Home / Browse projects / Thane, Maharashtra / SPM Lake City Phase II Part 1

Registered No litigation declared Residential / Group Housing project

SPM Lake City Phase II Part 1

By KOTHARI & DESHMUKH LANDMARK LLP

RG-MH-28112 · RERA P51700024808 · Last updated on MahaRERA portal: 4 Feb 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 34 months
  • 1 extension taken
  • Rs 9.00 crore secured on the land, in favour of Motilal Oswal Home Finance Limited

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Nov 2028Possession promisedmoved 34 months from the original
18 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 80%
131 of 199Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

SPM Lake City Phase II Part 1 is a Residential / Group Housing project by KOTHARI & DESHMUKH LANDMARK LLP in Thane, Maharashtra, registered with MahaRERA as P51700024808 on 9 Mar 2020. Possession is promised by 30 Nov 2028. The completion date has moved by 34 months from the original filing. 68 of the 199 units on this registration are recorded sold or booked, and 18 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSPM Lake City Phase II Part 1
  • TypeResidential / Group Housing
  • Location
    • Gut No 56/2 Karav Village
    • Karav Village
    • Vangani (CT)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700024808
  • ReraGenie IDRG-MH-28112

Builder

  • NameKOTHARI & DESHMUKH LANDMARK LLP
  • Entity typePartnership
  • PartnersMAHESH VINAYCHAND KOTHARI, SUNILKUMAR VINAYCHAND KOTHARI, PANKAJKUMAR VINAYCHAND KOTHARI
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2020First promiseJan 2026Revised toNov 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Mar 2020
  • Promised completion30 Nov 2028
  • Revised completionRevised to 30 Nov 2028 (originally 30 Jan 2026)
  • Buildings3 building records
  • Documents filed70 files

Current status

34%68 of 199 units booked
60.7%Work done, per cost certificate

Figures as on 4 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing DNA6480080
Wing ENA6476076
Wing LNA6443043

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 80%.

Wing D64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing E47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing L73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
Wing D11
Wing E11
Wing L11

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,200 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofMotilal Oswal Home Finance Limited
Secured amountRs 9.00 crore
CERSAI search filedYes
Declared on8 Jan 2026

Approvals and building plan

Sanctioning authorityJILHADHIKARI KARYALAY, THANE
Permissible FSI8162.0
Proposed, not sanctioned8,162 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBadlapur
Estimated costRs 19.79 cr
Cost incurredRs 12.01 cr
Work done60.66%
BuildingWingEstimatedIncurred
Wing DNARs 6.90 crRs 5.59 cr
Wing ENARs 5.55 crRs 2.58 cr
Wing LNARs 4.41 crRs 3.84 cr
-NARs 2.93 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDestination Architecture Interior Designs
EngineerDesignage Consulting Structural Engineers
Chartered AccountantKIRTANE & PANDIT LLP
Chartered AccountantA S K A & Co.
Chartered AccountantJoshi Kale & Associates
PartnerRole in project
KOTHARI & DESHMUKH LANDMARK LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30012619655Jan 2026 → Nov 2028

Reason as filed by the promoterThe project has been delayed due to general market slowdowns and disruptions in material availability, which have affected the pace of construction.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602662INDRAJEET PRALHAD SURYAWANSHIKOTHARI & DESHMUKH LANDMARK LLP08/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2028

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Signed Form 1.pdf4 Feb 2026
Form 2File: Signed Form 2.pdf4 Feb 2026
Form 3File: Signed Form 3.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Unsold Inventory KD Landmrk LLP.pdf4 Feb 2026
Form 1File: Signed Form 1.pdf4 Feb 2026
Form 2File: Signed Form 2.pdf4 Feb 2026
Form 3File: Signed Form 3.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold Dec 24.pdf4 Feb 2026
Form 1File: Signed Form 1.pdf4 Feb 2026
Form 2File: Signed Form 2.pdf4 Feb 2026
Form 3File: Signed Form 3.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold March 25.pdf4 Feb 2026
Form 1File: Signed Form 1.pdf30 Jan 2026
Form 2File: Signed Form 2.pdf30 Jan 2026
Form 3File: KD Landmark Form 3_signed 1_compressed.pdf30 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Unsold Inventory KD Landmark LLP- June 2024- Signed.pdf30 Jan 2026
Withdrawal Update Form 1File: Signed Form 1.pdf30 Jan 2026
Withdrawal Update Form 1File: Signed Form 1.pdf30 Jan 2026
Withdrawal Update Form 1File: Signed Form 1.pdf30 Jan 2026
Withdrawal Update Form 1File: Signed Form 1.pdf30 Jan 2026
Withdrawal Update Form 2File: Kothari and Deshmukh Landmark LLP - Form 2 Jun 2025.pdf30 Jan 2026
Withdrawal Update Form 2File: Signed Form 2.pdf30 Jan 2026
Withdrawal Update Form 2File: Signed Form 2.pdf30 Jan 2026
Withdrawal Update Form 2File: Signed Form 2.pdf30 Jan 2026
Withdrawal Update Form 3File: Signed Form 3.pdf30 Jan 2026
Withdrawal Update Form 3File: Signed Form 3.pdf30 Jan 2026
Withdrawal Update Form 3File: Signed Form 3.pdf30 Jan 2026
Withdrawal Update Form 3File: Signed Form 3.pdf30 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-255 KD Landmark LLP_signed.pdf20 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 K D Landmark LLP - Form 1_ Wing D,E,L_2024-06-30.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KD Landmark Form 3_signed 1_compressed.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05 K D Landmark LLP - Form 2 (D, E, L) - Jun 2024.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5 FY 23-24.pdf9 Dec 2024
Details of encumbrancesFile: Encumbrance Certificate - SMFG India Home Finance Company Limited.pdf27 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 compressed.pdf27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Compressed.pdf27 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed_Form 5 FY 22-23_KD Landmark.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf29 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf29 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf29 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf29 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 K D Landmark.pdf23 Jan 2023
Proforma of Allotment letterFile: Kothari and Deshmukh Landmark LLP - Draft Agreement.pdf3 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: certifcate -562 -kaav city -rera_compressed.pdf1 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 K D Landmark_compressed.pdf1 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D Wing - Architect Certificate.pdf21 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: L Wing - Architect Certificate.pdf21 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: E Wing - Architect Certificate.pdf21 Sep 2022
Details of encumbrancesFile: KD - Encrumbance_Certificate.pdf25 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KD Landmark LLP - SPM Lake City - FORM 3.pdf4 Mar 2022
Proforma of Allotment letterFile: KD - SPM Lake City - New Draft.pdf19 Jan 2022
Layout approvalFile: Plan Wing D compressed.pdf28 Feb 2020
Copy of Layout Approval (in case of layout)File: Plan Wing D compressed.pdf28 Feb 2020
Proforma of Allotment letterFile: Allotment Letter.pdf28 Feb 2020
Layout approvalFile: Layout compressed.pdf26 Feb 2020
Layout approvalFile: Layout compressed .pdf26 Feb 2020
Layout approvalFile: Plan Wing D compressed.pdf26 Feb 2020
Building plan approvalFile: Order from Town Authority compressed.pdf26 Feb 2020
PAN CardFile: Co Pan Card compressed.pdf26 Feb 2020
Copy of the legal title reportFile: Title Certificate.pdf26 Feb 2020
Details of encumbrancesFile: Declaration for No Encumbrances compressed.pdf26 Feb 2020
Copy of Layout Approval (in case of layout)File: Layout compressed.pdf26 Feb 2020
Copy of Layout Approval (in case of layout)File: Layout compressed .pdf26 Feb 2020
Copy of Layout Approval (in case of layout)File: Plan Wing D compressed.pdf26 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: Order from Town Authority compressed.pdf26 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf26 Feb 2020
Declaration in FORM BFile: Partners Declaration compressed.pdf26 Feb 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Phase 2 Part I.pdf26 Feb 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf26 Feb 2020
Proforma of Allotment letterFile: Agreement Sample.pdf26 Feb 2020

How this compares with Thane

34%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 34 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SPM Lake City Phase II Part 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Karav Village7,600+ in Thane

Builder: KOTHARI & DESHMUKH LANDMARK LLP

KOTHARI & DESHMUKH LANDMARK LLP has 2 registrations on MahaRERA, including SPM Lake City Phase II Part 1 and SPM lake City Phase II Part 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SPM Lake City Phase II Part 1 is delayed beyond 30 Nov 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SPM Lake City Phase II Part 1?

The registered promoter entity is KOTHARI & DESHMUKH LANDMARK LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SPM Lake City Phase II Part 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SPM Lake City Phase II Part 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SPM Lake City Phase II Part 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SPM Lake City Phase II Part 1?

The professionals named in the filing: Architect: Destination Architecture Interior Designs; Engineer: Designage Consulting Structural Engineers; Chartered Accountant: KIRTANE & PANDIT LLP; Chartered Accountant: A S K A & Co.; Chartered Accountant: Joshi Kale & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SPM Lake City Phase II Part 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SPM Lake City Phase II Part 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SPM Lake City Phase II Part 1 to a free account