Registered No litigation declared Residential / Group Housing project

Sparsh Zinnea

By Shree Enterprises

RG-MH-24445 · RERA P52100011767 · Last updated on MahaRERA portal: 17 Apr 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 96 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 96 months from the original
3 of 11Construction stages donefurthest along: Installation of Lifts, 41%
57 of 63Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Sparsh Zinnea is a Residential / Group Housing project by Shree Enterprises in Pune, Maharashtra, registered with MahaRERA as P52100011767 on 31 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 96 months from the original filing. 6 of the 63 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSparsh Zinnea
  • TypeResidential / Group Housing
  • Location
    • Mulshi Road
    • Kasar Amboli
    • Mulshi
    • Pune
    • 412108
  • Pincode412108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100011767
  • ReraGenie IDRG-MH-24445

Builder

  • NameShree Enterprises
  • Entity typePartnership
  • GSTIN27ACAFS4593E1Z0
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerAjay P Patil
  • Other registrations23 more →
  • Completed7 of 24
  • No longer live10 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed68 files

Current status

10%6 of 63 units booked
22.0%Work done, per cost certificate

Figures as on 17 Apr 2023, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building BNA10963063

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 41%.

Building B: 32% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.41%

Progress on shared amenities18

As on 17 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes86%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes50%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
Fitness CenterYes0%
Grand Entarance GateYes100%
Club HouseYes0%

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered18
Open Space20

Land and ownership11

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,644 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Oct 2025
LandownerVillageDistrict
Pintoo Sundardas MiraniPune (M Corp.)Pune
Sumant Ramrao GarudPune (M Corp.)Pune
Santosh Ramrao GarudPune (M Corp.)Pune
Anant Sadashiv SutarPirangutPune
Shriram Anant SutarPirangutPune
Mahadu Sadashiv SutarPirangutPune
Amey Anil Sutar aka ShindePune (M Corp.)Pune
Ashwini Anil Sutar aka ShindePune (M Corp.)Pune
Amruta Anil Sutar aka ShindePune (M Corp.)Pune
Ram Govind DhumalPune (M Corp.)Pune
Ishwar Govind DhumalPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY, PUNE
Permissible FSI5714.08
Proposed, not sanctioned3,809 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Aarti, Sector 2, Shivaji Chowk, Vashi Navi Mumbai
Estimated costRs 10.64 cr
Cost incurredRs 2.34 cr
Work done21.96%
BuildingWingEstimatedIncurred
Building BNARs 9.46 crRs 2.10 cr
-NARs 1.18 crRs 23.58 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShinde Joshi & Associates
ArchitectAN.ARCH Architect & Planner
EngineerAmol R Dhumal
EngineerAMAR MORE
Chartered AccountantBrajesh Goyal & Associates
Chartered AccountantM.G. Suthar & Associates
PartnerRole in project
Shree Enterprises-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005748Dec 2019 → Dec 2020

Reason as filed by the promoter• The construction of building could not be carried out completely due to sluggish sales in the project. • The construction of structure for the proposed building is in progress and we are arranging for funds from other sources. • The renewed marketing attempt by effecting a change in the name of project in June 2019 also did not elicit much response and majority of inventory still remains unsold. • The Promoter submits that they have made genuine efforts but the work couldn’t be completed in time due to liquidity crunch and sluggish sales of the project. • The promoter humbly requests this Ho

EXT52100013998Dec 2019 → Dec 2027

Reason as filed by the promoterThe project was stalled due to various factors viz. change in rules, Covid-19 induced difficulties, Financial constraints. Now, the Promoter wish to restart the project with a new Identity for which application along with consents from allottees shall be submitted after extension application for the project is approved by this Authority. We are submitting herewith the consent of allottees for extension of project as applied for. Thanking you. Yours truly

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202303_Ar.pdf17 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202303_Er.pdf17 Apr 2023
Certificates of CA (Form 3)File: 202303_CA.pdf17 Apr 2023
Certificates of CA (Form 3)File: 202212_CA.pdf4 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20_Form-5.pdf4 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-21_Form-5.pdf4 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021-22_Form-5.pdf4 Mar 2023
Proforma of Agreement for saleFile: Hillcrest-B AfS.pdf4 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Seperate Bank Account.pdf4 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202203_Ar.pdf2 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202302_Ar.pdf2 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202203_Er.pdf2 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 202212_Er.pdf2 Mar 2023
Certificates of CA (Form 3)File: 202003_CA.pdf2 Mar 2023
Certificates of CA (Form 3)File: 202103_CA.pdf2 Mar 2023
Certificates of CA (Form 3)File: 202203_CA.pdf2 Mar 2023
Details of encumbrances concerned to FinanceFile: No Legal Encumberances.pdf1 Mar 2023
Details of encumbrances concerned to LegalFile: No Legal Encumberances.pdf1 Mar 2023
Declaration about Commencement CertificateFile: CC Declaration.pdf1 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Zinnea Form-2A_2019-20.pdf1 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Zinnea Form-2A_2020-21.pdf1 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Zinnea Form-2A_2021-22.pdf1 Mar 2023
Disclosure of sold/ booked inventoryFile: Discolsure of Sold Inventory.pdf1 Mar 2023
CERSAI detailsFile: Undertaking CERSAI.pdf1 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201906_Ar.pdf14 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201909_Ar.pdf14 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201906_Er.pdf14 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201909_Er.pdf14 Feb 2020
Certificates of CA (Form 3)File: 201906_CA.pdf14 Feb 2020
Certificates of CA (Form 3)File: 201909_CA.pdf14 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 201903_Form-5.pdf14 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201803_Ar.pdf30 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201806_Ar.pdf30 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201809_Ar.pdf30 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201812_Ar.pdf30 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201803_Er.pdf30 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201806_Er.pdf30 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201809_Er.pdf30 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201812_Er.pdf30 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201903_Er.pdf30 Apr 2019
Certificates of CA (Form 3)File: 201803_CA.pdf30 Apr 2019
Certificates of CA (Form 3)File: 201806_CA.pdf30 Apr 2019
Certificates of CA (Form 3)File: 201809_CA.pdf30 Apr 2019
Certificates of CA (Form 3)File: 201812_CA.pdf30 Apr 2019
Certificates of CA (Form 3)File: 201903_CA.pdf30 Apr 2019
Certificates of CA (Form 5)File: 201803_Form-5.pdf30 Apr 2019
Copy of the legal title reportFile: Title Search Report Rigel-1.pdf30 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rigel-Arch Certificate Dec-2017.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rigel_Eng_Dec17-1.pdf30 Mar 2018
Certificates of CA (Form 3)File: Rigel_CA_Sep17-1.pdf30 Mar 2018
Certificates of CA (Form 3)File: Rigel_CA_Dec17-1.pdf30 Mar 2018
Proforma of Allotment letterFile: Draft Agreement -Rigel Enclave - New.pdf30 Mar 2018
OtherFile: NA ORDER -RIGEL ENCLAVE-1.pdf30 Mar 2018
OtherFile: 9th Floor Rigel Enclave.pdf30 Mar 2018
Layout approvalFile: Rigel Enclave - Sanction Copy 3.PDF31 Jul 2017
Building plan approvalFile: Rigel Enclave - Sanction Copy 4.PDF31 Jul 2017
PAN CardFile: Company and Partners -PAN and Adhar Details-min.pdf31 Jul 2017
Copy of the legal title reportFile: Title_Search_Report_-Pune-min.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate-min.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Rigel Enclave - Sanction Copy 3.PDF31 Jul 2017
Building Plan Approval (IOD)File: Rigel Enclave - Sanction Copy 4.PDF31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC_for_Rigel_Enclave.pdf31 Jul 2017
Declaration in FORM BFile: Devendra Kanawade - Rigel-min.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC - RIGEL.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_Certificate_-_Regal.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate-Rigel enclave.pdf31 Jul 2017
Proforma of Allotment letterFile: Agreement for Sale-Rigel Enclave1.pdf31 Jul 2017
OtherFile: Supplementary_Title_Search-Rigel.pdf31 Jul 2017

How this compares with Pune

10%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 96 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sparsh Zinnea on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kasar Amboli13,700+ in Pune

2 kmSparsh ZinneaCompleted 20Lapsed / revoked 17Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 50 registered projects within 2 km.

Builder: Shree Enterprises

SHREE ENTERPRISES has 24 registrations on MahaRERA, including SHREE TULSI KUNJ and SILVER DREAMS. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sparsh Zinnea is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sparsh Zinnea?

The registered promoter entity is Shree Enterprises, a partnership as per the filing. Its GSTIN 27ACAFS4593E1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sparsh Zinnea?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sparsh Zinnea?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sparsh Zinnea?

The professionals named in the filing: Architect: Shinde Joshi & Associates; Architect: AN.ARCH Architect & Planner; Engineer: Amol R Dhumal; Engineer: AMAR MORE; Chartered Accountant: Brajesh Goyal & Associates; Chartered Accountant: M.G. Suthar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sparsh Zinnea?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sparsh Zinnea. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sparsh Zinnea to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.