Home / Browse projects / Kolhapur, Maharashtra / SONAI COMPLEX
SONAI COMPLEX
RG-MH-15913 · RERA P53000024358 · Last updated on MahaRERA portal: 27 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SONAI COMPLEX is a Others project by VISION REALITIES in Kolhapur, Maharashtra, registered with MahaRERA as P53000024358 on 7 Feb 2020. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameSONAI COMPLEX
- TypeOthers
- Location
- CTS NO 17120 NEAR KALPANA CHITRA MANDIR ICHALKARANJI
- NEAR KALPANA CHITRA MANDIR
- Ichalkaranji (M Cl)
- Hatkanangle
- Kolhapur
- 416115
- Pincode416115
- RERA no.P53000024358
- ReraGenie IDRG-MH-15913
Builder
- NameVISION REALITIES
- Entity typePartnership
- PartnersMAHAVIR DHANPAL PATIL, amar sambhaji patil, pravin prakash patil, AMITKUMAR ARVIND PATIL, PALLAVI TATYASAHEB patil, SMITA MAHAVIR PATIL
- Other registrations2 more →
- Completed2 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on7 Feb 2020
- Promised completion30 Dec 2025
- Revised completionRevised to 30 Dec 2025 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed119 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SONAI COMPLEX | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SONAI COMPLEX: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed20
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ANNASO BAPUSO YEWARE | Ichalkaranji (M Cl) | Kolhapur |
| dhanyakumar bapusaheb yeware | Ichalkaranji (M Cl) | Kolhapur |
| SUKUMAR BAPU YEWARE | Ichalkaranji (M Cl) | Kolhapur |
| DHARMENDRA NARSINH YEWARE | Ichalkaranji (M Cl) | Kolhapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | vitthal todkar |
| Engineer | KIRAN PAWAR |
| Chartered Accountant | megha mahesh jadhav |
| Partner | Role in project |
|---|---|
| VISION REALITIES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO TEKAN REVISED PERMISSION ALSO I HAVE RECEIVED OCCUPANCY CERTIFICATE THE DT 18/03/2025 PROJECT 100% COMPLETED AN EXTENSION IS NEEDED FOR THE TIME.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jan 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jan 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Mar 2025
Documents filed119
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OCCUPANCY _SONAI COMPLEX.pdf | 27 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24 SONAI.pdf | 24 Mar 2025 |
| Building plan approvalFile: REVISED SANCTION PLAN 1.pdf | 14 Mar 2025 |
| Building plan approvalFile: REVISED SANCTION PLAN 2.pdf | 14 Mar 2025 |
| Declaration in FORM BFile: affidavit cum declarastion FORM B.pdf | 14 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED SANCTION LETTER.pdf | 14 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: REVISED SANCTION PLAN 1.pdf | 14 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: REVISED SANCTION PLAN 2.pdf | 14 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JULY TO SEPT 2020.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APRIL TO JUNE 2020.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31-12-2024.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JULY TO SEPT 2024.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APRIL TO JUNE 2024.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JAN TO MARCH 2024.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JULY TO SEPTE 2023.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 2023.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JAN TO MARCH 2023.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 OCTO TO DEC 2022.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 APRIL TO JUNE 2022.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JAN TO MARCH 2022.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 OCTO TO DEC 2021.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JULY TO SEPT 2021.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APRIL TO JUNE 2021.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JAN TO MARCH 2021.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 OCTO TO DEC 2020.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT 22.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 31-12-24.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 30-09-24.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 30-06-24.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 31-03-24.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 OCTO TO DEC 2024.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 JULY TO SEPT 2024.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 APRIL TO JUNE 2024.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 JAN TO MARCH 2024.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 OCT TO DEC 2023.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 JULY TO SEPT 2023.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 APRIL TO JUNE 2023.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 JAN TO MARCH 2022.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 JAN TO MARCH 2023.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 OCT TO DEC 2022.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 APRIL TO JUNE 2022.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 OCT TO DEC 2021.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 JULY TO SEPT 2021.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 APRIL TO JUNE 2021.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 JAN TO MARCH 2021.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 OCT TO DEC 2020.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 JULY TO SEPT 2020.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 APRIL TO JUNE 2020.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM- 2 JULY TO SEPT 2022.pdf | 28 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM - 2A 2019-2020.pdf | 28 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM- 2A 2020-21.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD OCT TO DEC 2024.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JULY TO SEPT 2024.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JULY TO SEPT 2020.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD APRIL TO JUNE 2024.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JAN TO MARCH 2024.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD OCT TO DEC 2023.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD OCT TO DEC 2021.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JULY TO SEPT 2021.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD APRIL TO JUNE 2021.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JAN TO MARCH 2021.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD OCT TO DEC 2020.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD APRIL TO JUNE 2020.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD JAN TO MARCH 2020.pdf | 28 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM- 2A 2021-22.pdf | 28 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM- 2A 2022-23.pdf | 28 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM- 2A 2023-24.pdf | 28 Feb 2025 |
| Details of encumbrancesFile: ENCUMBRANCE CERTIFICATE SONAI.pdf | 30 Mar 2024 |
| Building plan approvalFile: dwg.pdf | 6 Mar 2024 |
| Building plan approvalFile: dwg 2.pdf | 6 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: dwg.pdf | 6 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: dwg 2.pdf | 6 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE- 7-4-2023.pdf | 6 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - 7-10-23.pdf | 6 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CER - 7-1-2024.pdf | 6 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - APRIL 2022 TO MARCH 2023.pdf | 6 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - APRIL 2023 TO JUNE 2023.pdf | 6 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - JULY 2023 TO DEC 2023.pdf | 6 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ASSURANCE CERTIFICATE - 7-4-2020.pdf | 6 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE CERTIFICATE - 7-4-2022.pdf | 6 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 119 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SONAI COMPLEX on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR KALPANA CHITRA MANDIR880+ in Kolhapur
Gajalaxmi Park
Amit Yashwant Singh and Others
Vrindavan Paradise
HBD DEVELOPERS
Vihanga Residency
INDO BUILDCON DEVELOPERS
CHOUNDESHWARI PLANET
VIJAY VIRUPAKSHA GALGALE
VATHARE ELITES
JAHIR CHANDSAB SOUDAGAR
NISARGAYAN
SIDRA DEVELOPERS
See every Kolhapur project, with the district possession charts
Builder: VISION REALITIES
VISION REALITIES has 3 registrations on MahaRERA, including HERAMB RESIDENCY and KALPVRUKSH RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What does it mean that SONAI COMPLEX shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SONAI COMPLEX is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SONAI COMPLEX?
The registered promoter entity is VISION REALITIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SONAI COMPLEX?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SONAI COMPLEX?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SONAI COMPLEX?
The professionals named in the filing: Architect: vitthal todkar; Engineer: KIRAN PAWAR; Chartered Accountant: megha mahesh jadhav. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SONAI COMPLEX?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback