ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SPACE RESIDENCE - II - BUILDING NO. 4 B

Registered No litigation declared Residential / Group Housing project

SPACE RESIDENCE - II - BUILDING NO. 4 B

By SPACE REALTY

RG-MH-28959 · RERA P51700027464 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 65%
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

SPACE RESIDENCE - II - BUILDING NO. 4 B is a Residential / Group Housing project by SPACE REALTY in Thane, Maharashtra, registered with MahaRERA as P51700027464 on 11 Dec 2020. Possession is promised by 30 Jan 2027.

At a glance

Project

  • NameSPACE RESIDENCE - II - BUILDING NO. 4 B
  • TypeResidential / Group Housing
  • Location
    • MIRA BHAYANDER ROAD
    • OPP. PLEASANT PARK
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700027464
  • ReraGenie IDRG-MH-28959

Builder

  • NameSPACE REALTY
  • Entity typePartnership
  • PartnersSATISH SURAJ PAL SINGH SIKARWAR, HARISH ARJUNDAS JOKYANI, NARENDRA CHETRAM GUPTA, MAHAVIRPRASAD KISHANLAL SHARMA
  • Other registrations1 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredDec 2020PromisedJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2020
  • Promised completion30 Jan 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 4 BNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 65%.

BUILDING NO 4 B: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)40%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered70
Open Space5

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,273 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
MARUTI DWELLERS PRIVATE LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMira-Bhayandar Municipal Corporation
Permissible FSI9022.91
Proposed, not sanctioned6,284 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRPG TOWER 248 ANDHERI KURLA ROAD, JB NAGAR, ANDHERI EAST, MUMBAI-400059

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANISH & ASSOCIATES
ArchitectSOMAIYA & ASSOCIATES
EngineerHIREN M TANNA
Chartered AccountantHJT & ASSOCIATES
Chartered AccountantHEMANT GAJENDRA JOSHI
PartnerRole in project
SPACE REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jan 2027

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1_4B.pdf25 May 2026
Form 2File: FORM 2_4B.pdf25 May 2026
Form 3File: FORM3_4B.pdf25 May 2026
Disclosure of Sold and Booked InventoryFile: Disc_4B.pdf25 May 2026
Form 1File: FORM 1_4B.pdf9 Mar 2026
Form 2File: FORM 2_4B.pdf9 Mar 2026
Form 3File: FORM3_4B.pdf9 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disc_4B.pdf9 Mar 2026
Form 5 (FY 2024-2025)File: FORM 5 RERA SPACE REALTY - 24-25 - 4B.pdf19 Jan 2026
Form 1File: FORM 1_4B.pdf9 Jan 2026
Form 2File: FORM 2_4B.pdf9 Jan 2026
Form 3File: FORM3_4B.pdf9 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disc_4B.pdf9 Jan 2026
Form 1File: FORM 1_4B.pdf30 Dec 2025
Form 2File: FORM 2_4B.pdf30 Dec 2025
Form 3File: FORM3_4B.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disc_4B.pdf30 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPACE REALTY 310324 4B.pdf12 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 RERA SPACE REALTY 31032024 4B.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf20 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf20 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPACE REALTY 310324 4B.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf24 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4B engineer certificate.pdf23 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4B ARCHITECT.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPACE REALTY 311223 4B.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPACE REALTY 300923 4B.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_FORM 1.pdf18 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTFICATE_FORM 2.pdf18 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf18 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 RERA SPACE REALTY - 22-23 4B.pdf16 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPACE REALTY 310323 4B UPLOAD.pdf12 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPACE REALTY 300623 4B UPLOAD.pdf12 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ENGINEER CERTFICATE_FORM 2.pdf15 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_FORM 1.pdf15 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTFICATE_FORM 2.pdf15 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM _3.pdf15 Mar 2023
Proforma of Allotment letterFile: POINT INCORPORATED IN AGREEMENT FOR SALE.pdf21 Feb 2023
Details of encumbrancesFile: ENCUMBRANCE.pdf20 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 RERA SPACE REALTY 31032022.pdf4 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory.pdf28 Oct 2022
Disclosure of sold/ booked inventoryFile: Disclosure.pdf16 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 RERA SPACE REALTY - FY 2020-21.pdf11 Mar 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf7 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf4 Jan 2022
Disclosure of sold/ booked inventoryFile: Disclosure.pdf18 Jun 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf27 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_05052018_.pdf8 Dec 2020
Layout approvalFile: 02_LAYOUT OF BUILDING NO 4 B.pdf5 Dec 2020
Layout approvalFile: 01_LAYOUT.pdf5 Dec 2020
Building plan approvalFile: 01_NA ORDER_27102006.pdf5 Dec 2020
Building plan approvalFile: 02_NA ORDER_02012018.pdf5 Dec 2020
PAN CardFile: 01_PAN_SPACE REALTY.pdf5 Dec 2020
PAN CardFile: 02_PAN_MAHABIR PRASAD.pdf5 Dec 2020
PAN CardFile: 03_PAN_SATISH.pdf5 Dec 2020
PAN CardFile: 04_PAN_HARISH.pdf5 Dec 2020
PAN CardFile: 05_PAN_NARENDRA GUPTA.pdf5 Dec 2020
Copy of the legal title reportFile: 01_TITLECERTIFICATE DATED_01012008.pdf5 Dec 2020
Copy of the legal title reportFile: 02_SUBSEQUENT TITLE CERTIFICATE_25032011.pdf5 Dec 2020
Copy of the legal title reportFile: 03_SUPPLEMENTARY TITLE CERTIFICATE_13122019.pdf5 Dec 2020
Details of encumbrancesFile: NO ENCUMBARANCE CERTIFICATE.pdf5 Dec 2020
Copy of Layout Approval (in case of layout)File: 01_LAYOUT.pdf5 Dec 2020
Copy of Layout Approval (in case of layout)File: 02_LAYOUT OF BUILDING NO 4 B.pdf5 Dec 2020
Building Plan Approval / NA Order for plotted developmentFile: 01_NA ORDER_27102006.pdf5 Dec 2020
Building Plan Approval / NA Order for plotted developmentFile: 02_NA ORDER_02012018.pdf5 Dec 2020
Declaration in FORM BFile: 01_FORM B_SPACE REALTY.pdf5 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_FORM 3.pdf5 Dec 2020
Proforma of Allotment letterFile: 01_SR_PROFORMA OF ALLOTMENT LETTER AND AGREEMENT FOR SALE.pdf5 Dec 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SPACES 912OPP PLEASANT PARK MIRA BHAYANDAR ROAD MIRA ROAD EAST THANE 40110766CompletedMar 2016Mar 2016

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SPACE RESIDENCE - II - BUILDING NO. 4 B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP. PLEASANT PARK7,600+ in Thane

2 kmSPACE RESIDENCE - II - BCompleted 88Lapsed / revoked 69Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 242 registered projects within 2 km.

Builder: SPACE REALTY

SPACE REALTY has 2 registrations on MahaRERA, including SPACE RESIDENCE - II - BUILDING NO. 4 B and SPACE RESIDENCE - II BUILDING NO. 4 A. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SPACE RESIDENCE - II - BUILDING NO. 4 B is delayed beyond 30 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SPACE RESIDENCE - II - BUILDING NO. 4 B?

The registered promoter entity is SPACE REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SPACE RESIDENCE - II - BUILDING NO. 4 B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SPACE RESIDENCE - II - BUILDING NO. 4 B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SPACE RESIDENCE - II - BUILDING NO. 4 B?

The professionals named in the filing: Architect: ANISH & ASSOCIATES; Architect: SOMAIYA & ASSOCIATES; Engineer: HIREN M TANNA; Chartered Accountant: HJT & ASSOCIATES; Chartered Accountant: HEMANT GAJENDRA JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SPACE RESIDENCE - II - BUILDING NO. 4 B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SPACE RESIDENCE - II - BUILDING NO. 4 B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SPACE RESIDENCE - II - BUILDING NO. 4 B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.