Registered No litigation declared Residential / Group Housing project

DIVINE SHLOKA

By OM DIVINE BUILDCON LLP

RG-MH-47202 · RERA P51700049887 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 75.00 crore secured on the land, in favour of AU SMALL FINANCE BANK LIMITED
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Podiums (if any), 70%
227 of 272Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

DIVINE SHLOKA is a Residential / Group Housing project by OM DIVINE BUILDCON LLP in Thane, Maharashtra, registered with MahaRERA as P51700049887 on 6 Mar 2023. Possession is promised by 31 Dec 2029. 45 of the 272 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameDIVINE SHLOKA
  • TypeResidential / Group Housing
  • Location
    • PANCHPAKADI VILLAGE
    • THANE
    • Thane (M Corp.)
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700049887
  • ReraGenie IDRG-MH-47202

Builder

  • NameOM DIVINE BUILDCON LLP
  • Entity typePartnership
  • PartnersPREMJI NARAN PATEL, VISHAL HARISH GOHIL, DINESH PREMJI PATEL

Key dates

this monthRegisteredMar 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Mar 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed104 files

Current status

17%45 of 272 units booked
23.8%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DIVINE SHLOKA Buliding no 1NA3227149123272

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 70%.

DIVINE SHLOKA Buliding no 1: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)70%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.18%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes15%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed767

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots767
Closed/Covered767

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area8,347 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAU SMALL FINANCE BANK LIMITED
Secured amountRs 75.00 crore
CERSAI search filedYes
Declared on2 Jul 2025
LandownerVillageDistrict
YASH SOCIETYMumbai CityMumbai City

Approvals and building plan

Permissible FSI31027.77
Proposed, not sanctioned24,198 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 16, Ground Floor, Kanakia Zillion, LBS-CST Road, Junction,BKC Annexe, Kurla(W),Mumbai,Maharashtra-400070
Estimated costRs 207.42 cr
Cost incurredRs 49.43 cr
Work done23.83%
BuildingWingEstimatedIncurred
DIVINE SHLOKA Buliding no 1NARs 188.56 crRs 46.14 cr
-NARs 18.86 crRs 3.30 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAAKAAR ARCHITECTS
EngineerASSOCIATED STRUCTURAL ENGINEERS LLP
EngineerRohit T Chavan
Chartered AccountantYOGESH SOVANI AND ASSOCIATES
Chartered AccountantSAGAR KARMAN BERA
Chartered AccountantDHAIRYA DAWDA
PartnerRole in project
OM DIVINE BUILDCON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Q4_FY 25-26.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2_Q4_FY 25-26.pdf19 Jun 2026
Withdrawal Update Form 3File: FORM-3_SIGNED_Q4_FY 25-26.pdf19 Jun 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Oct to Dec 25.pdf2 May 2026
Withdrawal Update Form 2File: form 2.pdf2 May 2026
Withdrawal Update Form 3File: FINAL - Signed - FORM 3 - Divine Sholka_dec 2025 with DSC.pdf2 May 2026
Form 2A (FY 2023-2024)File: Form 2A 23-24_COmpress.pdf30 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf30 Apr 2026
Form 5 (FY 2022-2023)File: Form 5 22-23.pdf30 Apr 2026
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf30 Apr 2026
Building plan approvalFile: AMENDED PERMISSION CC SANCTIONED PLAN DTD 26-11-2025 Sign.pdf27 Jan 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate July to Sep 25.pdf31 Dec 2025
Withdrawal Update Form 2File: DIVINE SHOLKA FORM 2.pdf31 Dec 2025
Withdrawal Update Form 3File: DIVINE SHOLKA FORM 3_FINAL.pdf31 Dec 2025
Form 5 (FY 2024-2025)File: FORM 5_FY 2024-25 with DSC.pdf19 Dec 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate_compressed.pdf13 Aug 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate_compressed.pdf13 Aug 2025
Withdrawal Update Form 2File: FORM 2_ENGINEER CERTIFICATE.pdf13 Aug 2025
Withdrawal Update Form 2File: FORM 2_ENGINEER CERTIFICATE.pdf13 Aug 2025
Withdrawal Update Form 3File: FORM 3 Q1 25-26 OM DIVINE.pdf13 Aug 2025
Withdrawal Update Form 3File: FORM 3 Q1 25-26 OM DIVINE.pdf13 Aug 2025
Form 1File: Form 1 Architect Certificate YASH SOCIETY - JAN TO MARCH 2025.pdf26 Jun 2025
Form 2File: Form 2 Engineer Certificate_compressed.pdf26 Jun 2025
Form 3File: FORM-3 Q4.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Letter.pdf26 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 CA Certificate_11zon.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 Architect Certificate.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf21 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5.pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Om Divine Form 3- Sept_11zon.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1-15072024.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- 15-07-2024_11zon.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- 15-07-2024.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf29 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 31-12-2023.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31-12-2023- ENGINEER CERTIFICATE.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31-12-2023 CA CERTIFICATE.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: saakaar Form 1.pdf2 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2345 FORM2 for Gr 6podium 7Floors 12 10 2023.pdf2 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate of financial process_compressed.pdf2 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Om divine_Fy 2022-23_compressed.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Architect.pdf21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 CA_compressed.pdf21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_NEW.PDF1 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement_11zon.pdf1 Mar 2023
Copy of the legal title reportFile: Legal Title Report.pdf16 Feb 2023
Details of encumbrances concerned to FinanceFile: encumburance - finance.pdf16 Feb 2023
Details of encumbrances concerned to FinanceFile: encumburance legal.pdf16 Feb 2023
Details of encumbrances concerned to LegalFile: encumburance - finance.pdf16 Feb 2023
Details of encumbrances concerned to LegalFile: encumburance legal.pdf16 Feb 2023
Proforma of Agreement for saleFile: draft agreement for sale.pdf2 Feb 2023
Building plan approvalFile: 501_0001.pdf16 Jan 2023
Building plan approvalFile: 501_0002.pdf16 Jan 2023
Building plan approvalFile: 501_0003.pdf16 Jan 2023
Building plan approvalFile: 501_0004.pdf16 Jan 2023
Building plan approvalFile: 501_0005.pdf16 Jan 2023
Building plan approvalFile: 501_0006.pdf16 Jan 2023
Building plan approvalFile: 501_0007.pdf16 Jan 2023
Building plan approvalFile: 501_0008.pdf16 Jan 2023
Layout approvalFile: 501_0001.pdf16 Jan 2023
Layout approvalFile: 501_0002.pdf16 Jan 2023
Layout approvalFile: 501_0003.pdf16 Jan 2023
Layout approvalFile: 501_0004.pdf16 Jan 2023
Layout approvalFile: 501_0005.pdf16 Jan 2023
Layout approvalFile: 501_0006.pdf16 Jan 2023
Layout approvalFile: 501_0007.pdf16 Jan 2023
Layout approvalFile: 501_0008.pdf16 Jan 2023
Copy of Layout Approval (in case of layout)File: 501_0001.pdf16 Jan 2023
Copy of Layout Approval (in case of layout)File: 501_0002.pdf16 Jan 2023
Copy of Layout Approval (in case of layout)File: 501_0003.pdf16 Jan 2023
Copy of Layout Approval (in case of layout)File: 501_0004.pdf16 Jan 2023
Copy of Layout Approval (in case of layout)File: 501_0005.pdf16 Jan 2023
Copy of Layout Approval (in case of layout)File: 501_0006.pdf16 Jan 2023
Copy of Layout Approval (in case of layout)File: 501_0007.pdf16 Jan 2023

How this compares with Thane

17%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DIVINE SHLOKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THANE7,600+ in Thane

2 kmDIVINE SHLOKACompleted 57Lapsed / revoked 24Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 214 registered projects within 2 km.

Builder: OM DIVINE BUILDCON LLP

OM DIVINE BUILDCON LLP has 1 registration on MahaRERA, including DIVINE SHLOKA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DIVINE SHLOKA is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DIVINE SHLOKA?

The registered promoter entity is OM DIVINE BUILDCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DIVINE SHLOKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DIVINE SHLOKA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DIVINE SHLOKA?

The professionals named in the filing: Architect: SAAKAAR ARCHITECTS; Engineer: ASSOCIATED STRUCTURAL ENGINEERS LLP; Engineer: Rohit T Chavan; Chartered Accountant: YOGESH SOVANI AND ASSOCIATES; Chartered Accountant: SAGAR KARMAN BERA; Chartered Accountant: DHAIRYA DAWDA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DIVINE SHLOKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DIVINE SHLOKA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DIVINE SHLOKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.