Home / Browse projects / Pune, Maharashtra / Sufal

Registered No litigation declared Residential / Group Housing project

Sufal

By KUSHIKA SANJEEVANI DEVELOPERS AND ROHIT SANJAY DESHPANDE

RG-MH-91630 · RERA P52100054481 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 7.00 crore secured on the land, in favour of DCB BANK LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 18Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 50%
41 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Sufal is a Residential / Group Housing project by KUSHIKA SANJEEVANI DEVELOPERS AND ROHIT SANJAY DESHPANDE in Pune, Maharashtra, registered with MahaRERA as P52100054481 on 25 Jan 2024. Possession is promised by 31 Dec 2026. 0 of the 41 units on this registration are recorded sold or booked, and 4 of 18 construction stages are filed complete.

At a glance

Project

  • NameSufal
  • TypeResidential / Group Housing
  • Location
    • Baner
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100054481
  • ReraGenie IDRG-MH-91630

Builder

  • NameKUSHIKA SANJEEVANI DEVELOPERS AND ROHIT SANJAY DESHPANDE
  • Entity typeOthers
  • PartnersTANAYA ASHOK TUPE, SAKSHI SANGRAM PATIL
  • Named personsRohit Sanjay Deshpande, Sakshi Sangram Patil, Tanaya Ashok Tupe

Key dates

this monthRegisteredJan 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed71 files

Current status

0%0 of 41 units booked
34.7%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SufalWING - A8727027
SufalWING - B8714014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

Sufal · wing WING - A28%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Sufal · wing WING - B28%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered48
Stilt / Ground27
BuildingClosed/CoveredStilt / GroundTotal
Sufal WING - A48048
Sufal WING - B02727

Land and ownership6

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared present
Charge in favour ofDCB BANK LIMITED
Secured amountRs 7.00 crore
CERSAI search filedYes
Declared on17 Feb 2026
LandownerVillageDistrict
Preeti Abhijeet BhandeThane (M Corp.)Thane
Abhijeet Tulshiram BhandeThane (M Corp.)Thane
Ketaki Kiran KulkarniPune (M Corp.)Pune
Nikhil Kiran KulkarniPune (M Corp.)Pune
Archana Satish KhadakeThane (M Corp.)Thane
Bharti Anil PawarPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI3422.82
Proposed, not sanctioned3,422 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchROHIT BUILDING, OFF J.M.ROAD,DECCAN GYMKHANA,PUNE 411 004
Estimated costRs 11.82 cr
Cost incurredRs 4.10 cr
Work done34.71%
BuildingWingEstimatedIncurred
SufalWING - ARs 11.82 crRs 4.10 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrakash Kulkarni and Associates
EngineerNilesh Gujar
EngineerKamal Jamal Abdul Hamid
Chartered AccountantPhule Wagh and Associates LLP
PartnerRole in project
KUSHIKA SANJEEVANI DEVELOPERS AND ROHIT SANJAY DESHPANDE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Nov 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: SUFAL- Q-4- Form 1 -RERA.pdf7 May 2026
Withdrawal Update Form 2File: SUFAL - Q-4 - Form 2 -RERA.pdf7 May 2026
Withdrawal Update Form 3File: SUFAL - FORM 3 -RERA Q-4.pdf7 May 2026
Form 2A (FY 2023-2024)File: Form 2A-FY 2023-24.pdf27 Feb 2026
Layout approvalFile: Plan Sheet - 01-02.pdf26 Feb 2026
Building plan approvalFile: Plan Sheet - 02-02.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Sufal 31122025.pdf24 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Sufal 31122025.pdf24 Feb 2026
Withdrawal Update Form 3File: Form 3 Chartered Accountant Certificate Sufal 31122025.pdf24 Feb 2026
Layout approvalFile: Plan Sheet - 01-02.pdf15 Nov 2025
Layout approvalFile: Plan Sheet - 02-02.pdf15 Nov 2025
Commencement certificateFile: Commencement Certificate.pdf15 Nov 2025
Withdrawal Update Form 1File: Q-2 Kushika Sanjeevnai- Form 1.pdf15 Nov 2025
Withdrawal Update Form 2File: Q-2 Kushika Sanjeevani - Form 2.pdf15 Nov 2025
Withdrawal Update Form 3File: Q2 FINAL Sufal FORM 3 Chartered Accountant Certificate.pdf15 Nov 2025
Form 1File: Form 1 Q4 FY 2024-25.pdf19 Jul 2025
Form 2File: Form 2 Q4 FY 2024-25.pdf19 Jul 2025
Form 3File: Q4 FINAL Sufal FORM 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Q4 FY 2024-25.pdf19 Jul 2025
Form 1File: Form 1 Q1 FY 2025-26.pdf19 Jul 2025
Form 2File: Form 2 Q1 FY 2025-26.pdf19 Jul 2025
Form 3File: Q1 FINAL Sufal FORM 3 Q1 FY 2025-26.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Q1 FY 2025-26.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 21022025 scan compressed.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration no progress Q1 FY 24-25.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration no progress Q2 FY 24-25.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration no progress Q1 FY 24-25.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration no progress Q2 FY 24-25.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Annexure C - Form 2A.pdf18 Feb 2025
Other - FinanceFile: Self Declaration - Joint Project Finance Query.pdf12 Jan 2024
Other - FinanceFile: Self Declaration - Bank use.pdf12 Jan 2024
Proforma of Agreement for saleFile: AFS 28122023.pdf28 Dec 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION LETTER - Sufal agreement.pdf28 Dec 2023
Other - LegalFile: FIRM NAME CHANGE.pdf28 Dec 2023
Other - FinanceFile: FIRM NAME CHANGE.pdf28 Dec 2023
Other - TechnicalFile: FIRM NAME CHANGE.pdf28 Dec 2023
Declaration in FORM BFile: Form B Promoters.pdf14 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seperate bank account as per order 34.pdf14 Dec 2023
Layout approvalFile: sheet 1.PDF13 Dec 2023
Layout approvalFile: sheet 2.PDF13 Dec 2023
Layout approvalFile: Temp00030.PDF13 Dec 2023
Building plan approvalFile: sheet 1.PDF13 Dec 2023
Building plan approvalFile: sheet 2.PDF13 Dec 2023
PAN CardFile: PAN.pdf13 Dec 2023
Copy of the legal title reportFile: Format A.pdf13 Dec 2023
Copy of the legal title reportFile: annexure.pdf13 Dec 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf13 Dec 2023
Details of encumbrances concerned to FinanceFile: encumbrance legal.pdf13 Dec 2023
Details of encumbrances concerned to LegalFile: Encumbrance Finance.pdf13 Dec 2023
Details of encumbrances concerned to LegalFile: encumbrance legal.pdf13 Dec 2023
Copy of Layout Approval (in case of layout)File: sheet 1.PDF13 Dec 2023
Copy of Layout Approval (in case of layout)File: sheet 2.PDF13 Dec 2023
Copy of Layout Approval (in case of layout)File: Temp00030.PDF13 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: sheet 1.PDF13 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: sheet 2.PDF13 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Sufal Commencement Certificate.pdf13 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC name change.pdf13 Dec 2023
Declaration about Commencement CertificateFile: Format D.pdf13 Dec 2023
CERSAI detailsFile: Cersai.pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL Sufal FORM 3 Chartered Accountant Certificate 07122023.pdf13 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure rsd partner.pdf13 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure sp.pdf13 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure tupe.pdf13 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure rsd.pdf13 Dec 2023
Proforma of Allotment letterFile: allotment letter.pdf13 Dec 2023
Deviation Report with respect to Allotment letterFile: Deviation allotment letter.pdf13 Dec 2023
Other - LegalFile: Joint Promoter Info declaration.pdf13 Dec 2023
Other - TechnicalFile: Joint Promoter Info declaration.pdf13 Dec 2023
Other - TechnicalFile: CC name change.pdf13 Dec 2023

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sufal on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Baner13,700+ in Pune

Builder: KUSHIKA SANJEEVANI DEVELOPERS AND ROHIT SANJAY DESHPANDE

KUSHIKA SANJEEVANI DEVELOPERS AND ROHIT SANJAY DESHPANDE has 1 registration on MahaRERA, including Sufal. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sufal is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sufal?

The registered promoter entity is KUSHIKA SANJEEVANI DEVELOPERS AND ROHIT SANJAY DESHPANDE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sufal?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sufal?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sufal?

The professionals named in the filing: Architect: Prakash Kulkarni and Associates; Engineer: Nilesh Gujar; Engineer: Kamal Jamal Abdul Hamid; Chartered Accountant: Phule Wagh and Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sufal?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sufal. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sufal to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.