Home / Browse projects / Pune, Maharashtra / SPOT ONE

Registered No litigation declared Commercial project

SPOT ONE

By SHRIKRISHNA REALTY

RG-MH-55891 · RERA P52100017674 · Last updated on MahaRERA portal: 14 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2029Possession promisedno revision filed
4 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 50%
78 of 78Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 125 documents Report an error

SPOT ONE is a Commercial project by SHRIKRISHNA REALTY in Pune, Maharashtra, registered with MahaRERA as P52100017674 on 4 Sep 2018. Possession is promised by 31 Jul 2029. 0 of the 78 units on this registration are recorded sold or booked, and 4 of 33 construction stages are filed complete.

At a glance

Project

  • NameSPOT ONE
  • TypeCommercial
  • Location
    • OLD MUMBAI - PUNE HIGHWAY
    • -
    • Kanhe
    • Mawal
    • Pune
    • 412106
  • Pincode412106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100017674
  • ReraGenie IDRG-MH-55891

Builder

  • NameSHRIKRISHNA REALTY
  • Entity typePartnership
  • PartnerRAVI DEEPAK SHAH

Key dates

this monthRegisteredSep 2018PromisedJul 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Sep 2018
  • Promised completion31 Jul 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed125 files

Current status

0%0 of 78 units booked
20.6%Work done, per cost certificate

Figures as on 14 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ECO VALLEY COMMERCIAL PHASE INA2207878
ECO VALLEY COMMERCIAL PHASE IINA10000
ECO VALLEY COMMERCIAL PHASE IIINA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 14 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

ECO VALLEY COMMERCIAL PHASE I41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ECO VALLEY COMMERCIAL PHASE II0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ECO VALLEY COMMERCIAL PHASE III0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,889 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority, Pune
Permissible FSI3466.44
Proposed, not sanctioned2,854 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOffice No 101 102,First Floor, Next Gen Aveneue, Bahiratwadi, Opp Senapati Bapat road, Pune 411016
Estimated costRs 6.56 cr
Cost incurredRs 1.35 cr
Work done20.55%
BuildingWingEstimatedIncurred
ECO VALLEY COMMERCIAL PHASE INARs 5.98 crRs 1.23 cr
-NARs 58.42 lakhRs 12.06 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCON
EngineerDeepak Kanase
EngineerSanjivani Ade
Chartered AccountantSSAP And Associates LLP
PartnerRole in project
SHRIKRISHNA REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2029

Documents filed125

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Spot One Commercial_FOrm 1_31032026.pdf14 Apr 2026
Withdrawal Update Form 2File: Spot One Commercial_Form 2_31032026.pdf14 Apr 2026
Withdrawal Update Form 3File: Spot One Commercial_Form 3_31032026.pdf14 Apr 2026
Withdrawal Update Form 1File: Spot One Commercial_Form 1_DEc 2025.pdf19 Jan 2026
Withdrawal Update Form 2File: Spot One Commercial_Form 2_Dec 2025.pdf19 Jan 2026
Withdrawal Update Form 3File: Spot One commercial_Form 3_Dec 2025.pdf19 Jan 2026
Withdrawal Update Form 1File: Spot One Commercial_Form 1_Sept 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: Spot One Commercial_Form 2_Sept 2025.pdf17 Oct 2025
Withdrawal Update Form 3File: Spot One Commercial_Form 3_Sept 2025.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Spot One Commercial_Form 5.pdf6 Oct 2025
Withdrawal Update Form 1File: Spot One commercial_Form 1_30062025.pdf18 Jul 2025
Withdrawal Update Form 2File: Spot One_Form 2_30062025.pdf18 Jul 2025
Withdrawal Update Form 3File: Spot One_Form 3_30062025 Signed.pdf18 Jul 2025
Form 1File: Spot One commercial_Form 1_30062025.pdf17 Jul 2025
Form 2File: Spot One_Form 2_30062025.pdf17 Jul 2025
Form 3File: Spot One_Form 3_30062025 Signed.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Spot One_Disclure of sold_unsold_30062025.pdf17 Jul 2025
Form 1File: 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf20 Jun 2025
Form 2File: 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf20 Jun 2025
Form 3File: 16 Certificates of CA (Form 3).pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory.pdf20 Jun 2025
Form 2A (FY 2023-2024)20 Jun 2025
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf20 Jun 2025
Form 1File: 26 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf19 Jun 2025
Form 2File: 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf19 Jun 2025
Form 3File: 17 Certificates of CA (Form 3).pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory (2).pdf19 Jun 2025
Form 2A (FY 2024-2025)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (2).pdf19 Jun 2025
Form 5 (FY 2023-2024)File: Spot One Commercial _Form 5_2023_24.pdf19 Jun 2025
Disclosure of sold/ booked inventoryFile: Spot One Commercial_Information of sold_booked inventory.pdf25 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Spot One commercial_Form 2A_2024-25.pdf25 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spot One Commercial_Form 1_March 2025.pdf18 Apr 2025
Certificates of CA (Form 3)File: Spot One Commercial_Form 3_March 2025.pdf18 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Spot One Commercial_Form 2_March 2025.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Spot One commercial_Declaration of sold_booked inventory.pdf5 Feb 2025
Certificates of CA (Form 3)File: SKR_CA Cert_Dec 2024.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SKR_Engg Certificate_Dec 2024.pdf20 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spot One Commercial_Architect Cert_Dec 2024.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Spot One Commercial_Form 5 FY_2023-24.pdf5 Dec 2024
Certificates of CA (Form 3)File: Spot One_Form 3_Signed_30092024.pdf18 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Spot One_Form 2_Signed_30092024.pdf18 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spot one commercial_Form 1_Sept 2024 Signed.pdf14 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SKR_Form 2_June 2024_Signed.pdf22 Jul 2024
Certificates of CA (Form 3)File: SKR_Form 3_June 2024 _Signed.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spot One Commercial_Form1_June 2024_Signed.pdf10 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SKrealty1_Form 1_March 2024.pdf10 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_FY 2018-19.pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_FY 2019-20.pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_FY 2020-21.pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_FY 2021-22.pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 2022-23.pdf5 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY 2023-24.pdf5 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20230331 - Spot One Form 1.pdf20 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20230630 - Spot One Form 1.pdf20 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20230930 - Spot One Form 1.pdf20 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20231231 - Spot One Form 1.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Spot One Commercial Engg Certificate_Dec 2023.pdf20 Feb 2024
Certificates of CA (Form 3)File: RERA SHRI KRISHNA 31122023 SIGNED.pdf31 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shrikrishna Realty Form5.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: spot One commercial_Engg certificate_Sept 2023_compressed.pdf24 Nov 2023
Certificates of CA (Form 3)File: Spot One commercial BLDG CA Certificate_Sept 2023_compressed.pdf24 Nov 2023
Certificates of CA (Form 3)File: RERA SHRI KRISHNA 30062023.pdf8 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Spot One Form 5 2021-22.pdf20 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spot One Arch Cert_Sept 2022.pdf26 Nov 2022
Certificates of CA (Form 3)File: Spot One CA _Sept 2022.pdf26 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spot one Arch June 2022.pdf17 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spot One Cimmercial_Arch Cert_March 2022_compressed.pdf6 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SKR Engineers Certificate 31 march 2022_compressed.pdf6 May 2022
Certificates of CA (Form 3)File: Spot One commercial_CA March 2022.pdf6 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SKR Architect_March 2022.pdf21 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spot One Commercial Arch certificate_Dec 2021.pdf3 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Spot One Commercial.pdf28 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spot One Commercial Arch Cert_Sept 2021_compressed.pdf9 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Spot One Commercial Engg Certificate_July 2021.pdf24 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spot One Commercial_June 2021.pdf8 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shri Krishna Realty Architect Certificate 31 march 2021.pdf15 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shrikrishna Realty Engineers certificate 31-03-2021.pdf15 Jun 2021
Certificates of CA (Form 3)File: CA Certificate_Shrikrishna Realty March 2021.pdf15 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Spot One Commercial Form 5 FY 2019-20.pdf8 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Spot One Commercial Arch Cert_Dec 2020.pdf22 Jan 2021

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SPOT ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

2 kmSPOT ONECompleted 11Lapsed / revoked 10Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: SHRIKRISHNA REALTY

SHRIKRISHNA REALTY has 1 registration on MahaRERA, including SPOT ONE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SPOT ONE is delayed beyond 31 Jul 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SPOT ONE?

The registered promoter entity is SHRIKRISHNA REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SPOT ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SPOT ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SPOT ONE?

The professionals named in the filing: Architect: ARCON; Engineer: Deepak Kanase; Engineer: Sanjivani Ade; Chartered Accountant: SSAP And Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SPOT ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SPOT ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SPOT ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.