Completed No litigation declared Plotted project

Soumitra Layout

By Soumitra Promoter and Developer

RG-MH-38295 · RERA P50500023881 · Last updated on MahaRERA portal: 24 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
19 of 64Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Soumitra Layout is a Plotted project by Soumitra Promoter and Developer in Nagpur, Maharashtra, registered with MahaRERA as P50500023881 on 9 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2025. 45 of the 64 units on this registration are recorded sold or booked.

At a glance

Project

  • NameSoumitra Layout
  • TypePlotted
  • Location
    • Bus Stop
    • Waddhamna
    • Hingna
    • Nagpur
    • 440023
  • Pincode440023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500023881
  • ReraGenie IDRG-MH-38295

Builder

  • NameSoumitra Promoter and Developer
  • Entity typeOthers
  • Authorizes SignatoryAshok Gokate Gokate
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJan 2020PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Jan 2020
  • Promised completion30 Dec 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed91 files

Current status

70%45 of 64 units booked

Figures as on 24 Jul 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 24 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area24,200 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Sep 2024

Approvals and building plan

Sanctioning authorityNMRDA Nagpur

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchN I T COMPLEX WEST HIGH COURT ROAD GOKULPET DIST NAGPUR 440 010

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwapnil Palandurkar
EngineerSwapnil Palandurkar
Chartered AccountantRishi Lashkare
Chartered AccountantRavindra Lashkare
PartnerRole in project
Soumitra Promoter and Developer-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Jul 2025

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: CC & Email Verification Doc.pdf24 Jul 2025
Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf18 Jun 2025
Form 5 (FY 2021-2022)File: Form 5 2021-22.pdf23 May 2025
Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf23 May 2025
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf23 May 2025
Form 1File: Form 1 Apr to Jun 2023.pdf22 May 2025
Form 2File: Form 2 Apr to Jun 2023.pdf22 May 2025
Form 3File: Form 3 Apr to Jun 2023.pdf22 May 2025
Form 2File: Form 2 Jan to Mar 2023.pdf22 May 2025
Form 3File: Form 3 Jan to Mar 2023.pdf22 May 2025
Form 1File: Form 1 Jan to Mar 2023.pdf22 May 2025
Form 1File: Form 1 July to Sep 2023.pdf22 May 2025
Form 2File: Form 2 July to Sep 2023.pdf22 May 2025
Form 3File: Form 3 July to Sep 2023.pdf22 May 2025
Form 1File: Form 1 Oct to Dec 2023.pdf22 May 2025
Form 2File: Form 2 Oct to Dec 2023.pdf22 May 2025
Form 3File: Form 3 Oct to Dec 2023.pdf22 May 2025
Form 1File: Form 1 Jan to Mar 2024.pdf22 May 2025
Form 2File: Form 2 Jan to Mar 2024.pdf22 May 2025
Form 3File: Form 3 Jan to Mar 2024.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: Q-Jan to Mar 2024.pdf22 May 2025
Form 1File: Form 1 Apr to Jun 2024.pdf22 May 2025
Form 2File: Form 2 Apr to Jun 2024.pdf22 May 2025
Form 3File: Form 3 Apr to Jun 2024.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: Q-Apr to Jun 2024.pdf22 May 2025
Form 1File: Form 1 Oct to Dec 2024.pdf22 May 2025
Form 2File: Form 2 Oct to Dec 2024.pdf22 May 2025
Form 3File: Form 3 Oct to Dec 2024.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: Q-Oct to Dec 2024.pdf22 May 2025
Form 1File: Form 1 Jan to Mar 2025.pdf22 May 2025
Form 2File: Form 2 Jan to Mar 2025.pdf22 May 2025
Form 3File: Form 3 Jan to Mar 2025.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: Q-Jan to Mar 2025.pdf22 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan to Mar 2025.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan to Mar 2025.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan to Mar 2025.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Q-Jan to Mar 2025.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct to Dec 2024.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Oct to Dec 2024.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Q-Oct to Dec 2024.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 July Sep 2024.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 July to Sep 2024.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July to Sep 2024.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Q-July to Sep 2024.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Apr to Jun 2024.pdf14 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Apr to Jun 2024.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Apr to Jun 2024.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Apr to Jun 2024.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan to Mar 2024.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan to Mar 2024.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan to Mar 2024.pdf2 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf2 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q-1 Jan to Mar 2023.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q-2 Apr to Jun 2023.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q-3 July to Sep 2023.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q-4 Oct to Dec 2023.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf1 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-1 Jan to Mar 2023.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-2 Apr to Jun 2023.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-3 July to Sep 2023.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-4 Oct to Dec 2023.pdf27 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q-1 Jan to Mar 2023.pdf27 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q-2 Apr to Jun 2023.pdf27 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q-3 July to Sep 2023.pdf27 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q-4 Oct to Dec 2023.pdf27 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold and Unsold Jan to Dec 2023.pdf27 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf1 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 31 12 2023 opt.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Soumitra Rera Form 5 - 2021 22_opt.pdf28 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Soumitra Rera Form 5 - 2021 22_opt.pdf28 Mar 2023
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf14 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2020.pdf17 Mar 2021
Proforma of Allotment letterFile: Draft Sale Deed RS.pdf22 Sep 2020
Layout approvalFile: Building Plan Approval RS.pdf3 Jan 2020
PAN CardFile: PAN.pdf3 Jan 2020
Copy of Layout Approval (in case of layout)File: Building Plan Approval RS.pdf3 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate RS.pdf3 Jan 2020

How this compares with Nagpur

70%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Soumitra Layout on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Waddhamna2,800+ in Nagpur

2 kmSoumitra LayoutCompleted 5Lapsed / revoked 3Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 17 registered projects within 2 km.

Builder: Soumitra Promoter and Developer

Soumitra Promoter and Developer has 2 registrations on MahaRERA, including Soumitra Layout and Soumitra Nagar Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Soumitra Layout is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Soumitra Layout?

The registered promoter entity is Soumitra Promoter and Developer, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Soumitra Layout?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Soumitra Layout?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Soumitra Layout?

The professionals named in the filing: Architect: Swapnil Palandurkar; Engineer: Swapnil Palandurkar; Chartered Accountant: Rishi Lashkare; Chartered Accountant: Ravindra Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Soumitra Layout?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Soumitra Layout. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Soumitra Layout to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.