Home / Browse projects / Pune, Maharashtra / Residential Building on CTS No 107/1P -GIRIVAR RESIDENCY

Registered No litigation declared Residential / Group Housing project

Residential Building on CTS No 107/1P -GIRIVAR RESIDENCY

By SHRIVAR BUILDERS LLP

RG-MH-99099 · RERA P52100047061 · Last updated on MahaRERA portal: 15 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 95%
167 of 382Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

Residential Building on CTS No 107/1P -GIRIVAR RESIDENCY is a Residential / Group Housing project by SHRIVAR BUILDERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100047061 on 29 Sep 2022. Possession is promised by 31 Dec 2026. 215 of the 382 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameResidential Building on CTS No 107/1P -GIRIVAR RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • WADAGAON
    • Wadagaon (CT)
    • Mawal
    • Pune
    • 412106
  • Pincode412106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047061
  • ReraGenie IDRG-MH-99099

Builder

  • NameSHRIVAR BUILDERS LLP
  • Entity typePartnership
  • PartnerSITARAM MAHAVIR VARMA
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Sep 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Current status

56%215 of 382 units booked
86.2%Work done, per cost certificate

Figures as on 15 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GIRIVAR RESIDENCY-PHASE-1-WING-D AND ENA13123820382

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.

GIRIVAR RESIDENCY-PHASE-1-WING-D AND E: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes90%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes75%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed166

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots166
Closed/Covered166

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,287 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 May 2026
LandownerVillageDistrict
PAVAN MAHAVIR VARMAPimpri Chinchawad (M Corp.)Pune
RAJESH MAHAVIR VARMAPimpri Chinchawad (M Corp.)Pune
NITIN KRUSHNARAV DHOREWadagaon (CT)Pune
MAHAVIR SHIVLAL VARMAPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityVadgaon Maval Nagar Panchayat
Permissible FSI19836.31
Proposed, not sanctioned19,836 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTALEGAON, DABHADE, PUNE
Estimated costRs 43.17 cr
Cost incurredRs 37.20 cr
Work done86.18%
BuildingWingEstimatedIncurred
GIRIVAR RESIDENCY-PHASE-1-WING-D AND ENARs 41.98 crRs 37.18 cr
-NARs 1.19 crRs 2.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMilind Panchal and Associates
EngineerGauravkumar Bhikhubhau Sewale
EngineerAditya Savalkar
Chartered AccountantHaresh Lalwani
PartnerRole in project
Shrivar Builders LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A FY-2025-2026.pdf15 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 - FY 2024-25.pdf15 Jun 2026
Withdrawal Update Form 1File: F1 Mar 26.pdf26 May 2026
Withdrawal Update Form 2File: F2 Mar 26.pdf26 May 2026
Withdrawal Update Form 3File: Q4 FY 25-26.pdf26 May 2026
Withdrawal Update Form 1File: Form No1 107.pdf16 May 2026
Withdrawal Update Form 1File: Form-1 Q2 FY 25-26.pdf16 May 2026
Withdrawal Update Form 1File: Form-1 Q3 FY 25-26_compressed.pdf16 May 2026
Withdrawal Update Form 2File: Eng Certificate Q1 FY 25-26.pdf16 May 2026
Withdrawal Update Form 2File: Engineer Certificate Q2 FY 25-26.pdf16 May 2026
Withdrawal Update Form 2File: Eng Certificate Q3 FY 25-26.pdf16 May 2026
Withdrawal Update Form 3File: Q1 FY 25-26_compressed.pdf16 May 2026
Withdrawal Update Form 3File: Q2 FY 25-26.pdf16 May 2026
Withdrawal Update Form 3File: Q3 FY 25-26.pdf16 May 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate Q2 FY 2024-25.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate Q3 Fy 24-25.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 FY 22-23.pdf2 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No -01 - For 107.pdf2 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 1 Q1 FY 24-25.pdf2 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 FY 24-25.pdf2 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 FY 24-25.pdf2 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 FY 24-25.pdf2 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 FY 24-25.pdf2 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10925_Shrivar_Form3_ JUNE 24 final Q1 24-25.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate Q1 FY 24-25.pdf8 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q4 23-24.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10730_Shrivar_Form3_ Dec 23 final Q4 23-24_Updated.pdf28 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate Q4 23-24.pdf12 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Q4 23-24.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10677_Shrivar_Form3_Q2_SEP23_M24.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10678_Shrivar_Form3_ Q3_Dec23 _M24.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect's Certificate (1).pdf4 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE Q3 FY 23-24.pdf2 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A FY 23-24 Q3.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 01-Q1 FY 23-24 GIRIVAR.pdf15 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER Q1 FY 23-24.pdf15 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Q4 FY 2022-23_compressed.pdf15 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Q1 FY 23-24.pdf15 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 CA FY 23-24 Q 1.pdf15 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE Q4 FY 2022-23_compressed.pdf16 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERTIFICATE Q4 FY 2022-23_compressed.pdf16 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 ENG CERTIFICATE Q4 FY 2022-23_compressed.pdf16 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Q4 FY 2022-23_compressed.pdf16 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE Q4 FY 2022-23-1-9.pdf16 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE Q4 FY 2022-23-10-18.pdf16 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE Q4 FY 2022-23-10-18.pdf16 May 2023
Layout approvalFile: Layout Plan pg1_compressed.pdf1 Mar 2023
Building plan approvalFile: pg-2-3_compressed.pdf1 Mar 2023
Building plan approvalFile: pg-4-5.pdf1 Mar 2023
Building plan approvalFile: pg-6-7.pdf1 Mar 2023
Building plan approvalFile: pg-8-9_compressed.pdf1 Mar 2023
Building plan approvalFile: pg-10.pdf1 Mar 2023
Building plan approvalFile: pg-11.pdf1 Mar 2023
Building plan approvalFile: pg-12.pdf1 Mar 2023
Building plan approvalFile: pg-13.pdf1 Mar 2023
Building plan approvalFile: pg-14-16_compressed.pdf1 Mar 2023
Copy of Layout Approval (in case of layout)File: Layout Plan pg1_compressed.pdf1 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: pg-2-3_compressed.pdf1 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: pg-4-5.pdf1 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: pg-6-7.pdf1 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: pg-8-9_compressed.pdf1 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: pg-10.pdf1 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: pg-11.pdf1 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: pg-12.pdf1 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: pg-13.pdf1 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: pg-14-16_compressed.pdf1 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: GIRIVAR CC.pdf1 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format 'A' - Separate Bank Account.pdf11 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviations of Agreement to sales220922.pdf22 Sep 2022
Other - LegalFile: AFS-220922.pdf22 Sep 2022
Copy of the legal title reportFile: TSR-Pg 1 to 5.pdf13 Sep 2022
Copy of the legal title reportFile: TSR-Pg 6 to 10.pdf13 Sep 2022
Copy of the legal title reportFile: TSR-Pg 11 to 14.pdf13 Sep 2022
Copy of the legal title reportFile: Reply to Official Comments.pdf13 Sep 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance Finance Declaration.pdf13 Sep 2022
Proforma of Allotment letterFile: Allotment Letter.pdf7 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation - Allotment letter.pdf7 Sep 2022
Building plan approvalFile: 6 Building Plan Approval-Pg 1 and 2 (9).pdf6 Sep 2022
Building plan approvalFile: 6 Building Plan Approval-Pg 3 to 6 (9).pdf6 Sep 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationRegisteredStatusPromisedDelivered
ANANDBANP52100002259ravet, PuneJul 2017CompletedAug 2018Registered original: May 2018Late, Oct 2018

How this compares with Pune

56%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Residential Building on CTS No 107/1P -GIRIV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WADAGAON13,700+ in Pune

2 kmResidential Building on Completed 163Lapsed / revoked 119Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: SHRIVAR BUILDERS LLP

SHRIVAR BUILDERS LLP has 1 registration on MahaRERA, including Residential Building on CTS No 107/1P -GIRIVAR RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Residential Building on CTS No 107/1P -GIRIVAR RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Residential Building on CTS No 107/1P -GIRIVAR RESIDENCY?

The registered promoter entity is SHRIVAR BUILDERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Residential Building on CTS No 107/1P -GIRIVAR RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Residential Building on CTS No 107/1P -GIRIVAR RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Residential Building on CTS No 107/1P -GIRIVAR RESIDENCY?

The professionals named in the filing: Architect: Milind Panchal and Associates; Engineer: Gauravkumar Bhikhubhau Sewale; Engineer: Aditya Savalkar; Chartered Accountant: Haresh Lalwani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Residential Building on CTS No 107/1P -GIRIVAR RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Residential Building on CTS No 107/1P -GIRIVAR RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Residential Building on CTS No 107/1P -GIRIV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.