ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SUDARSHAN RESIDENCY

Registered No litigation declared Residential / Group Housing project

SUDARSHAN RESIDENCY

By NATHAJI RAMBHAU BORKAR

RG-MH-47141 · RERA P52100052877 · Last updated on MahaRERA portal: 16 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Podiums (if any), 50%
18 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

SUDARSHAN RESIDENCY is a Residential / Group Housing project by NATHAJI RAMBHAU BORKAR in Pune, Maharashtra, registered with MahaRERA as P52100052877 on 5 Oct 2023. Possession is promised by 1 Dec 2028. 0 of the 18 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSUDARSHAN RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • SINHAGAD ROAD
    • DHAYRI
    • Dhayari (Part)
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • RERA no.P52100052877
  • ReraGenie IDRG-MH-47141

Builder

  • NameNATHAJI RAMBHAU BORKAR
  • Entity typeIndividual

Key dates

this monthRegisteredOct 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion1 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed116 files

Current status

0%0 of 18 units booked
17.4%Work done, per cost certificate

Figures as on 16 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUDARSHAN RESIDENCYNA7518018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 50%.

SUDARSHAN RESIDENCY: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor50%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered29

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area700 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Mar 2026

Approvals and building plan

Sanctioning authorityPMC PUNE
Permissible FSI1232.0
Proposed, not sanctioned1,225 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSINHAGAD ROAD PUNE 51
Estimated costRs 2.75 cr
Cost incurredRs 47.76 lakh
Work done17.37%
BuildingWingEstimatedIncurred
SUDARSHAN RESIDENCYNARs 2.50 crRs 42.00 lakh
-NARs 25.00 lakhRs 5.76 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNAVANATH DINKAR JARAG
EngineerN D JARAG & ASSOCIATE
EngineerABHINANDAN MANSINGRAO NALAWADE
Chartered AccountantANIKET JADHAV & CO
Chartered AccountantOMKAR CHANDGE
Chartered AccountantPooja Balu Phapale
PartnerRole in project
NATHAJI RAMBHAU BORKAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Dec 2028

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: PLAN 1.pdf16 Apr 2026
Building plan approvalFile: PLAN 2.pdf16 Apr 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (1).pdf16 Apr 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf16 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf16 Apr 2026
Form 5 (FY 2025-2026)File: Form 5 25-26 online.pdf10 Apr 2026
Withdrawal Update Form 1File: Architecture Certificate.pdf11 Feb 2026
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf11 Feb 2026
Withdrawal Update Form 3File: C A Certificate.pdf11 Feb 2026
Withdrawal Update Form 1File: form 1.pdf12 Nov 2025
Withdrawal Update Form 1File: form 1.pdf12 Nov 2025
Withdrawal Update Form 2File: form 2.pdf12 Nov 2025
Withdrawal Update Form 2File: form 2.pdf12 Nov 2025
Withdrawal Update Form 3File: ca - converted.pdf12 Nov 2025
Withdrawal Update Form 3File: ca - converted.pdf12 Nov 2025
Form 1File: form 1.pdf7 Nov 2025
Form 2File: form 2.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold.pdf7 Nov 2025
Form 3File: form 3 - converted.pdf7 Nov 2025
Form 2A (FY 2023-2024)File: 2A 22-23.pdf1 Aug 2025
Form 2A (FY 2024-2025)File: 2A 22-23.pdf1 Aug 2025
Form 2A (FY 2025-2026)File: 2A 23-24.pdf1 Aug 2025
Form 5 (FY 2023-2024)File: FORM 5 23-24.pdf26 Jul 2025
Form 5 (FY 2024-2025)File: FORM 5 24-25.pdf26 Jul 2025
Form 3File: CA FORM FORM 3.pdf15 Jul 2025
Form 1File: FORM 1 AR.pdf15 Jul 2025
Form 2File: engineer form 2.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: सोल्ड.pdf15 Jul 2025
Form 1File: archi form 1.pdf15 Jul 2025
Form 2File: eng.pdf15 Jul 2025
Form 3File: ca - converted.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold.pdf15 Jul 2025
Form 1File: archi form 1.pdf15 Jul 2025
Form 2File: eng.pdf15 Jul 2025
Form 3File: ca - converted.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold.pdf15 Jul 2025
Form 1File: ARCH.pdf15 Jul 2025
Form 3File: CA.pdf15 Jul 2025
Form 2File: ENG.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD.pdf15 Jul 2025
Form 1File: arch.pdf15 Jul 2025
Form 2File: eng.pdf15 Jul 2025
Form 3File: ca.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold.pdf15 Jul 2025
Form 1File: ARCH.pdf15 Jul 2025
Form 2File: ENG.pdf15 Jul 2025
Form 3File: CA.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD.pdf15 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: eng form 2a.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: sold.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: sold.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca - converted.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: eng form 2a.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: sold.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: sold.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca - converted.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca - converted.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: sold.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: sold.pdf20 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: eng form 2a.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf7 Oct 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUDARSHAN RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHAYRI13,700+ in Pune

Builder: NATHAJI RAMBHAU BORKAR

NATHAJI RAMBHAU BORKAR has 1 registration on MahaRERA, including SUDARSHAN RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SUDARSHAN RESIDENCY is delayed beyond 1 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUDARSHAN RESIDENCY?

The registered promoter entity is NATHAJI RAMBHAU BORKAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUDARSHAN RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUDARSHAN RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUDARSHAN RESIDENCY?

The professionals named in the filing: Architect: NAVANATH DINKAR JARAG; Engineer: N D JARAG & ASSOCIATE; Engineer: ABHINANDAN MANSINGRAO NALAWADE; Chartered Accountant: ANIKET JADHAV & CO; Chartered Accountant: OMKAR CHANDGE; Chartered Accountant: Pooja Balu Phapale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUDARSHAN RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUDARSHAN RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUDARSHAN RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.