 14 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 15 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 16 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 17 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building plan approvalFile: 18 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
PAN CardFile: S2DLLP_Pan Card.pdf13 Apr 2023
Copy of the legal title reportFile: Guru-Dadarkar Building_Title Due Diligence Report_RERA.pdf13 Apr 2023
Copy of Layout Approval (in case of layout)File: 1 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Sugee Heritage IOD.pdf13 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 Guru Dadarkar Drawing_compressed.pdf13 Apr 2023

Keep Sugee Renaissance on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Girgaon

2 kmSugee RenaissanceCompleted 13Lapsed / revoked 24Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: Sugee Two Developers LLP

Sugee Two Developers LLP has 1 registration on MahaRERA, including Sugee Renaissance. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if Sugee Renaissance is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sugee Renaissance?

The registered promoter entity is Sugee Two Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sugee Renaissance?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sugee Renaissance?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sugee Renaissance?

The professionals named in the filing: Architect: M/s. Aakar Architects & Consultants; Engineer: JW CONSULTANTS LLP; Chartered Accountant: Meisheri Palani & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sugee Renaissance?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sugee Renaissance. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sugee Renaissance to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.