Home / Browse projects / Thane, Maharashtra / SUDAMA REGENCY BUILDING NO 2,3,4
SUDAMA REGENCY BUILDING NO 2,3,4
By SHREE SIDDHIVINAYAK ENTERPRISES
RG-MH-12204 · RERA P51700001217 · Last updated on MahaRERA portal: 30 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 6 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUDAMA REGENCY BUILDING NO 2,3,4 is a Others project by SHREE SIDDHIVINAYAK ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700001217 on 27 Jul 2017. Possession was promised by 29 Dec 2024 and is now 22 months past that date. The completion date has moved by 12 months from the original filing. 6 complaints are on record with the regulator.
At a glance
Project
- NameSUDAMA REGENCY BUILDING NO 2,3,4
- TypeOthers
- Location
- Diva Shill Road
- Khardi Pada
- Thane (M Corp.)
- Thane
- 400612
- Pincode400612
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700001217
- ReraGenie IDRG-MH-12204
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on27 Jul 2017
- Promised completion29 Dec 2024
- Revised completionRevised to 29 Dec 2024 (originally 30 Dec 2023)
- Buildings3 building records
- Documents filed132 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SUDAMA REGENCY BUILDING NO 2 | NA | 24 | 0 | 0 | 0 | 0 |
| SUDAMA REGENCY BUILDING NO 3 | NA | 24 | 0 | 0 | 0 | 0 |
| SUDAMA REGENCY BUILDING NO 4 | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 43%.
SUDAMA REGENCY BUILDING NO 242%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 39% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 13% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 7% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SUDAMA REGENCY BUILDING NO 342%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 13% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 7% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SUDAMA REGENCY BUILDING NO 442%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 43% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 14% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 7% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 15% |
| Street Lighting | Yes | 50% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 25% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 15% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed71
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| SUDAMA REGENCY BUILDING NO 2 | 1 | 22 | 23 |
| SUDAMA REGENCY BUILDING NO 3 | 1 | 22 | 23 |
| SUDAMA REGENCY BUILDING NO 4 | 1 | 24 | 25 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAMA DINKAR MHATRE | Thane (M Corp.) | Thane |
| SAVITRI SUDAM PATIL | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAKARAND TORASKAR ASSOCIATES |
| Engineer | AJAY MAHALE AND ASSOCIATES |
| Chartered Accountant | Ms Singh Ranjan & Co |
| Partner | Role in project |
|---|---|
| SHREE SIDDHIVINAYAK ENTERPRISES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project was started prior to outbreak of COVID-19, which had an impact on real estate project for nearly 2 years, from March 2020 to February 2022 which has severely impacted the availability of labor and disrupted the supply chain, causing significant delays in the construction activities. This has resulted in slow progress in construction.Hence we request you to grant the extension.
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000054718 | Bhavanj Kanji Shah | Shree Siddhivinayak Enterprises | 01/06/2018 |
| CC006000000054721 | Jigna A. Shah | Shree Siddhivinayak Enterprises | 01/06/2018 |
| CC12500748 | Ashwin Bhavanji Shah | SHREE SIDDHIVINAYAK ENTERPRISES | 05/03/2025 |
| CC12500745 | Jigna Ashwin Shah | SHREE SIDDHIVINAYAK ENTERPRISES | 05/03/2025 |
| CC12500750 | Maitri Ashwin Shah | SHREE SIDDHIVINAYAK ENTERPRISES | 05/03/2025 |
| CC12500942 | Jigna Ashwin Shah | SHREE SIDDHIVINAYAK ENTERPRISES | 18/03/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed132
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 (31-12-2023).pdf | 30 May 2026 |
| Form 2File: Form 2 (31-12-2023).pdf | 30 May 2026 |
| Form 3File: Form 3 (31-12-2023).pdf | 30 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Booked and sold (31-12-2023).pdf | 30 May 2026 |
| Form 1File: Form 1 (30-09-2023).pdf | 30 May 2026 |
| Form 2File: Form 2 (30-09-2023).pdf | 30 May 2026 |
| Form 3File: Form 3 (30-09-2023).pdf | 30 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Booked and sold (30-09-2023).pdf | 30 May 2026 |
| Form 1File: Form 1(31-12-2023).pdf | 30 May 2026 |
| Form 2File: Form 2 (31-12-2023).pdf | 30 May 2026 |
| Form 3File: Form 3 (31-12-2023).pdf | 30 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Booked and sold (31-12-2023).pdf | 30 May 2026 |
| Form 1File: Form 1 Dec 2024.pdf | 25 May 2026 |
| Form 2File: Form 2(31-12-2024).pdf | 25 May 2026 |
| Form 3File: Form 3(31-12-2024).pdf | 25 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Booked and sold (31-12-2024).pdf | 25 May 2026 |
| Form 1File: Form 1 Sep 2024.pdf | 25 May 2026 |
| Form 2File: Form 2(30-09-2024).pdf | 25 May 2026 |
| Form 3File: Form 3 (30-09-2024).pdf | 25 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Booked and sold (30-09-2024).pdf | 25 May 2026 |
| Form 1File: Form 1 June 2024.pdf | 25 May 2026 |
| Form 2File: Form 2(30-06-2024).pdf | 25 May 2026 |
| Form 3File: Form 3 (30-06-2024).pdf | 25 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Booked and sold (30-06-2024).pdf | 25 May 2026 |
| Form 1File: Form 1 Mar 2024.pdf | 25 May 2026 |
| Form 2File: Form 2(31-03-2024).pdf | 25 May 2026 |
| Form 3File: Form 3(31-03-2024).pdf | 25 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Booked and sold (1-4-2024).pdf | 25 May 2026 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 6 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: Self Declaration-SSE.pdf | 13 Jan 2025 |
| CERSAI detailsFile: Aeest Based Report- SSE.pdf | 13 Jan 2025 |
| CERSAI detailsFile: Debtor Based Report- SSE.pdf | 13 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Self Declaration-SSE.pdf | 13 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Siddhivinayak Enterprises.pdf | 2 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Intrest-SSE.pdf | 1 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Revised Sold Unsold inventory dec 23.pdf | 22 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 31-12-2023 SSE.pdf | 22 Feb 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC- SSE.pdf | 6 Feb 2024 |
| Declaration in FORM BFile: Form B SSE.pdf | 5 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shree Siddhivinayak Enterprises Form 1.pdf | 3 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shree Siddhivinayak Enterprises Form 1 For QE Dec-23_removed.pdf | 3 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Shree Siddhivianayak Enterprises - sold-unsold.pdf | 3 Feb 2024 |
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-unsold Inventory SSE.pdf | 3 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 30-09-2023.pdf | 3 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 SSE sept 23.pdf | 26 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 SSE june 23.pdf | 26 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHREE SIDDHIVINAYAK SUDAMA REGENCY RERA.pdf | 11 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SHREE SIDDHIVINAYAK SUDAMA REGENCY RERA JUNE.pdf | 11 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Shree Siddhivinayak Enterprises Form 2A.pdf | 11 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 31-03-2023.pdf | 11 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 30-06-2023.pdf | 11 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SSE Form 5 FY 22-23 Sign.pdf | 7 Dec 2023 |
| Building plan approvalFile: 8TH to 12 TH FLOOR PLAN (1).pdf | 21 Aug 2023 |
| Building plan approvalFile: 17TH to 22ND (REFUGE) FLOOR PLAN.pdf | 21 Aug 2023 |
| Building plan approvalFile: 18TH TO 21ST FLOOR PLAN (1).pdf | 21 Aug 2023 |
| Building plan approvalFile: 2ND FLOOR PLAN.pdf | 21 Aug 2023 |
| Building plan approvalFile: TYPICAL FLOOR PLAN------.pdf | 21 Aug 2023 |
| Building Plan Approval (IOD)File: 2ND FLOOR PLAN.pdf | 21 Aug 2023 |
| Building Plan Approval (IOD)File: TYPICAL FLOOR PLAN------.pdf | 21 Aug 2023 |
| Building Plan Approval (IOD)File: 8TH to 12 TH FLOOR PLAN (1).pdf | 21 Aug 2023 |
| Building Plan Approval (IOD)File: 17TH to 22ND (REFUGE) FLOOR PLAN.pdf | 21 Aug 2023 |
| Building Plan Approval (IOD)File: 18TH TO 21ST FLOOR PLAN (1).pdf | 21 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-12-2022 updated.pdf | 16 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 31-01-2023.pdf | 16 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SSE Form 2 31-03-2022.pdf | 6 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SSE Form 2 30-06-2022.pdf | 6 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SSE Form 2 30-09-2022.pdf | 6 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SSE Form 2 31-03-2022.pdf | 6 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SSE Form 2 31-12-2022.pdf | 6 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-20.pdf | 6 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf | 6 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5-2020-21.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: From 5 21-22.pdf | 6 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of No Encumbrances - Legal.pdf | 17 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of No Encumbrances - Legal.pdf | 17 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for Real Estate Projects.pdf | 17 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation Report for Allotment Letter.pdf | 17 Feb 2023 |
| Deviation Report with respect to model copy of AgreementFile: No Deviation Report for Agreement for Sale.pdf | 17 Feb 2023 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SUDAMA REGENCY BUILDING NO 8 | KHARDI PADA DIVA SHILL ROAD DAWALE VILLAGE THANE 400 612 | 56 | Completed | Mar 2017 | Late, Apr 2017 |
| SUDAMA REGENCY BUILDING NO 6, 7 | KHARDI PADA DIVA SHILL ROAD DAWALE VILLAGE THANE 400 612 | 84 | Completed | Dec 2015 | Late, Jan 2016 |
| SUDAMA REGENCY BUILDING NO 9 , 10 | KHARDI PADA DIVA SHILL ROAD DAWALE VILLAGE THANE 400 612 | 84 | Completed | May 2015 | Late, Aug 2015 |
| SUDAMA REGENCY BUILDING NO 11,12,13,14 | KHARDI PADA DIVA SHILL ROAD DAWALE VILLAGE THANE 400 612 | 154 | Completed | Oct 2014 | Sep 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 132 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SUDAMA REGENCY BUILDING NO 2,3,4 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Khardi Pada7,600+ in Thane
Filed coordinates, straight-line distance. 73 registered projects within 2 km.
DOSTI PLANET NORTH - SECTOR 3
CHALAMA INFRAPROPERTIES PRIVATE LIMITED
NICE WORLD 1
NICE BUILDERS
CENTRAL PARK
HARMAIN ENTERPRISES
MUKTA GHARONDA
SKYLARK INFRASTRUCTURES
Palm Riveria
YES REALTY
Trinity Paradise Phase 1
Trinity Builders
See every Thane project, with the district possession charts
Builder: SHREE SIDDHIVINAYAK ENTERPRISES
SHREE SIDDHIVINAYAK ENTERPRISES has 6 registrations on MahaRERA, including SUDAMA REGENCY BUILDING NO 1, 5 and SUDAMA REGENCY BUILDING NO 2,3,4. Its filings disclose 4 earlier MahaRERA projects: declares 1 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that SUDAMA REGENCY BUILDING NO 2,3,4 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SUDAMA REGENCY BUILDING NO 2,3,4 is delayed beyond 29 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUDAMA REGENCY BUILDING NO 2,3,4?
The registered promoter entity is SHREE SIDDHIVINAYAK ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUDAMA REGENCY BUILDING NO 2,3,4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SUDAMA REGENCY BUILDING NO 2,3,4?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SUDAMA REGENCY BUILDING NO 2,3,4?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUDAMA REGENCY BUILDING NO 2,3,4?
The professionals named in the filing: Architect: MAKARAND TORASKAR ASSOCIATES; Engineer: AJAY MAHALE AND ASSOCIATES; Chartered Accountant: Ms Singh Ranjan & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUDAMA REGENCY BUILDING NO 2,3,4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback