Home / Browse projects / Satara, Maharashtra / STERLING RESIDENCY BUILDING C5 AND C6

Registered No litigation declared Residential / Group Housing project

STERLING RESIDENCY BUILDING C5 AND C6

By Sterling Developers

RG-MH-32764 · RERA PR1301012500292 · Last updated on MahaRERA portal: 16 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 6.00 crore secured on the land, in favour of RAJARAMBAPU SAHAKARI BANK LTD
  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedno revision filed
4 of 16Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 30%
56 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 12 documents Report an error

STERLING RESIDENCY BUILDING C5 AND C6 is a Residential / Group Housing project by Sterling Developers in Satara, Maharashtra, registered with MahaRERA as PR1301012500292 on 16 Jul 2025. Possession is promised by 30 Sep 2027. 0 of the 56 units on this registration are recorded sold or booked, and 4 of 16 construction stages are filed complete.

At a glance

Project

  • NameSTERLING RESIDENCY BUILDING C5 AND C6
  • TypeResidential / Group Housing
  • Location
    • Shirwal
    • Khandala
    • Satara
    • 412801
  • Pincode412801
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1301012500292
  • ReraGenie IDRG-MH-32764

Builder

  • NameSterling Developers
  • Entity typePartnership
  • PartnersJayant Shamrao Arbatti, Harsh Pradeep Kumar Naredi
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2025PromisedSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jul 2025
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed12 files

Current status

0%0 of 56 units booked
24.7%Work done, per cost certificate

Figures as on 16 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building C5NA8728028
Building C6NA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 16 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 30%.

Building C529%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building C629%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Stilt / Ground72
BuildingStilt / GroundTotal
Building C53636
Building C63636

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,550 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofRAJARAMBAPU SAHAKARI BANK LTD
Secured amountRs 6.00 crore
CERSAI search filedYes
Declared on1 Jul 2025
LandownerVillageDistrict
Pradeep Mahadev BhosalePune (M Corp.)Pune
Late Anandrao Marutrao Pisal through Pushpalata Anandrao PisalPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityCollector Office, Satara
Permissible FSI14260.84
Proposed, not sanctioned3,545 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE,SHOP NO.101 TO 104,VISHVESHWAR BANK CHOWK,DHANKAWADI,PUNE.411043
Estimated costRs 8.91 cr
Cost incurredRs 2.20 cr
Work done24.68%
BuildingWingEstimatedIncurred
Building C5NARs 4.25 crRs 1.10 cr
Building C6NARs 4.25 crRs 1.10 cr
-NARs 41.26 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectChandrashekhar V Pawar
EngineerAnkit Kumar
EngineerMukund Ghadge
Chartered AccountantA B M S & Associates
Chartered AccountantDJS & Associates
PartnerRole in project
Sterling Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jun 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed12

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: STerling Developers Architect Certificate Form 1 Signed.pdf16 May 2026
Withdrawal Update Form 2File: Form 2 Signed.pdf16 May 2026
Withdrawal Update Form 3File: Sterling Developers CA Certificate Signed march 26.pdf16 May 2026
Withdrawal Update Form 1File: Form 1 dated 051025.pdf27 Feb 2026
Withdrawal Update Form 1File: Form 1 dated 050126.pdf27 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf27 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf27 Feb 2026
Withdrawal Update Form 3File: Form 3 Sept 25.pdf27 Feb 2026
Withdrawal Update Form 3File: Form 3 DEC 25.pdf27 Feb 2026
Layout approvalFile: Layout.pdf5 Jun 2025
Building plan approvalFile: Plan.pdf5 Jun 2025
Declaration and undertaking (Annexure A)File: Annexure A.pdf5 Jun 2025

How this compares with Satara

0%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep STERLING RESIDENCY BUILDING C5 AND C6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khandala1,100+ in Satara

2 kmSTERLING RESIDENCY BUILDCompleted 6Lapsed / revoked 10Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: Sterling Developers

Sterling Developers has 2 registrations on MahaRERA, including STERLING RESIDENCY and STERLING RESIDENCY BUILDING C5 AND C6. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if STERLING RESIDENCY BUILDING C5 AND C6 is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of STERLING RESIDENCY BUILDING C5 AND C6?

The registered promoter entity is Sterling Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in STERLING RESIDENCY BUILDING C5 AND C6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for STERLING RESIDENCY BUILDING C5 AND C6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at STERLING RESIDENCY BUILDING C5 AND C6?

The professionals named in the filing: Architect: Chandrashekhar V Pawar; Engineer: Ankit Kumar; Engineer: Mukund Ghadge; Chartered Accountant: A B M S & Associates; Chartered Accountant: DJS & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in STERLING RESIDENCY BUILDING C5 AND C6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About STERLING RESIDENCY BUILDING C5 AND C6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save STERLING RESIDENCY BUILDING C5 AND C6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.