Home / Browse projects / Thane, Maharashtra / SPACE RESIDENCE - II - BUILDING NO. 4 B
SPACE RESIDENCE - II - BUILDING NO. 4 B
By SPACE REALTY
RG-MH-28959 · RERA P51700027464 · Last updated on MahaRERA portal: 25 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SPACE RESIDENCE - II - BUILDING NO. 4 B is a Residential / Group Housing project by SPACE REALTY in Thane, Maharashtra, registered with MahaRERA as P51700027464 on 11 Dec 2020. Possession is promised by 30 Jan 2027.
At a glance
Project
- NameSPACE RESIDENCE - II - BUILDING NO. 4 B
- TypeResidential / Group Housing
- Location
- MIRA BHAYANDER ROAD
- OPP. PLEASANT PARK
- Mira-Bhayandar (M Corp.)
- Thane
- 401107
- Pincode401107
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700027464
- ReraGenie IDRG-MH-28959
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Dec 2020
- Promised completion30 Jan 2027
- Revised completionNone
- Buildings1 building record
- Documents filed77 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 4 B | NA | 27 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 65%.
BUILDING NO 4 B: 67% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 40% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 45% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 15% |
Progress on shared amenities15
As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed75
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MARUTI DWELLERS PRIVATE LIMITED | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANISH & ASSOCIATES |
| Architect | SOMAIYA & ASSOCIATES |
| Engineer | HIREN M TANNA |
| Chartered Accountant | HJT & ASSOCIATES |
| Chartered Accountant | HEMANT GAJENDRA JOSHI |
| Partner | Role in project |
|---|---|
| SPACE REALTY | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Dec 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jan 2027
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1_4B.pdf | 25 May 2026 |
| Form 2File: FORM 2_4B.pdf | 25 May 2026 |
| Form 3File: FORM3_4B.pdf | 25 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc_4B.pdf | 25 May 2026 |
| Form 1File: FORM 1_4B.pdf | 9 Mar 2026 |
| Form 2File: FORM 2_4B.pdf | 9 Mar 2026 |
| Form 3File: FORM3_4B.pdf | 9 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc_4B.pdf | 9 Mar 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 RERA SPACE REALTY - 24-25 - 4B.pdf | 19 Jan 2026 |
| Form 1File: FORM 1_4B.pdf | 9 Jan 2026 |
| Form 2File: FORM 2_4B.pdf | 9 Jan 2026 |
| Form 3File: FORM3_4B.pdf | 9 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disc_4B.pdf | 9 Jan 2026 |
| Form 1File: FORM 1_4B.pdf | 30 Dec 2025 |
| Form 2File: FORM 2_4B.pdf | 30 Dec 2025 |
| Form 3File: FORM3_4B.pdf | 30 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Disc_4B.pdf | 30 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 13 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf | 13 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPACE REALTY 310324 4B.pdf | 12 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 RERA SPACE REALTY 31032024 4B.pdf | 12 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPACE REALTY 310324 4B.pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf | 24 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4B engineer certificate.pdf | 23 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4B ARCHITECT.pdf | 10 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 30 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf | 30 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPACE REALTY 311223 4B.pdf | 25 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPACE REALTY 300923 4B.pdf | 7 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_FORM 1.pdf | 18 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTFICATE_FORM 2.pdf | 18 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf | 18 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 RERA SPACE REALTY - 22-23 4B.pdf | 16 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPACE REALTY 310323 4B UPLOAD.pdf | 12 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SPACE REALTY 300623 4B UPLOAD.pdf | 12 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ENGINEER CERTFICATE_FORM 2.pdf | 15 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_FORM 1.pdf | 15 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTFICATE_FORM 2.pdf | 15 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM _3.pdf | 15 Mar 2023 |
| Proforma of Allotment letterFile: POINT INCORPORATED IN AGREEMENT FOR SALE.pdf | 21 Feb 2023 |
| Details of encumbrancesFile: ENCUMBRANCE.pdf | 20 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 RERA SPACE REALTY 31032022.pdf | 4 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory.pdf | 28 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 16 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 RERA SPACE REALTY - FY 2020-21.pdf | 11 Mar 2022 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf | 7 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 4 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 18 Jun 2021 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf | 27 Apr 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_05052018_.pdf | 8 Dec 2020 |
| Layout approvalFile: 02_LAYOUT OF BUILDING NO 4 B.pdf | 5 Dec 2020 |
| Layout approvalFile: 01_LAYOUT.pdf | 5 Dec 2020 |
| Building plan approvalFile: 01_NA ORDER_27102006.pdf | 5 Dec 2020 |
| Building plan approvalFile: 02_NA ORDER_02012018.pdf | 5 Dec 2020 |
| PAN CardFile: 01_PAN_SPACE REALTY.pdf | 5 Dec 2020 |
| PAN CardFile: 02_PAN_MAHABIR PRASAD.pdf | 5 Dec 2020 |
| PAN CardFile: 03_PAN_SATISH.pdf | 5 Dec 2020 |
| PAN CardFile: 04_PAN_HARISH.pdf | 5 Dec 2020 |
| PAN CardFile: 05_PAN_NARENDRA GUPTA.pdf | 5 Dec 2020 |
| Copy of the legal title reportFile: 01_TITLECERTIFICATE DATED_01012008.pdf | 5 Dec 2020 |
| Copy of the legal title reportFile: 02_SUBSEQUENT TITLE CERTIFICATE_25032011.pdf | 5 Dec 2020 |
| Copy of the legal title reportFile: 03_SUPPLEMENTARY TITLE CERTIFICATE_13122019.pdf | 5 Dec 2020 |
| Details of encumbrancesFile: NO ENCUMBARANCE CERTIFICATE.pdf | 5 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: 01_LAYOUT.pdf | 5 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: 02_LAYOUT OF BUILDING NO 4 B.pdf | 5 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 01_NA ORDER_27102006.pdf | 5 Dec 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: 02_NA ORDER_02012018.pdf | 5 Dec 2020 |
| Declaration in FORM BFile: 01_FORM B_SPACE REALTY.pdf | 5 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_FORM 3.pdf | 5 Dec 2020 |
| Proforma of Allotment letterFile: 01_SR_PROFORMA OF ALLOTMENT LETTER AND AGREEMENT FOR SALE.pdf | 5 Dec 2020 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SPACES 912 | OPP PLEASANT PARK MIRA BHAYANDAR ROAD MIRA ROAD EAST THANE 401107 | 66 | Completed | Mar 2016 | Mar 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SPACE RESIDENCE - II - BUILDING NO. 4 B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near OPP. PLEASANT PARK7,600+ in Thane
Filed coordinates, straight-line distance. 242 registered projects within 2 km.
Codename StarLife
JP Infra Realty Private Limited
Prestige Garden Trails
PRESTIGE ESTATES PROJECTS LIMITED
TIARA HILLS PHASE I BLDG NO 3, 5 AND 2
PNK SPACE DEVELOPMENT PVT LTD
The Palace Tower B
JP Infra Realty Private Limited
Sector 2A - Wings JKL
Eversmile Properties Private Limited
CRESCENT WTC - WESTERN TRADE CENTER - PHASE -
CRESCENT SHELTERS
See every Thane project, with the district possession charts
Builder: SPACE REALTY
SPACE REALTY has 2 registrations on MahaRERA, including SPACE RESIDENCE - II - BUILDING NO. 4 B and SPACE RESIDENCE - II BUILDING NO. 4 A. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SPACE RESIDENCE - II - BUILDING NO. 4 B is delayed beyond 30 Jan 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SPACE RESIDENCE - II - BUILDING NO. 4 B?
The registered promoter entity is SPACE REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SPACE RESIDENCE - II - BUILDING NO. 4 B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SPACE RESIDENCE - II - BUILDING NO. 4 B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SPACE RESIDENCE - II - BUILDING NO. 4 B?
The professionals named in the filing: Architect: ANISH & ASSOCIATES; Architect: SOMAIYA & ASSOCIATES; Engineer: HIREN M TANNA; Chartered Accountant: HJT & ASSOCIATES; Chartered Accountant: HEMANT GAJENDRA JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SPACE RESIDENCE - II - BUILDING NO. 4 B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback