ReraGenieLog inGet a buyer report

Home / Browse projects / Kolhapur, Maharashtra / VATHARE ELITES

Registered No litigation declared Residential / Group Housing project

VATHARE ELITES

By JAHIR CHANDSAB SOUDAGAR

RG-MH-99263 · RERA P53000053102 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 80%
31 of 60Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 124 documents Report an error

VATHARE ELITES is a Residential / Group Housing project by JAHIR CHANDSAB SOUDAGAR in Kolhapur, Maharashtra, registered with MahaRERA as P53000053102 on 16 Oct 2023. Possession is promised by 25 Sep 2027. 29 of the 60 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameVATHARE ELITES
  • TypeResidential / Group Housing
  • Location
    • MADHUBAN SOCIETY ROAD
    • DKTE MARATHI MEDIUM SCHOOL NARAYAN MALA
    • Ichalkaranji (M Cl)
    • Hatkanangle
    • Kolhapur
    • 416115
  • Pincode416115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000053102
  • ReraGenie IDRG-MH-99263

Builder

  • NameJAHIR CHANDSAB SOUDAGAR
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2023PromisedSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Oct 2023
  • Promised completion25 Sep 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed124 files

Current status

48%29 of 60 units booked
62.4%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VATHARE ELITESNA5560060

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

VATHARE ELITES: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,248 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jun 2025
LandownerVillageDistrict
JAHIR CHANDSAB SOUDAGARIchalkaranji (M Cl)Kolhapur
KALLAPPA BALU VATHAREIchalkaranji (M Cl)Kolhapur
RAVSAHEB APPASO VATHAREIchalkaranji (M Cl)Kolhapur
MAHAVIR BALU VATHAREIchalkaranji (M Cl)Kolhapur
ABHIJIT JAYPAL VATHAREIchalkaranji (M Cl)Kolhapur
BHARMU BABU VATHAREIchalkaranji (M Cl)Kolhapur
RAMCHANDRA BHAU VATHAREIchalkaranji (M Cl)Kolhapur

Approvals and building plan

Sanctioning authorityICHALKARANJI MUNCIPAL CORPORATION
Permissible FSI8488.49
Proposed, not sanctioned3,855 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICHALKARANJI
Estimated costRs 7.21 cr
Cost incurredRs 4.50 cr
Work done62.44%
BuildingWingEstimatedIncurred
VATHARE ELITESNARs 7.16 crRs 4.50 cr
-NARs 5.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANTOSH RAOSAHEB BHISE
EngineerSANTOSH RAOSAHEB BHISE
EngineerShree.Ram COnstructions
Chartered AccountantSUSHANT BALASAHEB DEVNAL
PartnerRole in project
JAHIR CHANDSAB SOUDAGAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 25 Sep 2027

Documents filed124

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 124 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 SIGNED.pdf21 May 2026
Withdrawal Update Form 2File: Form 2 - signed.pdf21 May 2026
Withdrawal Update Form 3File: Form 3 - signed.pdf21 May 2026
Withdrawal Update Form 1File: FORM 1.pdf10 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf10 Mar 2026
Withdrawal Update Form 3File: FORM 3_compressed.pdf10 Mar 2026
Withdrawal Update Form 1File: form 1 vatare.pdf9 Dec 2025
Withdrawal Update Form 1File: form 1 vatare.pdf9 Dec 2025
Withdrawal Update Form 1File: form 1 vatare.pdf9 Dec 2025
Withdrawal Update Form 1File: form 1 vatare.pdf9 Dec 2025
Withdrawal Update Form 1File: form 1 vatare.pdf9 Dec 2025
Withdrawal Update Form 2File: form 2 vatare.pdf9 Dec 2025
Withdrawal Update Form 2File: form 2 vatare.pdf9 Dec 2025
Withdrawal Update Form 2File: form 2 vatare.pdf9 Dec 2025
Withdrawal Update Form 2File: form 2 vatare.pdf9 Dec 2025
Withdrawal Update Form 2File: form 2 vatare.pdf9 Dec 2025
Withdrawal Update Form 3File: Form 3 New.pdf9 Dec 2025
Withdrawal Update Form 3File: Form 3 New.pdf9 Dec 2025
Withdrawal Update Form 3File: Form 3 New.pdf9 Dec 2025
Withdrawal Update Form 3File: Form 3 New.pdf9 Dec 2025
Withdrawal Update Form 3File: Form 3 New.pdf9 Dec 2025
Form 5 (FY 2024-2025)File: Form 5_ Vathare.pdf9 Dec 2025
Withdrawal Update Form 1File: form 1 vatare.pdf8 Dec 2025
Withdrawal Update Form 1File: form 1 vatare.pdf8 Dec 2025
Withdrawal Update Form 2File: form 2 vatare.pdf8 Dec 2025
Withdrawal Update Form 2File: form 2 vatare.pdf8 Dec 2025
Withdrawal Update Form 3File: Form 3 06 10 25.pdf8 Dec 2025
Withdrawal Update Form 3File: Form 3 06 10 25.pdf8 Dec 2025
Form 2A (FY 2024-2025)File: form 2a vatare.pdf11 Nov 2025
Form 1File: Form 1 _ 06 10 25.pdf7 Oct 2025
Form 2File: Form 2 06 10 25.pdf7 Oct 2025
Form 3File: Form 3 06 10 25.pdf7 Oct 2025
Disclosure of Sold and Booked InventoryFile: disclosure.pdf7 Oct 2025
Withdrawal Update Form 1File: Form 1 _ 06 10 25.pdf7 Oct 2025
Withdrawal Update Form 2File: Form 2 06 10 25.pdf7 Oct 2025
Withdrawal Update Form 3File: Form 3 06 10 25.pdf7 Oct 2025
Form 1File: Form 1.pdf28 Jun 2025
Form 2File: Form 2.pdf28 Jun 2025
Form 3File: Form 3 (2).pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: Dislosure.pdf28 Jun 2025
Withdrawal Update Form 1File: Form 1.pdf28 Jun 2025
Withdrawal Update Form 2File: Form 2.pdf28 Jun 2025
Withdrawal Update Form 3File: FORM 3 -CA CERTIFICATE-6.pdf28 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 4_compressed.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 5_compressed.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 3_compressed.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 2 C.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 C.pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 B.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 C.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 D.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 E.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 A.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 N C.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 D C.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 B C.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 A.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 1.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 C.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 D.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 A.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 B.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 E.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: INVENTORY.pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf19 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf19 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: certificate of renewal CC.pdf11 Oct 2023
Declaration about Commencement CertificateFile: REVISED DECLARTION FOR CC 001.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 -CA CERTIFICATE-6.pdf13 Sep 2023
Building plan approvalFile: form for renewal of building permission.pdf6 Sep 2023
Building plan approvalFile: certificate of renewal CC.pdf6 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: form for renewal of building permission.pdf6 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: certificate of renewal CC.pdf6 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Revised deviation agreement for sale.pdf20 May 2023
Proforma of Agreement for saleFile: revised agreement for sale-3.pdf18 May 2023
Other - TechnicalFile: letter to maharera.pdf13 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Corrected Disclosure of interest in other real estate organization.pdf8 May 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SUNCITYYADRAV FATA YADRAV3CompletedFeb 2016Late, Sep 2016

How this compares with Kolhapur

48%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep VATHARE ELITES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DKTE MARATHI MEDIUM SCHOOL NARAYAN MALA880+ in Kolhapur

2 kmVATHARE ELITESCompleted 3Lapsed / revoked 2Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: JAHIR CHANDSAB SOUDAGAR

JAHIR CHANDSAB SOUDAGAR has 1 registration on MahaRERA, including VATHARE ELITES. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if VATHARE ELITES is delayed beyond 25 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VATHARE ELITES?

The registered promoter entity is JAHIR CHANDSAB SOUDAGAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VATHARE ELITES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VATHARE ELITES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VATHARE ELITES?

The professionals named in the filing: Architect: SANTOSH RAOSAHEB BHISE; Engineer: SANTOSH RAOSAHEB BHISE; Engineer: Shree.Ram COnstructions; Chartered Accountant: SUSHANT BALASAHEB DEVNAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VATHARE ELITES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VATHARE ELITES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VATHARE ELITES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.