Home / Browse projects / Pune, Maharashtra / SRI SARSWATI
SRI SARSWATI
RG-MH-16877 · RERA P52100027106 · Last updated on MahaRERA portal: 6 Apr 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SRI SARSWATI is a Others project by YOGESH SHARAD GAVANKAR in Pune, Maharashtra, registered with MahaRERA as P52100027106 on 15 Nov 2020. Possession was promised by 30 Jun 2025 and is now 16 months past that date.
At a glance
Project
- NameSRI SARSWATI
- TypeOthers
- Location
- NEAR KASBA GANPATI MANDIR
- B\UDHWAR PETH
- Pune (M Corp.)
- Pune City
- Pune
- 411002
- Pincode411002
- RERA no.P52100027106
- ReraGenie IDRG-MH-16877
Builder
- NameYOGESH SHARAD GAVANKAR
- Entity typeIndividual
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on15 Nov 2020
- Promised completion30 Jun 2025
- Revised completionNone
- Buildings1 building record
- Documents filed63 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SRI SARSWATI | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 30%.
SRI SARSWATI: 39% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 30% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| YOGESH SHARAD GAVANKAR | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KANHEKAR PRAKASH |
| Engineer | NANDIKAR GURUNATH |
| Chartered Accountant | ANAND RAJENDRA JOSHI |
| Partner | Role in project |
|---|---|
| YOGESH SHARAD GAVANKAR | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Nov 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Apr 2024
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: PLAN01RERA.pdf | 6 Apr 2024 |
| Building plan approvalFile: PLAN02RERA.pdf | 6 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN01RERA.pdf | 6 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN02RERA.pdf | 6 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISECOMENCEMENT2-2-24.pdf | 6 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: STATUS-SALE AS ON 01-04-2024.pdf | 6 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: N A - OTHER REAL ESTATE.pdf | 6 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE - 14-2-24.pdf | 6 Apr 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: DECLARATION-INDEX-II SCAN-5-3-24.pdf | 6 Apr 2024 |
| Status of ConveyanceFile: STATUS OF CONVEYANCE - AS ON 1-4-2024.pdf | 6 Apr 2024 |
| Other - LegalFile: RAJARAM BAPU BANK- INDEX II OF RELEASE DEED-DT-28-3-24.pdf | 6 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SCAN - ENGG CERTIFICATE_compressed.pdf | 8 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA AC DETAILS.pdf | 8 Mar 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: N A - GRIVANCE.pdf | 8 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH KANEKAR 90 WORK DONE CERTrrIFICATE 29-03-2023_compressed.pdf | 20 Sep 2023 |
| Proforma of Agreement for saleFile: Sri Saraswati-Agreement Draft - commercial.pdf | 20 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: N A - AUDIT REPORT.pdf | 14 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: N A - AUDIT REPORT.pdf | 14 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: N A - AUDIT REPORT.pdf | 14 Aug 2023 |
| Copy of the legal title reportFile: TITLE OPINION UPDATED AS ON 19-10-2022_compressed.pdf | 21 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: NOT APPLICABLE.pdf | 21 Nov 2022 |
| Details of encumbrances concerned to LegalFile: NOT APPLICABLE.pdf | 21 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: STATUS - BOOKING ON 18-11-2022.pdf | 21 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE OF WORKS - 09-11-2022_compressed.pdf | 18 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE OF WORKS - 30-08-22_compressed.pdf | 5 Sep 2022 |
| Building plan approvalFile: FINAL REVISE PLAN PG 1.pdf | 4 May 2022 |
| Building plan approvalFile: REVISE PLAN PG 2.pdf | 4 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: FINAL REVISE PLAN PG 1.pdf | 4 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: REVISE PLAN PG 2.pdf | 4 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: FINAL REVISE COMMENCEMENT CERTIFICATE_compressed.pdf | 4 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SCAN - ENGG CERTIFICATE_compressed.pdf | 4 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SCAN - ENGG CERTIFICATE_compressed.pdf | 4 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: N A - AUDIT REPORT.pdf | 4 May 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: N A - AUDIT REPORT.pdf | 4 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT WORK DONE CERTIFICATE 23-04-2022_compressed.pdf | 23 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SCAN - ENGG CERTIFICATE_compressed.pdf | 23 Apr 2022 |
| CERSAI detailsFile: MBVA - REGISTRATION CERTIFICATE.pdf | 23 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: STATUS - BOOKING ON 23-4-2022.pdf | 23 Apr 2022 |
| Details of Restarting of Construction work post lockdownFile: STATUS OF RESTART OF WORKS.pdf | 23 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE WORK DONE- 16-12-21.pdf | 16 Dec 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PMC PILTH CHECKING CERTIFICATE.pdf | 16 Dec 2021 |
| Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE REVISE - 19-3-21_compressed.pdf | 1 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT WORK DONE CERTIFICATE - 24-06-2021_compressed.pdf | 1 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE -26-2-2021_compressed.pdf | 1 Sep 2021 |
| Building plan approvalFile: PMC REVISE PLAN PG 1 - SRI SARASWATI PROJECT.pdf | 29 Mar 2021 |
| Building plan approvalFile: PMC REVISE PLAN PG 2 - SRI SARASWATI PROJECT.pdf | 29 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PMC REVISE PLAN PG 1 - SRI SARASWATI PROJECT.pdf | 29 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: PMC REVISE PLAN PG 2 - SRI SARASWATI PROJECT.pdf | 29 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE REVISE - 19-3-21_compressed.pdf | 29 Mar 2021 |
| Building plan approvalFile: PMC PLAN PG 1.pdf | 12 Nov 2020 |
| Building plan approvalFile: PMC PLAN PG 2.pdf | 12 Nov 2020 |
| Layout approvalFile: LYOUT PLAN NOT APPLICABLE.pdf | 12 Nov 2020 |
| PAN CardFile: YSG NEW PAN CARD.pdf | 12 Nov 2020 |
| Copy of the legal title reportFile: TITLE OPINON REPORT_compressed.pdf | 12 Nov 2020 |
| Details of encumbrancesFile: TITLE OPINON REPORT_compressed.pdf | 12 Nov 2020 |
| Copy of Layout Approval (in case of layout)File: LYOUT PLAN NOT APPLICABLE.pdf | 12 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: PMC PLAN PG 1.pdf | 12 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: PMC PLAN PG 2.pdf | 12 Nov 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCMENT SCAN.PDF | 12 Nov 2020 |
| Declaration in FORM BFile: declaration - scancopy.pdf | 12 Nov 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate - scan copy_compressed.pdf | 12 Nov 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE_compressed.pdf | 12 Nov 2020 |
| Proforma of Allotment letterFile: Agreement draft - Shweta Construction-RERA.pdf | 12 Nov 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHWETAA ORCHID | 1412 SHUKRAWAR PETH PUNE | 1 | Completed | Mar 2014 | Late, Aug 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SRI SARSWATI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near B\UDHWAR PETH13,700+ in Pune
NAVI TULSIBAUG
MATOSHRI ESTATE PVT LTD
Shankeshawar Gold Palace
BPO Uprise Lifestyle
24k Aurum Centre
Dreamnest Developers
Shree Kuber Business Hub
Shree Realty
DHANLAXMI MARKET
DHANLAXMI INFRA
PEHLWAN PRATAP SINGH PLAZA
MODERN GROUP
Builder: YOGESH SHARAD GAVANKAR
YOGESH SHARAD GAVANKAR has 1 registration on MahaRERA, including SRI SARSWATI. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that SRI SARSWATI shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SRI SARSWATI is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SRI SARSWATI?
The registered promoter entity is YOGESH SHARAD GAVANKAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SRI SARSWATI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SRI SARSWATI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SRI SARSWATI?
The professionals named in the filing: Architect: KANHEKAR PRAKASH; Engineer: NANDIKAR GURUNATH; Chartered Accountant: ANAND RAJENDRA JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SRI SARSWATI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback