ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SOMANI DREAM HOME PHASE II

Registration lapsed No litigation declared Residential / Group Housing project

SOMANI DREAM HOME PHASE II

By FAST REALTY PVT LTD

RG-MH-26625 · RERA P52100014395 · Last updated on MahaRERA portal: 26 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
8 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 60%
1Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

SOMANI DREAM HOME PHASE II is a Residential / Group Housing project by FAST REALTY PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100014395 on 29 Nov 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 6 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSOMANI DREAM HOME PHASE II
  • TypeResidential / Group Housing
  • Location
    • Punawale
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100014395
  • ReraGenie IDRG-MH-26625

Builder

  • NameFAST REALTY PVT LTD
  • Entity typeCompany
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

40 months past promisethis monthRegisteredNov 2017First promiseDec 2022Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Nov 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Dec 2022)
  • Buildings2 building records
  • Documents filed52 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C WINGNA140000
D WINGNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 26 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 60%.

C WING49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.29%
D WING49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.29%

Progress on shared amenities15

As on 26 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed150

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots150
Closed/Covered120
Open Space30
BuildingClosed/CoveredOpen SpaceTotal
C WING601575
D WING601575

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,000 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI49339.06
Proposed, not sanctioned10,038 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSILVER APARTMENT SHANKAR GHANEKAR MARG PRABHADEVI 400025

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR SHARAD PAKDHANE
PartnerRole in project
FAST REALTY PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100013586Dec 2022 → Jun 2023

Reason as filed by the promoterour above project is 100% ready. we applied PCMC for OC. This process is under govt dept. but due to RERA period is expired on 30/12/2022 our most of the customers flat registration is pending. we are facing problem of finance. we are giving possession to our customers within 2 months. so that we require extension for 6 month 30/06/2023 as per RERA norms

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000023240Latika Sudhir JadhavNITIN SOMANI15/07/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Nov 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Jan 2025

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: somani dream home phase 2 wing C and D form 1.pdf26 Apr 2025
Certificates of CA (Form 3)File: FORM 3 (REVISED) - CA CERTIFICATE EXCEL VERSION (1) (1).pdf26 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC COPY-E.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2-ENGINEER-FY-2022-23 (1).pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2-JUN-2023.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2-SEP-2023.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2-NOV-2023.pdf31 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-FY-2022-23-ENGG.pdf30 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf30 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR-2022-CD.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: CERCULAR-29-CD.pdf19 Jan 2023
Certificates of CA (Form 3)File: CA-2018-FORM-3-CD.pdf19 Jan 2023
Certificates of CA (Form 3)File: CA-2019-FORM-3-CD.pdf19 Jan 2023
Certificates of CA (Form 3)File: CA-2020-FORM-3-CD.pdf19 Jan 2023
Certificates of CA (Form 3)File: CA-2021-FORM-3-CD.pdf19 Jan 2023
Certificates of CA (Form 3)File: CA-2022-FORM-3-CD.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA-2021-22-FORM-5.pdf19 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A-PHASEIII-2020.pdf17 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A-PHASEIII-2021.pdf17 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form-2A-PHASEII.pdf17 Jan 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES.pdf11 Jan 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCES.pdf11 Jan 2023
Declaration about Commencement CertificateFile: PRAMOTER CONCENT.pdf11 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: E-2019-20_compressed.pdf11 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: E-2020-21.pdf11 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: C-2020-21.pdf11 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: C-2017-18.pdf11 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: C-2018-19.pdf11 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: C-2019-20.pdf11 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: C-2020-21.pdf11 Jan 2023
OtherFile: 08172020154147.pdf12 Dec 2020
OtherFile: 08172020154208.pdf12 Dec 2020
OtherFile: 08172020154245.pdf12 Dec 2020
OtherFile: 08172020154305.pdf12 Dec 2020
OtherFile: 08172020154344.pdf12 Dec 2020
OtherFile: 08172020154421.pdf12 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: commencement_cetificates.pdf26 Mar 2018
Proforma of Allotment letterFile: AGREEMENT-NEW.pdf23 Nov 2017
Layout approvalFile: in_case_of_layout.pdf22 Nov 2017
Building plan approvalFile: commencement_cetificates.pdf22 Nov 2017
PAN CardFile: FAST REALTY PVT LTD pancard_1.pdf22 Nov 2017
Copy of the legal title reportFile: the_legal_title_report.pdf22 Nov 2017
Details of encumbrancesFile: Encumbrances NEW.PDF22 Nov 2017
Copy of Layout Approval (in case of layout)File: in_case_of_layout.pdf22 Nov 2017
Building Plan Approval (IOD)File: commencement_cetificates.pdf22 Nov 2017
Declaration in FORM BFile: FORM B NEW.pdf22 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: certificates_of_architect_form_1.pdf22 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE NEW.pdf22 Nov 2017
Certificates of CA (Form 3)File: certificates_f_ca_form_3.pdf22 Nov 2017
Proforma of Allotment letterFile: ALLORTMENT-NEW.pdf22 Nov 2017
OtherFile: RESOLUTION - NEW.pdf22 Nov 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SOMANI DREAM HOME PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Punawale13,700+ in Pune

2 kmSOMANI DREAM HOME PHASE Completed 62Lapsed / revoked 22Other 78Dot size: filed unitsN

Filed coordinates, straight-line distance. 162 registered projects within 2 km.

Builder: FAST REALTY PVT LTD

FAST REALTY PVT LTD has 4 registrations on MahaRERA, including SOMANI DREAM HOME PHASE - 1 and SOMANI DREAM HOME PHASE II. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SOMANI DREAM HOME PHASE II shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SOMANI DREAM HOME PHASE II is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SOMANI DREAM HOME PHASE II?

The registered promoter entity is FAST REALTY PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SOMANI DREAM HOME PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SOMANI DREAM HOME PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SOMANI DREAM HOME PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SOMANI DREAM HOME PHASE II?

The professionals named in the filing: Architect: MR SHARAD PAKDHANE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SOMANI DREAM HOME PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SOMANI DREAM HOME PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SOMANI DREAM HOME PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.